HomeMy WebLinkAboutPVH HEALTH SYSTEM, HARMONY CAMPUS, 2ND FILING, INFRASTRUCTURE - FDP - 32-98D - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTmin
MAINTENANCE
We recommend a preventive maintenance program be developed and
followed for all pavement systems to assure the design life can be realized.
Choosing to defer maintenance usually results in accelerated deterioration
leading to higher future maintenance costs, and/or repair. A recommended
maintenance program is outlined in Appendix C.
LIMITATIONS
Our borings were drilled to provide a reasonable estimation of subsurface
conditions. Variations in the subsoil condition not indicated by our borings are
likely. Pavement sections are preliminary and should be revised after the City of
Fort Collins provides design traffic values. A representative of our firm should
observe subgrade preparation, fill placement and pavement construction.
We believe the geotechnical services for this project were performed in a
manner consistent with that level of care and skill ordinarily exercised by
members of the profession currently practicing under similar conditions in the
locality of the project. No warranty, express or implied, is made. If we can be of
further service in discussing the contents of this report, or in the analyses of the
proposed pavement systems from a geotechnical point of view, please call.
�p0 REG�S�
°•
CTL I THOMPSON INC.
O ••' D• Ts F
o o•m
�
• � 36292 �:o
J/ •
Adam D. Tschida, PE
0
�.� �/`T��7"•�•��
Project Engineer
S•''••••''•G�
S/
� 0
AL
Thomas A. Chapel, CPG,
PE
Associate & Division Manager
ADT:TAC/bly
(6 copies sent)
POUDRE VALLEY HEALTH SYSTEM 11
INTERIOR ROADS
PVH HARMONY CAMPUS
CTL I T JOB NO. FC-3176
2. Cohesive soils (A-6 to A-7-6) should be moisture conditioned
between optimum to 2% above optimum moisture content and
compacted to at least 95% of maximum standard Proctor dry density
(ASTM D 698, AASHTO T 99).
3. Granular soils (A-1 to A-5) should be moisture conditioned between
2% below to 2% above optimum moisture content and compacted to
at least 95% of maximum standard Proctor dry density (ASTM D 698,
AASHTO T 99).
4. Final grading of the subgrade should be carefully controlled so the
design cross -slope is maintained and low spots in the subgrade that
could trap water are eliminated.
5. Once final subgrade elevation has been reached and the subgrade
compacted and inspected, the area should be proof -rolled with a
pneumatic tired vehicle loaded to at least 18 kips per axle. The
proof -roll should be performed while moisture contents of the
subgrade are still within the recommended limits. Drying of the
subgrade prior to proof -roll or paving should be avoided. Areas of
soft or wet subgrade should be remedied.
CONSTRUCTION DETAILS
The design of a pavement system is as much a function of the quality of
the paving materials and construction as the support characteristics of the
subgrade. The construction materials are assumed to possess sufficient quality
as reflected by the strength coefficients used in the flexible pavement design
calculations. These strength coefficients were developed through research and
experience to simulate expected material of good quality, as explained herein.
During construction careful attention should be paid to the following details:
► Placement and compaction of trench backfill.
► Compaction at curb lines and around manholes and water valves.
► Excavation of completed pavements for utility construction and
repair.
► Moisture treating or stabilization of the subgrade to reduce swell
potential.
► Design slopes of the adjacent ground and pavement to rapidly
remove water from the pavement surface.
10
POUDRE VALLEY HEALTH SYSTEM
INTERIOR ROADS
PVH HARMONY CAMPUS
CTL I T JOB NO. FC-3176
�r
2. High calcium quicklime should conform to the requirements of
ASTM C 977 and ASTM C 110. Dolomitic quicklime, magnesia
quicklime with magnesium oxide contents in excess of 4 percent or
carbonated quicklime should not be used.
3. Fly ash should consist of Class C or Class F. Class F fly ash should
only be allowed in conjunction with lime or other stabilizing agents.
