HomeMy WebLinkAboutSAGE CREEK - PDP - 25-98B - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTow W, =11 IMM• Mv i� >� Ilia ■ul�
A
a
—f
.....
I
r—z--1.
I I
-ROAD-
6"MW -ROAD-
'� % �•
4
PROJECT
T
.�
'� { 0
A SITE
., of
r-----t
„z
"
Z
J �
E• s / H
COUNTY ROAD 36
' 1
I
EXISTIN
CITY Uh
ITS
1
I
I
C TY ROAD 34
Y
VICINITY MAP
Sage Creek
Subdivislon
Ft. Collins, CO
Location shown is
approximate.
no scale
Prepared by the
SEAR -BROWN
Group
•r
209 & Meldn,m
Ft Collis. CO 80521
ph: (970)482-5922
f c (970) 482-MOO
April 1999
Al
APPENDIX A
VICINITY MAP
VIII. REFERENCES
1. Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins,
Colorado, May 1984, interim revision January 1997.
2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins,
Colorado, January 1991.
3. McClellands Basin Master Drainage Plan, by Greenhorne and O'Mara, Inc., June 1986.
4. McClellands Basin 100-Year Master Plan Update (County Road 9 to Fairway Estates) for
Proposed Modifications to the Oakridge Village Regional Detention Pond, April 1996.
the onsite storm drain system will provide for the 2-year and the 100-year developed
' flows to reach the future detention ponds at the northern perimeter of this site. The
detention ponds will outlet into the McClellands Basin Drainageway and the flows
shall be carried east and south downstream to the Fossil Creek Reservoir Inlet Ditch
as historically occurs.
If, at the time of construction for some unforeseen reason, groundwater is
encountered, a Colorado Department of Health Construction Dewatering Permit is
required.
C. Stormwater Quality Concept
The proposed design has addressed the water quality aspect of stormwater runoff
through the use of various Best Management Practices (BMPs) for the treatment of
storm water. Volumes in Ponds A and B have been extended to accommodate Water
Quality Capture Volume (WQCV, see calculation in the Appendix).
D. Erosion Control Concept
The proposed erosion control concepts adequately provide for the control of wind
and rainfall erosion from the Sage Creek development. Through the construction of
the proposed erosion control concepts, the City of Fort Collins performance standard
shall be met. The proposed erosion control concepts presented in this report and
shown on the erosion control plan are in compliance with the City of Fort Collins
Erosion Control Criteria.
VII.
After overlot grading and utility installations have been completed, the
parking/driveway surfaces shall receive curb, gutter, and pavement surfaces. The
pavement structure shall be applied as soon as possible after the utilities are installed.
After installation of the storm drains, riprap protection shall be installed at the
outlets.
If the disturbed areas will not be built on within one growing season, a permanent
seed shall be applied. After seeding, a hay or straw mulch shall be applied over the
seed at a minimum rate of 2 tons/acre, and the mulch shall be adequately anchored,
tacked or crimped into the soil. In the event a portion of the roadway pavement
surface and utilities will not be constructed for an extended period of time after
overlot grading, a temporary vegetation seed and mulch shall also be applied to the
roadway areas as discussed above.
The grass lined detention ponds will be completed after other site infrastructure has
been constructed. When the detention ponds are finished, they will include multi -
staged outlet works and will be equipped with water quality riser pipes. The water
quality riser pipes will allow the first flush of stormwater runoff to filter out of each
detention pond over a forty (40) hour time period, thus allowing sediments and
pollutants to settle out and not be transported directly into the McClellands Basin
Drainageway,
All construction activities must also comply with the State of Colorado permitting
process for Stonnwater Discharges Associated with Construction Activity. A
Colorado Department of Health NPDES permit must be obtained by the owner before
construction grading can begin within this development.
CONCLUSIONS
A. Compliance with Standards
All computations that have been completed within this report are in compliance with
the City of Fort Collins Erosion Control Reference Manual for Construction Sites
and the Storm Drainage Design Criteria Manual. In addition, all computations are
in compliance with the McClellands Basin Master Plan.
