HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS - ODP - 32-98 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWdesign
Leanne Harter
Poudre Valley Health Systems - Harmony Campus
Page 2
contacted by Sear Brown Group
4. Light and Power - Acknowledged. Alan Rutz has been contacted by
Albert Kahn and Associates
5. Engineering - Acknowledged. BHA Design and Sear Brown Group
have been in contact with Tim Blanford.
6. Poudre Fire Authority - Acknowledged. Albert Kahn Associates
and BHA Design have been in direct contact with Ron Gaonzales.
7. Transportation Planning - Acknowledged. BHA Design and Sear
Brown and Matt Delich have been in direct contact with Eric Bracke
and Kathleen Reavis.
8. Current Planning - Acknowledged. BHA has been in direct contact
with planning as well as with Les Kaplan. In addition, a
neighborhood meeting has been conducted.
We have also addressed the issues raised during the PDP Conceptual Review
Meeting on June 15, 1998 through our numerous meetings with staff. We
will continue to address these issues as they are raised through the submittal
comment process.
The attached set of documents meets the requirements of the application
process and includes the various documents required for submittal.
Sincerely,
bha ftsign inc. by
Bruce A. Hen ee, ASLA
President
July 23, 1998
Ms. Leanne Harter, AICP
City Planner
City of Fort Collins Planning
281 N. College Ave.
Fort Collins, CO 80521
design
LANDSCAPE ARCHITECTURE
URBAN DESIGN
PLANNING
BHA DESIGN, INC.
RE: Poudre Valley Health Systems ODP and First Phase PDP I305 INNOVATION DRIVE
Dear Leanne,
We are pleased to submit the ODP and PDP for the first phase of
development for the proposed Poudre Valley Health Systems Harmony
Campus. As you know we have met a number of times to review this project
and have also met a number of times with other departments to review
infrastructure issues. The attached submittal represents a beginning of our
response to issues you have raised as well as comments we have received
from other departments. I would like to point out that because of recent
changes suggested by the planning and engineering departments, we have
not been able to complete the most recent plan revisions requested. We will
continue revising these plans over the next few weeks while you review our
first submittal but, would request that you and other departments use this
initial plan set as a means of identifying major concerns.
Outlined below is a brief response to our Conceptual Review letter for this
project for the ODP.
Response to Conceptual Review
The following items are responses to the Conceptual Review summary letter
dated March 2, 1998. Responses are numbered according to the numbers of
the comments on the Conceptual Review letter.
1. Zoning - Acknowledged. All criteria are met
2. Water/Wastewater - Conditions acknowledged. An overall utility
plan is included with this submittal. Roger Buffington has been
contacted by Sear Brown Group
3. Stormwater - Comments acknowledged. Glen Schleuter has been