4. All stabilizing agents should come from the same source as used in
the mix design. If the source is changed, a new mix design should
be performed.
5. The subgrade should be mixed to the specified depth and at the
specified concentration until a uniform blend of soil, stabilizing
agent and water is obtained and the moisture content is at least 3
percent above the optimum moisture content of the design mixture.
6. If lime is used, a mellowing period of up to 7 days may be required
following initial mixing. Once the pH of the mixture is 12.3 or higher
and the plasticity index is less than 10, the soils shall again be
mixed and moisture conditioned to at least 3 percent over optimum
moisture content and compacted to at least 95 percent of maximum
standard Proctor dry density (ASTM D 698). Up to 7 additional days
may be required for curing prior to paving. The treated surface shall
be kept moist or sealed with emulsified asphalt. Traffic should not
be allowed on the surface during the mellowing and curing periods.
7. If fly ash is used, the mixture should be moisture conditioned to at
least 3 percent over optimum moisture content and compacted to at
least 95 percent of maximum standard Proctor dry density (ASTM D
698) within 90 minutes from the time of initial fly ash mixing.
8. If a lime/fly ash combination is used, the lime should be mixed first
and allowed to mellow as indicated above. Following the mellowing
period, the fly ash should be added, moisture conditioned and
compacted as indicated above within 90 minutes of initial fly ash
mixing.
9. Mixing of the lime or lime/fly ash treated subgrade should not occur
if the temperature of the soil mixture is below 40°F.
10. Placement, mixing and compaction of stabilized subgrade should be
observed and tested by a representative of our firm.
Prepared Subgrade
1. Subgrade should be stripped of organic matter, scarified, moisture
treated and compacted.
POUDRE VALLEY HEALTH SYSTEM 9
INTERIOR ROADS
PVH HARMONY CAMPUS
CTL I T JOB NO. FC-3176
IF
containing polymer modified asphalt. The breakdown compaction
should be completed before the mixture temperature drops 20°F.
9. The maximum compacted lift should be 3.0 inches and joints should
be staggered. No joints should be placed within wheel paths.
10. Asphalt concrete should be compacted to between 92 and 96
percent of Maximum Theoretical Density. The surface shall be
sealed with a finish roller prior to the mix cooling to 185°F. '
11. Placement and compaction of hot mix asphalt should be observed
and tested by a representative of our firm. Placement should not
commence until the subgrade is properly prepared (or stabilized),
observed, and proof -rolled.
Aggregate Base Course (ABC)
1. A Class 5 or 6 Colorado Department of Transportation (CDOT)
specified aggregate base course should be used. A recycled
concrete alternative, which meets the Class 5 or 6 designations, is
also acceptable.
2. Aggregate base course should have a minimum Hveem stabilometer
value of 77. Aggregate base course or recycled concrete material
must be moisture stable. The change in R-value from 300 psi to 100
psi exudation pressure should be 12 points or less.
3. If used, geotextile fabric (Mirafi 500x or equivalent) should be placed
over the approved subgrade within 24 hours prior to placement of
aggregate base course or recycled concrete. Fabric should be
rolled out longitudinally with minimum overlapped seams of 2.5 feet.
No wrinkles should be permitted.
4. Aggregate base course or recycled base course should be placed in
thin lifts not to exceed 8 inches, moisture treated to within 2% of
optimum moisture content, and compacted to at least 95% of
standard Proctor maximum dry density (ASTM D 698, AASHTO T 99).
5. Placement and compaction of aggregate base course or recycled
concrete should be observed and tested by a representative of our
firm. Placement should not commence until the underlying
subgrade is properly prepared and observed.
Stabilized Subgrade (SS)
1. The contractor should have a mix design performed using the actual
site soils and the approved stabilizing agent (lime, fly ash or a
combination of lime and fly ash). Scheduling should allow at least 2
weeks for the mix design to be completed prior to construction.