B. Drainage Concept
The proposed drainage concepts presented in this report and on the construction plans
adequately provide for the transmission of developed on -site runoff to the existing
and proposed drainage facilities at the northern and eastern property lines of the
subject site. The combination of onsite street capacities in the curb and gutter and
V. STORMWATER QUALITY
A. General Concept
The water quality of stormwater runoff must be addressed on all final design utility
plans. The Sage Creek development is anticipating construction beginning in Spring
2000. Ponds A and B have been upsized to accommodate the Water Quality Capture
Volume as required by the City of Ft. Collins (see calculations in the Appendix).
The project will address all stormwater runoff quality concerns through the use of
various Best Management Practices for the treatment of stormwater runoff. Best
Management Practices (BMPs) for the treatment of storm water runoff include
installation of silt fence, rough irregular surfaced soils during grading operations,
WQCV, and straw or hay dry mulch of disturbed soils.
VI. EROSION CONTROL
A. General Concept
This development lies within the Moderate Rainfall Erodibility Zone and the
Moderate Wind Erodibility Zone per the City of Fort Collins zone maps. The
potential exists for moderate erosion problems after completion of the Sage Creek
improvements, due to some existing and proposed site slopes of greater than 2
percent. It is also anticipated that the project site improvements will be subject to
both wind and rainfall erosion before new vegetation can take hold or before the new
residential lots are developed.
The Erosion Control Performance Standard (PS) during and after construction for
this project was computed to be 80.7 and 95.0, respectively, per the criteria in the
City of Fort Collins Erosion Control Reference Manual for Construction Sites. The
' Effectiveness (EFF) of the proposed erosion control plan was calculated to be 81.8
during construction and 96.3 after construction. Therefore, the erosion control plan
below meets the City of Fort Collins' requirements. A copy of the calculation has
' been included in the Appendix. An erosion control escrow cost estimate of $66,300
is also included in the Erosion Control section of the Appendix.
B. Specific Details
Before grading or trenching begins within the project site, a sediment fence shall be
installed at the northern and eastern perimeters (downstream perimeters) of the
construction site. After overlot grading is completed, all disturbed areas not in a
roadway area shall have temporary vegetation seed applied. After seeding, a hay or
I' straw mulch shall be applied over the seed at a rate of 2 tons/acre minimum, and the
mulch shall be adequately anchored, tacked, or crimped into the soil.
1
basin 110 is composed of rational basins Al-A16, A18-A27, PA. The total area of
SWMM basin 110 is 19.00 acres and drains into detention pond #1 (Pond A).
SWMM sub -basin 130 is composed of rational basins B1-B3, B5, B6, B14-B17, PB.
The total area of SWMM basin 130 is 19.74 acres and drains into detention pond #2.
SWMM sub -basin 140 is composed of rational basin B7. The total area of SWMM
basin 140 is 0.22 acres and it drains into detention pond #2. Detention pond #1 will
release to McClellands Basin Drainageway via a staged outlet control structure and
approximately 170 L.F. of 30" RCP. The outlet works will be designed and
constructed to limit the discharge into the McClellands Basin Drainageway to 0.2
cfs/acre for the 10-year storm and 0.5 cfs/acre for the 100-year storm (in accordance
with the Master Plan for McClellands Basin). Based on these criteria, the total
allowable release rate for the site is 23.80 cfs for the 100-year storm and 9.54 cfs for
the 10-year storm.
The basin widths for the site were determined by taking the average length of travel
from the limit of the SWMM basin to the flow concentration point and dividing that
into the area of the basin. The percent impervious values and slopes were determined
from the site plan.
A HEC-2 analysis was done of the existing condition McClellands Basin
Drainageway. This analysis begins approximately 200 feet downstream of County
Road 9 and concludes 100 feet upstream of the western property line. The existing
corrugated metal pipe arch culvert under County Road 9 is 64 inches x 43 inches and
is 43 feet in length. Based on the current Master Plan SWMM analysis the flow in
the McClellands Basin Drainageway upstream of County Road 9 is 1002 cfs. The
downstream flow of County Road 9 is 1,422 cfs based on the current Master Plan
SWMM. Based on these flows the depth of flow over County Road 9 with the
existing culvert is 1.16 feet. The elevation of the existing County Road 9 at the
culvert crossing is 4905.
