Loading...
HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS - ODP - 32-98 - CORRESPONDENCE - MEETING COMMUNICATION (3)July 22, 1998 Page 2 4. The City of Fort Collins will explore the possible ways to accomplish this task; Matt Baker will take the lead on this. 5. Sear -Brown and JR Engineering will set a separate meeting to establish the Harmony - Timberline Intersection Design as soon as possible for the ongoing projects of PVH and Dial. Issues in this area include the following: • Historic Gas Station location • Proposed Electric Line • Warren Lake Outfall Ditch • 30" Water Main • Railroad Crossing • Alignment w/ North Timberline • Timberline access coordination 6. The Harmony School Shop, I't or 2nd plans, do not show the ultimate widened north edge of pavement per 6 lane arterial standards. The cost for future widening will is the responsibility of the others. 7. Median noses are required to provide pedestrian refuges. 8. An 8' bike lane is recommended by the city on Harmony. cc: attendees Bruce Hendee, bha Bob Walsh, AKA File THE SEAL -BROWN GROUP MEETING MINUTES SUBJECT: Harmony Road Coordination DATE: 7/14/98 TIME: 10:00 PLACE: City of Fort Collins ATTENDEES REPRESENTING Tim Blandford Matt Baker Mike Ludwig Sheri Wamhoff Basil Hamdan Leanne Harter Kathleen Reavis Dave Stringer Matt Delich David Klockeman Patricia Kroetch Theresa Michalak Alisa Babler Pam Miller City of Fort Collins City of Fort Collins City of Fort Collins City of Fort Collins City of Fort Collins City of Fort Collins City of Fort Collins City of Fort Collins Traffic Consultant JR Engineering JR Engineering Sear -Brown Group Sear -Brown Group Sear -Brown Group The following items were discussed: Project No. Date Issued: 7/16/98 1. Harmony Road is influenced by several projects currently being designed or in construction phase. These projects include Celestica, Harmony Village, Symbios, Harmony School Shops, Dial, and Poudre Valley Hospital among others. 2. The concern for establishing abase line for Harmony Road creating a uniformed foundation for control and identify existing constraints was discussed. This base line would incorporate the existing State coordinates and include County Road 7 to Lemay as a minimum. 3. Some of the constraints that need to be considered are as follows: a Trees, ditches o Utilities m Existing Strictures (Both Historic and Not) ® ROW, grading