8
POUDRE VALLEY HEALTH SYSTEM
INTERIOR ROADS
PVH HARMONY CAMPUS -
CTL I T JOB NO. FC-3176
IF
for construction should be submitted and the applicable laboratory tests
performed to verify compliance with the specifications.
Asphaltic Concrete (AC)
1. Hot mix asphalt should be composed of a mixture of aggregate,
filler, hydrated lime and asphalt cement. Some mixes may require
polymer modified asphalt cement, or make use of reclaimed asphalt
pavement (RAP). A iob mix design is recommended and periodic
checks on the iob site should be made to verify compliance with
specifications.
2. Hot mix asphalt should be relatively impermeable to moisture and
should be designed with crushed aggregates that have a minimum
of 80% of the aggregate retained on the No. 4 sieve with two
mechanically fractured faces.
3. Gradations that approach the maximum density line (within 5%
between the No. 4 and 50 sieve) should be avoided. A gradation
with a nominal maximum size of 3/4 or 1/2 inches developed on the
fine side of the maximum density line should be used.
4. Total void content, voids in the mineral aggregate (VMA) and voids
filled should be considered in the selection of the optimum asphalt
cement content. The optimum asphalt content should be selected at
a total air void content of approximately 4%. The mixture should
have a minimum VMA of 14% and between 65% and 80% of voids
filled.
5. Asphalt cement should meet the requirements of the Superpave
Performance Graded Binders (PG). The minimum performing
asphalt cement should be PG 64-22 for use along the Front Range.
The use of PG 58-28 or PG 58-22 asphalt cement has been known to
cause tenderness in pavements in the Front Range area and should
be avoided.
6. If used, hydrated lime should be added at the rate of 1% by dry
weight of the aggregate and should be included in the amount
passing the No. 200 sieve. Hydrated lime for aggregate pretreatment
should conform to the requirements of ASTM C 207, Type N.
7. We recommend paving only be performed when subgrade
temperatures are above 40OF and air temperature is at least 40OF and
rising.
8. Hot mix asphalt should not be placed at a temperature lower than
245OF for mixes containing PG 64-22 asphalt, and 290°F for mixes
POUDRE VALLEY HEALTH SYSTEM 7
INTERIOR ROADS
PVH HARMONY CAMPUS -
CTL I T JOB NO. FC-3176
IF
least 95 percent of maximum standard Proctor dry density (ASTM D 698). Sand fill
should be moistened to within 2 percent of optimum moisture content. Clay fill
should be moisture condition to between 1 and 3 nercent above optimum
moisture content. A representative of our firm should observe placement and test
compaction of fill.
PRELIMINARY PAVEMENT DESIGN
At this time, the City of Fort Collins Engineering Department has not
recommended design traffic values for these roads. For preliminary design, we
assumed Snow Mesa Drive would be classified as a Commercial Collector with an
Equivalent Single Axle Load (ESAL) of 730,000 and the other streets as Major
Collectors with ESAL's of 365,000. A design R-value of 15 was used for the
existing subgrade soil, based on the results of the previous investigation.
PRELIMINARY PAVEMENT THICKNESS ALTERNATIVES
* Subgrade with high swell potential should be treated to a minimum depth of 3 feet.
PAVEMENT MATERIALS
Material properties and construction criteria for the pavement alternatives
are provided below. These criteria were developed from analysis of the field and
laboratory data, our experience and City of Fort Collins requirements. If the
materials cannot meet these recommendations, then the pavement design should
be reevaluated based upon available materials. All materials and construction
requirements of the City of Fort Collins should be followed. All materials planned
POUDRE VALLEY HEALTH SYSTEM 6
INTERIOR ROADS
PVH HARMONY CAMPUS ,
CTL I T JOB NO. FC-3176
IF
section, which may consist of; full depth asphalt concrete, a composite section of
asphalt concrete and aggregate base course, or asphalt concrete over chemically
stabilized subgrade. The thickness of aggregate base course or chemically
stabilized subgrade should be counted as part of the moisture treated depth.
