Loading...
HomeMy WebLinkAboutPVH HEALTH SYSTEMS, HARMONY CAMPUS, 3RD FILING, PRIMARY CARE PLAZA - PDP - 32-98E - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWPVHS Harmony Campus Primary Care Plaza February 2, 2004 Concept Review Comments We believe that we have satisfactorily responded to all comments. Please contact me if you have any additional comments or concerns at (970) 495-6353. Sincerely, P4*r" *-/ Robert J. Mooney Project Architect Xc: Angie Milewski, BHA Design Jim Allen -Morley, Sear -Brown Engineering Dean Barber, McWhinney Enterprises Matt Delich PVH Harmony Medical Offices crt Responses 2 2 031 Page 5 of 5 PVHS Harmony Campus Primary Care Plaza February 2, 2004 Concept Review Comments Current Planning (Cameron Gloss, 221-6750 cgloss@fcgov.com): 1. Comment: A neighborhood meeting is not required for a Type I PDP application; however, staff would help facilitate a neighborhood meeting if it is desired by the applicant. If the applicant wishes to go forward with a neighborhood meeting, please contact the Current Planning Department to assist in coordination. Response: Acknowledged. 2. Comment: All of the uses proposed by the applicant as of this time are permitted under a Type I Administrative Review. Response: Acknowledged. 3. Comment: The project will be subject to the design standards in Article 3 and the HC zone district standards of Article 4,of the Land Use Code, and the Harmony Corridor Design Standards. Response: Acknowledged. 4. Comment: In order to exceed the maximum off-street parking permitted, the applicant will not to apply for an "exception to the general office parking standard". Please refer to Section 3.2.2(K)(4), subsections (a) and (b) outlining the procedure and review criteria. Response: See exception to standard application included with this submittal. Natural Resources (Doug Moore, 221-6650, dmoore@fcqov.com): 1. Comment: Please contact City Forester, Tim Buchanan, at 221-6660 to determine whether existing trees can be removed from the site and if tree mitigation will be required. Response: There are no existing trees to be removed. 2. Comment: Staff will review the previously submitted Ecological Characterization Study and pass along any requirements. Response: Please forward these as soon as possible as issues will be a cost to development. 3. Comment: A Fugitive Dust Control Permit will need to be obtained from Larimer County. Response: Acknowledged. A Fugitive Dust Control Permit will be obtained prior to any sitework. 4. Comment: Please use native plants and grasses to the maximum extent possible. Response: Acknowledged. PVH Harmony Medical Offices crt Responses 2 2 031 Page 4 of 5 PVHS Harmony Campus Primary Care Plaza February 2, 2004 Concept Review Comments 5. Comment: Development fees and water rights will be due at building permit. Response: Comment noted. Engineering (Dave Stringer, 221-6605, dstringer@fcgov.com) 1. Comment: Street Oversizing Fees are available for Cambridge Drive is designated as a Collector street. The applicant should contact Matt Baker at (970) 224-6108 to determine the estimated fees. Response: Comment noted. 2. Comment: A State Highway Access permit may be required. Response: Comment noted. The access permit will be applied for with the Infrastructure Package. 3. Comment: Please contact Eric Bracke, City Traffic engineer, at 221-6630 to review the project scope and determine what level of Transportation Analysis, if any, will be needed. Response: Meeting has been held. 4. Comment: A 2"d point of vehicular access will need to be constructed in order to meet emergency access requirements. Response: Two additional points of emergency access are provided. One is east of the Corbett Intersection on Harmony Road. The other will be an all weather road that enters from Timberwood east and goes north to the Primary Care Project Storm Drainage (Wes Lamarque, 221-6700 wlamargue@fcaov.com): 1. Comment: This site is in the McClelland/Mail Creek drainage basin where the new development fee is $3,717.00/acre which is it is subject to the runoff coefficient reduction. This fee is to be paid at the time the building permit is issued. Response: Comment noted. 2. Comment: A drainage and erosion control report and construction plans are required and they must be prepared by a Professional Engineer registered in Colorado. Response: Comment noted. 