A second HEC-2 analysis was done which included the proposed box culverts under
County Road 9 and upstream at Corbett Drive. The same flow rates were used as in
the existing condition HEC-2 analysis as stated previously. The proposed box
culvert under County Road 9 shall be 6 feet high and 25 feet wide. The proposed box
culvert under Corbett Drive will be three sided, with the creek as the bottom portion,
left in its natural condition. This will remain the case until a 100-year event occurs.
During a 100-year storm it is likely that the concrete sides of the box will be fully
exposed. Based on this, the box culvert was modeled in its fully exposed size of 7
feet x 20 feet. With the proposed box culvert in County Road 9 the 100-year water
surface elevation at County Road 9 is 4905.52. The low point in the proposed
County Road 9 is approximately 4907.00. With the proposed box culvert under
Corbett Drive the 100-year water surface elevation is 4911.53. The low point in the
proposed Corbett Drive is approximately 4913.70.
Inlet A4a intercepts 100-year design flows of approximately 6.5 cfs from basins Al
and A14. These flows enter Storm Drain A2, which transports the flows through
approximately 440 LF of 36" Reinforced Concrete Pipe (RCP), into Pond A.
Inlet A4 intercepts 100-year design flows of approximately 5.2 cfs from basins Al2
and A15. These flows enter Storm Drain A2, which transports the flows through
approximately 440 LF of 36" Reinforced Concrete Pipe (RCP), into Pond A. Inlets
A4 and A4a are entering into the same 440 LF of 36" RCP.
Inlet A5 intercepts 100 year design flows of approximately 1.4 cfs from basin All.
' These flows enter Storm Drain A2, which transports the flows through approximately
65 LF of 36" Reinforced Concrete Pipe (RCP), into Pond A.
Inlet B2 intercepts 100 year design flows of approximately 50.05 cfs from basins B1,
B2, B6, B14-17. These flows enter Storm Drain B2-3, which transports the flows
through approximately 88 LF of 30" Reinforced Concrete Pipe (RCP), into Pond B.
' Inlet B3 intercepts 100 year design flows of approximately 8.1 cfs from basin B3.
These flows enter Storm Drain B2-3, which transports the flows through
' approximately 60 LF of 30" Reinforced Concrete Pipe (RCP), into Pond B.
' Inlet B 1 intercepts 100 year design flows of approximately 17.4 cfs from basin B 16.
These flows enter Storm Drain B 16, which transports the flows through
approximately 260 LF of 2 1 " Reinforced Concrete Pipe (RCP), into Pond B.
' Basin Il shall maintain historic flows to McClellands Basin Drainage way. The 100
year flows from this basin is approximately 0.48 cfs which are not historically nor
developed channelized flows and therefore are considered incidental flows to the
McClellands Basin Drainage way.
A SWMM analysis of the proposed Sage Creek development has been done. When
the model is finalized and approved it can be inserted into the Master Plan update
currently being prepared by the City's consultant. The results of the SWMM analysis
are included in the Appendix. The site was broken into 4 basins as shown on the
SWMM schematic. SWMM sub -basin 120 is composed of rational basins B4, B8-
B13. The total area of the SWMM basin is 8.78 acres and it drains into detention
pond #2 (Pond B). Pond #2 releases to McClellands Basin Drainage way via a
staged outlet control structure and approximately 170 L.F. of 30" RCP. The outlet
works will be designed and constructed to limit the discharge into the McClellands
Basin Drainage way to 0.2 cfs/acre for the 10-year storm and 0.5 cfs/acre for the 100-
year storm (in accordance with the Master Plan for McClellands Basin). Based on
these criteria, the total allowable release rate for the site is 28.2 cfs for the 100-year
storm and 11.4 cfs for the 10-year storm. SWMM sub -basin 100 is composed of
McClellands Basin. The total area of the SWMM basin is 6.83 acres. SWMM sub-
D. Hydraulic Criteria
All hydraulic calculations within this report have been prepared in accordance with
the City of Fort Collins Drainage Criteria and are also. included in the Appendix.
fE. Variances from Criteria
INo variances are being sought for the proposed project site.