Moisture treatment of the subgrade is also recommended beneath curb and gutter
and attached sidewalks. Moisture treated subgrade should be placed and
compacted to the specifications in FILL PLACEMENT, below.
EXCAVATION
Excavation may be required. We believe the site soils can be excavated
with conventional heavy-duty equipment. Based on Occupational Safety and
Health Administration (OSHA) Standards covering temporary excavations, we
believe the clay soils likely classify as Type B and sand soils as Type C. Type B
soils require a maximum slope inclination of 1:1 (horizontal:vertical) and Type C
soils require a maximum slope inclination of 1.5:1. Stockpile and vehicles should
be set back a minimum distance equal to one-half the height of the slope from the
crest of the excavation. The contractor's "competent person" should identify the
soils encountered and refer to OSHA standards to determine appropriate methods
to protect individuals working in excavations. Excavations deeper than 20 feet
should be shored or designed by a professional engineer.
FILL PLACEMENT
Areas to receive fill should be prepared by scarifying the surface to a depth
of 8 inches, moisture conditioning to within 2 percent of optimum moisture
content for sand subgrade (1 to 3 percent above optimum moisture content for
clay subgrade) and compacting to at least 95 percent of maximum standard
Proctor dry density (ASTM D 698).
On -site soils substantially free of debris, organics or other deleterious
materials are suitable for re -use as fill. Imported fill should consist of soils with
properties similar or better than the on -site soils. A sample of import material
should be submitted to our office for approval prior to importing to the site. Fill
should be moisture conditioned, placed in thin, loose lifts, and compacted to at
POUDRE VALLEY HEALTH SYSTEM 5
INTERIOR ROADS
PVH HARMONY CAMPUS
CTL I T JOB NO. FC-3176
Ground Water
Ground water was not encountered during drilling of the test holes. When
we returned several days after drilling, ground water was measured in one boring
(S-6) at a depth of about 13 feet. The other seven borings had caved at depths of
about 10 to 13 feet and the caving may have been due to ground water infiltration
in the borings. Ground water levels will vary seasonally and with changes in
precipitation and irrigation amounts in the surrounding area.
EXPANSIVE SOIL MITIGATION
Expansive soils are present in the subgrade at this site. We measured
swells of 0.5 to 11.6 percent after wetting under 150 psf loads during laboratory
testing. The presence of expansive soils implies that pavements may heave and
be damaged. The risks associated with swelling soils cannot be eliminated, but
may be mitigated by careful design, construction and maintenance procedures.
Two methods of mitigation can be considered; they are 1) removal and
replacement and 2) moisture treatment. Treatment of the subgrade should extend
beneath curb, gutter and attached sidewalks.
Removal and Replacement
The expansive subgrade soils can be removed to a depth of 36 inches
below proposed subgrade elevation and replaced with a low permeability silty to
clayey sand, which exhibits swell of less than 2 percent (under a 150 psf confining
pressure) when compacted within 1 percent of optimum moisture content to 94 to
97 percent of maximum standard Proctor dry density (ASTM D 698). Permeability
should be low in order to reduce the probability of creating a `bathtub' and driving
the swell deeper by providing a constant source of moisture. We recommend a
minimum R-value of 19 for the imported sand, which should be confirmed prior to
placement.
Moisture Treatment
Based on our experience and local practice, we recommend at least 36
inches of moisture treated, on -site soils be placed below the designed pavement
4
POUDRE VALLEY HEALTH SYSTEM
INTERIOR ROADS
PVH HARMONY CAMPUS '
CTL I T JOB NO. FC-3176
IF
particle size analysis tests were performed on four samples and indicated liquid
limits of 39 to 48 percent, plasticity indices of 12 to 18 percent and 55 to 73
percent silt and clay fines (passing the No. 200 sieve). The samples classified as
A-6 and A-7-6 soils, according to the AASHTO classification system.