3. Comment: Onsite detention is required with a 0.2 cfs release rate for the 10 year storm and a 0.5 cfs release rate for the 100 year storm. Extended detention is required for water quality treatment. Response: Comment noted. This will be provided by a phased detention pond in the south detention pond 4. Comment: This site is on the Stormwater Utility inventory map 12Q. Response: Comment noted. Transportation Planning (David Averill, 221-6608 daverill@fcgov.com): 1. Comment: The Transportation Impact Analysis needs to address all modes. Response: Matt Delich will review requirements with you. PVH Harmony Medical Offices crt Responses 2 2 031 Page 3 of 5 PVHS Harmony Campus Primary Care Plaza February 2, 2004 Concept Review Comments 2. Comment: Development Charges will be due as development proceeds within the development. Response: Comment noted. 3. Comment: Public street lighting will need to be provided along Snow Mesa Drive. Please coordinate this design with Light and Power. Response: Comment noted and acknowledged. Poudre Fire Authority (Ron Gonzales, 221-6570): 1. Comment: Fire hydrants must be located within 300 feet of all buildings capable of delivering water flows of 1,500 gal/min at 20 psi. Response: Final location of fire hydrants will be coordinated to provide this minimum. 2. Comment: Address numbers for the buildings must be visible from the street, with a minimum of 6-inch letters on a contrasting background. Response: Final location of lettering will be shown on PDP submittal. 3. Comment: PFA will need to evaluate whether the 2nd point of access is acceptable -such areas are shown on private property on the conceptual site plan (parking aisles/private loop drive). Response: We request that this determination be made quickly, as it affects the cost of the development of the project. Refer to response #4 under Engineering comments. 4. Comment: Buildings may need to be fire sprinklered, based on occupancy, square footage and design. Response: Comment acknowledged. Final determination on fire sprinklering will be verified with both the Fire Authority and the Building Department. Water/Wastewater (Roger Buffington, 221-6700 rbuffington@fcgov.com): 1. Comment: There are existing mains in the following locations: 1 2-inch water main in N private drive, 12-inch sewer in S future street R.O.W., 12-inch water and 8-inch sewer in Timberwood to the E and additional mains included in the PVH Infrastructure plans currently under review. Response: Comment is noted. Water and sanitary sewer service are anticipated to be taken north of the Primary Care Project from the water and sewer in the private road to the north of the building. 2. Comment: Limit the earthwork and berming along the S side of Harmony to minimize the fill placed over the 30-inch water transmission main. Response: The berming will be discussed with water/wastewater during the design process. 3. Comment: Use existing water/sewer stubs or abandon at the main. Response: Comment noted. 4. Comment: The water conservation standards for landscape and irrigation will apply. Response: Comment noted. PVH Harmony Medical Offices crt Responses 2 2 031 Page 2 of 5 Arch istruction 0. February 2, 2004 Cameron Gloss City of Fort Collins Planning Department Fort Collins, CO Fort Collins P.O. Box 2127 (80522) 2620 E. Prospect Road, Suite 100 Fort Collins, CO 80525 (970)493-8747 (970)493-5869 FAX Re: PVHS Harmony Campus Primary Care Plaza Concept Review Comments MEETING DATE: January 5, 2004 Denver Eighteenth Street Atrium 1621 18th Street, Suite 250 Denver, CO 80202 (303) 296-0383 (303) 296-0382 FAX Colorado Springs P.O. Box 1478 Colorado Springs, CO 80901-1478 (719)633-4713 (719)633-9508 FAX ITEM: Poudre Valley Health Systems Harmony Campus Medical Buildings APPLICANT: BHA Design c/o Angie Milewski 4803 Innovation Drive. Fort Collins, CO 80525 LAND USE DATA: A request to construct a 60,000 sq. ft expansion to the existing ambulatory care facility, and construct a free-standing 22,500 sq. ft. medical office building, at the existing PVH Harmony Campus. Zoning (Jenny Nuckols, 221-6760 Inuckols@fcgov.com): 1. Comment: The land uses within the project are permitted in the HC zoning district as a Type I (Administrative) Review. Response: Comment noted. 2. Comment: Medical offices are permitted a maximum of 4.5 parking spaces per 1,000 sq. ft. of floor area. The City's Land Use Code makes a provision for an "exception" to this limitation. Response: See exception to standards application included with this submittal. Light and Power (Bruce Vogel, 221-6700 bvogel@fcgov.com): 1. Comment: Relocation of existing transformer will be at the applicant's expense; the transformer must be located within 10 feet of a paved surface. Response: Comment noted. Final location of transformer shall be shown on PDP s1Jhrnitta1, PVH Harmony Medical Offices on Responses 2 2 031 Page 1 of 5