IV. DRAINAGE FACILITY DESIGN
A. General Concept
All on -site runoff produced by the proposed Sage Creek development will be routed
' to one of the two proposed detention ponds via curb and gutter, cross -pans, sidewalk
chases, inlets, and underground storm drains. The outflow from the detention ponds
will be released into the McClellands Basin Drainageway and will then be conveyed
' under County Road 9 through a pair of box culverts (to be designed and constructed
by the Harvest Park development). The McClellands Basin Drainageway enters the
Fossil Creek Reservoir Inlet Ditch approximately 1.2 miles southwest of the site.
' A SWMM analysis was done of the site in order to determine the volume
requirements of the proposed detention ponds on the site. A HEC-2 analysis has
' been done of the McClellands Basin Drainageway in order to determine the existing
and proposed flood plain limits adjacent to the site.
B. Specific Details
The proposed Sage Creek development contains a total area of approximately 53.5
t acres, which has been divided into forty eight (48) sub -basins for Rational Method
runoff analysis. Basin designations with an `A' prefix drain to Pond A, basin
designations with a `B' prefix drain to Pond B. All basins drain to the north and/or
east, and are routed through on -site detention facilities, and eventually into the
McClellands Basin Drainageway. Please refer to Appendix B and the Drainage and
Erosion Control Plan in the back of this report.
Inlet A2 intercepts 100 year design flows of approximately 24.8 cfs from drainage
basins and Al — A6. These flows enter Storm Drain A2, which transports the flows
through approximately 805 LF of 30" and 36" reinforced concrete pipe (RCP), into
Pond A. The initial 65 LF of pipe is 24"x38" Horizontal Elliptical Reinforced
. Concrete Pipe (HERCP) due to small cover amounts with 30" circular at Inlet A2.
I I
i i
Drainageway eventually drains into the Fossil Creek Reservoir Inlet Ditch, which
transmits water to the Fossil Creek Reservoir.
B. Sub -basin Description
The area encompassed by the proposed Sage Creek development has been divided
into 48 sub -basins for Rational Method calculations. Runoff is routed to one of two
detention ponds (Ponds A and B). Ponds A and B will be located 100 feet south of
the existing McClellands Basin Drainageway. These on -site basins are proposed to
be developed with residential housing and street improvements, including
improvements to County Road 9 and County Road 36. These sub -basins are shown
on the Drainage and Erosion Control Plan in the back pocket of this report.
This development will also include improvements to the portions of County Road 9
and County Road 36 that are adjacent to the site. A majority of the runoff from the
roads will be directed onto the site and detained in the proposed detention ponds, in
accordance with City of Fort Collins directives.
III. DRAINAGE DESIGN CRITERIA
A. Regulations
The City of Fort Collins Storm Drainage Design Criteria is being used for the subject
site.
B. Development Criteria Reference and Constraints
The criteria and constraints from the McClellands Basin 100-year Master Plan and
subsequent update, dated April 1, 1996 are being utilized in this Final Drainage
Study. With this development, on site detention will be provided and flows will be
released into the McClellands Basin Drainageway at the rates defined by the Master
Plan.
' C. Hydrologic Criteria
The Rational Method for determining surface runoff was used for the project site.
The recently adopted 2-year and 100-year storm event intensities provided by the
City of Fort Collins were used in calculating runoff values. Regional hydrologic
modeling was completed using SWMM. These calculations and criteria are included
in the Appendix of this report.
II
FINAL DRAINAGE AND
EROSION CONTROL STUDY
FOR SAGE CREEK
FORT COLLINS, COLORADO
I. GENERAL LOCATION AND DESCRIPTION
A. Location
Sage Creek is bounded by County Road 9 on the east, private residences with large
lots on the west, the McClellands Basin Drainageway and the Harvest Creek
Subdivision on the north, and by County Road 36 on the south.