Swell -consolidation testing of fourteen samples indicated swell of 0.5 to
11.6 percent swell. Twelve of the fourteen samples tested showed swell greater
than 2 percent. Swell potential in this range requires mitigation according to City
of Fort Collins specifications. Our recommendations for mitigation of the swelling
soils are presented below in the EXPANSIVE SOIL MITIGATION section of this
report.
A Hveem Stabilometer test (R-Value, ASTM 2844, AASHTO T190) was
performed on a combined sample from the previous investigation. The results
indicated an R-Value of 15.
Four samples were tested for water-soluble sulfate content and indicated
0.002 to 0.012 percent water-soluble sulfates. These low values indicate the risk
of heave due to chemical reaction between sulfate and a stabilizing agent is low.
Sulfate concentrations above 0.5 percent can cause an adverse reaction between
the sulfates and the stabilizing agent, resulting in heaving of the subgrade if lime
or fly ash stabilization is performed. This result also indicates class 0 exposure to
concrete in contact with site soils, according to the criteria of the American
Concrete Institute (ACI).
For this level of sulfate concentration, ACI indicates any type of cement
can be used for concrete that comes into contact with the subsoils. In our
experience, superficial damage may occur to the exposed surfaces of highly
permeable concrete, even though sulfate levels are relatively low. To control this
risk and to resist freeze -thaw deterioration, the water-to-cementitious material
ratio should not exceed 0.50 for concrete in contact with soils that are likely to
stay moist due to surface drainage or high water tables. Concrete should be air
entrained.
3
POUDRE VALLEY HEALTH SYSTEM
INTERIOR ROADS
PVH HARMONY CAMPUS
CTL I T JOB NO. FC-3176
PREVIOUS INVESTIGATION
CTL I Thompson, Inc conducted an investigation for the Poudre Valley
Health System, Harmony Campus Medical Center (Job No. FC-1116) that included
field and laboratory testing along the alignment of the roads. Data and findings
from the previous investigation were considered during preparation of this report.
Summary logs of borings for the previous investigation are provided in Appendix
B.
FIELD AND LABORATORY INVESTIGATION
Our field investigation consisted of drilling eight borings to a depth of 15
feet along the alignment of the roads. The boring locations were staked by
Stantec. The approximate locations of our borings are shown on Figure 1. Our
representative observed drilling operations, logged the soils encountered and
obtained samples. Bulk samples were obtained from auger cuttings in the upper
five feet of each boring. Relatively undisturbed samples were obtained at depths
of 2, 4, 9, and 14 feet by driving a modified California sampler with a 140-pound
hammer failing 30 inches. Summary logs of the borings are presented on Figure
2.
Laboratory testing was performed in general accordance with AASHTO and
ASTM methods to determine index properties of the soils sampled and subgrade
support values for those soil types influencing the pavement design. To evaluate
potential heave, swell -consolidation testing was performed on 14 samples of the
clay under a pressure of 150 psf. Results of laboratory tests are presented in
Appendix A and are summarized on Table A -I.
SUBSURFACE CONDITIONS
The soils encountered in our borings were predominately medium stiff to
very stiff sandy clay. Clayey sand was encountered in three borings, at depths of
6 to 14 feet below the ground surface. We tested samples of the soils in the
laboratory for density, moisture, swell/consolidation properties, water-soluble
sulfate concentration, and subgrade support characteristics. Atterberg limits and
2
POUDRE VALLEY HEALTH SYSTEM
INTERIOR ROADS
PVH HARMONY CAMPUS
CTL I T JOB NO. FC•3176
Rim
SCOPE
This report presents the results of our geotechnical investigation for the
proposed interior roads within the Poudre Valley Health System, Harmony
Campus, located southeast of the intersection of Timberline and Harmony Roads
in Fort Collins, Colorado (Figure 1). The purpose of this investigation was to
obtain information regarding subsurface conditions within the alignment of the
proposed streets. The report presents geotechnical design and construction
criteria for the roadways in general conformance with the Larimer County Urban
Area Street Standards as adopted by the City of Fort Collins.
