Loading...
HomeMy WebLinkAboutSAGE CREEK - PDP - 25-98B - CORRESPONDENCE - REVISIONS (5)• • 1 I j L r � � �� �� V � ��t- �I��i�i�J �r���� lr���J _;�ii� �;...r� ,e,�■�i �,Qj:, 1 ,� Il�lii�111 :11r�lifi� II 1���� r1 J, rRIM10 —A wwal hqu will fW��,, • I NORTH • I I �rIse Fire Access Exhibit A CW2d\@1p(p urban. design, inc. 3555 stonford road, suite 105 fort collins, colorado 80525 (970) 226-4074 1) m) n) 4) a) b) c) 5) a) b) 6) a) b) c) LUVP@P(A� urban design, inc. Resources. Evergreen shrubs have been included on the typical foundation planting plan. A fencing plan has been provided with the overall site plan on Sheet 2. Enhanced crosswalks have been shown at appropriate locations. Architectural Elevations Preliminary elevations for the Neighborhood Center Structures have been added. Walkways have been provided meeting LUC requirements. As noted on Sheet 9, color shades will be compatible within the proposed Sage Creek Neighborhood, and color pallets will be provided with Final Plans. LUC Section 3.5.1(G) does not require that all building colors be noted on the PDP building elevations. LMN District: Examples of Single Family architectural elevations have been added to the plans. The 'optional playground" will be provided if a daycare center is a tenant of the Neighborhood Center Building, but is not required for office tenants. LUC Street Pattern Connectivity: Old Mill Road has been realigned. The street pattern proposed meets the specific direction we have most recently been given by City Staff. The attached letter provides justification as requested. The LUC provision regarding private drives is interpreted to mean that private drives may serve Attached and Multi -Family dwellings. Tract areas and uses are noted as requested. The additional lighting detail requested is being provided by Marshall Design, and is being submitted under separate cover. Light levels proposed meet code requirements. Walks and trails shown meet known code requirements, and have been coordinated with Transportation Planning. Please forward LETA comments when available. It is our understanding that this item will not delay the review process for this development. No redlined plans were received from Planning, Zoning, or Transportation Planning. Sear -Brown received redline plans from Engineering and Storm Drainage. We appreciate your assistance in the planning of this project. Please call if you need further information. Also please confirm the administrative hearing date for this PDP. We would anticipate an early January hearing. Sincerely �r�� Eldon Ward, Presi dent _�� Cityscape Urban Design, Inc. cc: Jim Postle, the James Company Les Crawford, The Sear -Brown Group FA LAn@@P@ urban design, inc. street. Old Mill, Rabbit Creek Road, and Cornerstone have been widened to 36' at the C.R. #36 intersections. It is our understanding that the interpretation has been made that private drives may serve attached and multi -family dwellings. M. Additional walkway connections to C.R. #36 have been shown as requested by Transportation Planning; Old Mill has been realigned; and an access easement is included at the northwest comer of the development. N. Zoning comments are addressed as follows: 1) HC ramps are noted in the townhome area. 2) Typical HC parking stall dimensions are noted. 3) A handicapped parking space has been noted at the park. 4) Bicycle parking is included at the park. 5) HOA maintenance begins upon 75% of owner occupancy. The developer is responsible for maintenance until that time. 6) Details of the picnic pavilion are included on Sheet 9. 7) A fence location plan has been added. 8) The cul-de-sac island has been eliminated. 9) All the townhome buildings are identical. Lot areas are shown with a typical detail on the plat. 10) Townhome garages are to be "limited common elements" consistent with the existing plats at Stanton Creek and WildWood. 11) The setback diagram has been removed as requested. O. Current Planning comments have been addressed as follows: 1) Scales have been noted as needed on various drawings. 2) Road rights -of -way are noted; single family setbacks are dictated by code and have been removed as requested by Zoning; Townhome building envelopes are dimensioned and the more complete horizontal control included on the plat is noted; and typical sidewalk widths are noted. 3) Other Site/Landscape revisions: a) As indicated on the PDP, street trees meeting the provisions of LUC 3.2.1 will be provided. A detail showing criteria for minor adjustments for driveway and street light locations has been added to the plans. b) Minimum species diversity has been provided. c) Street tree quantities in the townhome area have been checked. d) Parking areas are screened from surrounding streets by a combination of berming and plant materials. e) Parking lot landscape percentages are noted on Sheet 7. f) Comer sight distance triangles have been indicted at the traffic circle on Sear - Brown's street plans. As per our meeting with Engineering, sight distance at the other typical 900 intersections is not anticipated to present problems. g) Bike racks and benches at the small neighborhood park / neighborhood center are indicated on Sheet 8. Other benches are shown on the site plan sheets. h) The required additional walkways have been added. i) Walkways have been provided on both sides of drive isles, connecting to adjacent streets. j) The plant list and landscape plan have been reconciled. k) Natural resource comments do not address elimination of ditch banks and channels. We have indicated the existing top of bank and related 50' buffer/grading area as previously requested by Storm Drainage and Natural November 30, 1999 Ronald G. Fuchs, Project Planner City of Fort Collins Planning Department P.O. Box 580. Fort Collins, CO 80522 Dear Ron; urban design, inc. 3555 stanford road, suite 105 fort collins, colorado 80525 (970) 226-4074 FAX (970) 226-4196 E-mail: cityscap@frii.com Attached are 16 copies of the Sage Creek PDP, revised in response to the September 29, 1999 Staff Comments, other belated comments, and our subsequent discussions. It would be helpful if the applicant could receive a legible contact name and telephone number for the representatives of review agencies who provide the Revision Comment Sheets" attached to your comment letters. Specific comments from your September 291h letter are addressed as follows: A. Public Service easements have been added to the plat as requested. B. Mapping/Drafting comments affecting the plat are being addressed by Sear -Brown. C. A "Broadband Utility Easement (Service Agreement)" will be secured as required by TCI prior to the provision of cable service. D. Park Planning and Development had no comments. E. Sear -Brown is addressing Traffic Operations' comments regarding the utility plans; and the comment that, "... the T-circle is not accepted until review and acceptance of the circle design plans." F. Streets had no comments. G. Light and Power had no comments. H. A scale has been added to the trash enclosure details as requested by Natural Resources. The gates on the trash enclosures are not difficult to operate, and are needed for screening and control of debris. Details of the drainage outlet structures — meeting City standards - are included with Sear -Brown's utility plans. I. No comments were received from Street Oversizing. J. The townhome buildings have been adjusted so that they meet PFA's current method of determining compliance with the "150' rule"; therefore fire sprinklers are not required. Although not required by code we have adjusted the ends of the townhome parking courts to have a 50' outside radius. As per our discussions with Ron Gonzales, the townhome buildings will be addressed as per the criteria for multi -family buildings. Hydrants are being adjusted by Sear -Brown. Proposed streets that align with existing streets (Corbett Drive, Old Mill Road, and Cornerstone Drive) keep the same name. K. Sear -Brown is addressing Stormwater comments. L. PDP plans have been revised to respond to Engineering Comments. Many of these comments require street widths beyond those required by adopted City Standards, yet there appears to have been no technical review to justify requiring the increased improvements. Although our trafficconsultant has indicated that there is no technical justification requiring any of the streets at Sage Creek to be built to a connector or collector standard; we have agreed to continue to indicate Corbett Drive as a collector; have redesigned Sage Creek Drive east of Corbett as a 42' connector, and have designed Old Mill Road as a 34' local