HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS - ODP - 32-98 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWdesign Leanne Harter Poudre Valley Health Systems - Harmony Campus Page 2 contacted by Sear Brown Group 4. Light and Power - Acknowledged. Alan Rutz has been contacted by Albert Kahn and Associates 5. Engineering - Acknowledged. BHA Design and Sear Brown Group have been in contact with Tim Blanford. 6. Poudre Fire Authority - Acknowledged. Albert Kahn Associates and BHA Design have been in direct contact with Ron Gaonzales. 7. Transportation Planning - Acknowledged. BHA Design and Sear Brown and Matt Delich have been in direct contact with Eric Bracke and Kathleen Reavis. 8. Current Planning - Acknowledged. BHA has been in direct contact with planning as well as with Les Kaplan. In addition, a neighborhood meeting has been conducted. We have also addressed the issues raised during the PDP Conceptual Review Meeting on June 15, 1998 through our numerous meetings with staff. We will continue to address these issues as they are raised through the submittal comment process. The attached set of documents meets the requirements of the application process and includes the various documents required for submittal. Sincerely, bha ftsign inc. by Bruce A. Hen ee, ASLA President July 23, 1998 Ms. Leanne Harter, AICP City Planner City of Fort Collins Planning 281 N. College Ave. Fort Collins, CO 80521 design LANDSCAPE ARCHITECTURE URBAN DESIGN PLANNING BHA DESIGN, INC. RE: Poudre Valley Health Systems ODP and First Phase PDP I305 INNOVATION DRIVE Dear Leanne, We are pleased to submit the ODP and PDP for the first phase of development for the proposed Poudre Valley Health Systems Harmony Campus. As you know we have met a number of times to review this project and have also met a number of times with other departments to review infrastructure issues. The attached submittal represents a beginning of our response to issues you have raised as well as comments we have received from other departments. I would like to point out that because of recent changes suggested by the planning and engineering departments, we have not been able to complete the most recent plan revisions requested. We will continue revising these plans over the next few weeks while you review our first submittal but, would request that you and other departments use this initial plan set as a means of identifying major concerns. Outlined below is a brief response to our Conceptual Review letter for this project for the ODP. Response to Conceptual Review The following items are responses to the Conceptual Review summary letter dated March 2, 1998. Responses are numbered according to the numbers of the comments on the Conceptual Review letter. 1. Zoning - Acknowledged. All criteria are met 2. Water/Wastewater - Conditions acknowledged. An overall utility plan is included with this submittal. Roger Buffington has been contacted by Sear Brown Group 3. Stormwater - Comments acknowledged. Glen Schleuter has been FT. COLLINS, CO 80525 TEL 970 333.1571 FAX 970 223.1827