Our report includes descriptions of the subsoils found in our exploratory
borings, laboratory test results, preliminary pavement sections, and construction
and materials guidelines. The recommendations contained herein are based upon
laboratory test results, Larimer County Urban Area Street Standards, the AASHTO
design method, and our experience.
SITE CONDTIONS
The site is located south and east of the Poudre Valley Health Center,
located southeast of the intersection of Timberline and Harmony Roads in Fort
Collins, Colorado (Figure 1). Currently, the site is a vacant field covered in
grasses and vegetation. Underground sanitary sewer is installed along the
alignment of the proposed unnamed road that loops around the south side of the
hospital, and underground water and sewer are present along the alignment of
Snow Mesa Road.
PROJECT DESCRIPTION
The project site consists of approximately 5200 feet of roadway to the
south and east of the existing Poudre Valley Health System Facility (Figure 1).
The streets consist of two unnamed roads, extension of Snow Mesa Drive from
the south edge of the site to Harmony Road and extension of Timberwood Drive
from the east edge of the property to proposed Snow Mesa Drive. Curb and gutter
and a detached sidewalk are planned.
1
POUDRE VALLEY HEALTH SYSTEM
INTERIOR ROADS
PVH HARMONY CAMPUS
CTL I T JOB NO. FC-3176
TABLE OF CONTENTS
SCOPE 1
SITE 1
PROJECT DESCRIPTION 1
FIELD AND LABORATORY INVESTIGATION 1
PREVIOUS INVESTIGATION 2
FIELD AND LABORATORY INVESTIGATION 2
SUBSURFACE CONDITIONS 2
Groundwater 4
EXPANSIVE SOIL MITIGATION
4
Removal and Replacement
4
Moisture Treatment
4
EXCAVATION
5
FILL PLACEMENT
5
PRELIMINARY PAVEMENT DESIGN
6
PAVEMENT MATERIALS
6
Asphaltic Concrete
7
Aggregate Base Course
8
Stabilized Subgrade
6
Prepared Subgrade
9
CONSTRUCTION DETAILS
10
MAINTENANCE
11
LIMITATIONS
11
FIGURE 1 - LOCATIONS OF EXPLORATORY BORINGS
FIGURE 2 - SUMMARY LOGS OF EXPLORATORY BORINGS
APPENDIX A - LABORATORY TEST RESULTS
APPENDIX B — SUMMARY LOGS OF EXPLORATORY BORINGS - JOB NO. FC-1116
APPENDIX C - MATERIAL PROPERTIES AND CONSTRUCTION CHECKLIST
POUDRE VALLEY HEALTH SYSTEM
INTERIOR ROADS
PVH HARMONY CAMPUS '
CTL I T JOB NO. FC-3176
IEEI I N C O R P O R A T E U
SUBGRADE INVESTIGATION AND
PRELIMINARY PAVEMENT DESIGN
INTERIOR ROADS
POUDRE VALLEY HEALTH SYSTEM
HARMONY CAMPUS
FORT COLLINS, COLORADO
Prepared For:
POUDRE VALLEY HEALTH SYSTEM
SYSTEM DEVELOPMENT
2809 East Harmony Road
Suite 200
Fort Collins, Colorado 80528
Attention: Ms. Arleen Richardson
Job No. FC-3176
June 5, 2004
375 E. Horsetooth Road I The Shores Office Park I Building 3, Suite 100 1 Ft. Collins, Colorado 80525
Telephone:970-206-9455 Fax:970-206-9441