The site location can also be described as situated in the south half of the southeast
1/4 of Section 5, Township 7 North, Range 68 West of the 6th Principal Meridian,
City of Fort Collins, Larimer County, Colorado. A map showing the site location is
included in the Appendix.
B. Description of Property
Sage Creek contains approximately 53.5 acres of land, of which a majority is
currently cultivated farmland. The property is being proposed as a residential
development within the City of Fort Collins Zoning.
There is one existing concrete lined irrigation channel located in the western half of
the site. This channel has been used historically for irrigation of the existing adjacent
farmland only and has not been a drainage conveyance for storm events. The
removal of this channel will not affect any of the surrounding farm irrigation
channels. The channel will be removed with the Sage Creek development.
The topography generally slopes north-northeast towards the existing McClellands
Basin Drainageway at approximately 0.6 — 4.5 percent. McClellands Basin
Drainageway runs from west to east along the northern edge of the project boundary.
II. DRAINAGE BASINS
A. Major Basin Description
The Sage Creek development lies within McClellands Basin. The McClellands
Basin Drainageway flows in a generally southeast direction, and runs from west to
east along the northern edge of the project boundary. The McClellands Basin
APPENDIXA: VICINITY MAP.........................................................................................................................................................................A
APPENDIX B: RATIONAL METHOD HYDROLOGY....................................................................................................................................B
APPENDIXC: SWMM ANALYSIS AND POND DESIGN.............................................................................................................................. C
APPENDIXD: HEC-2 ANALYSIS..................................................................................................................................................................... D
APPENDIXE. PONDS, INLETS AND STORM DRAINS.................................................................................................................................E
APPENDIXF: RIPRAP DESIGN........................................................................................................................................................................F
APPENDIXG: STREET CAPACITY CALCULATIONS.................................................................................................................a.............. G
APPENDIXH: EROSION CONTROL AND WATER QUALITY.................................................................................................................. H
APPENDIX1: TABLES AND FIGURES............................................................................................................................................................1
APPENDIX 2: HEC-2 FLOOD PLAIN MAP, SWMM BASIN MAP................................................................................. BACK POCKET 1
APPENDIX 3: DRAINAGE AND EROSION CONTROL PLAN DRAWING SHEET ..................................................... BACK POCKET 2
TABLE OF CONTENTS
DESCRIPTION PAGE
I. GENERAL LOCATION AND DESCRIPTION................................................................................................................I
A.
LOCATION.........................................................................................................................................................................
I
B.
DESCRIPTION OF PROPERTY.............................................................................................................................................
I
H.
DRAINAGE BASINS...........................................................................................................................................................1
A.
MAJOR BASIN DESCRIPTION.............................................................................................................................................
1
B.
SUB -BASIN DESCRIPTION...................................................................................................................................................2
III.
DRAINAGE DESIGN CRITERIA................................................................................................................................2
A.
REGULATIONS...................................................................................................................................................................2
B.
DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS..............................................................................................2
C.
HYDROLOGIC CRITERIA...................................................................................................................................................2
D.
HYDRAULIC CRITERIA......................................................................................................................................................3
E.
VARIANCES FROM CRITERIA.............................................................................................................................................3
IV.
DRAINAGE FACILITY DESIGN......................................................................................................................................3
A.
GENERAL CONCEPT..........................................................................................................................................................3
B.
SPECIFIC DETAILS.............................................................................................................................................................3
V.
STORMWATER QUALITY...............................................................................................................................................6
A.
GENERAL CONCEPT..........................................................................................................................................................6
VI.
EROSION CONTROL.........................................................................................................................................................6
A.
GENERAL CONCEPT..........................................................................................................................................................6
B.
SPECIFIC DETAILS.............................................................................................................................................................6
VII.
CONCLUSIONS..............................................................................................................................................................7
A.
COMPLIANCE WITH STANDARDS.......................................................................................................................................7
B.
DRAINAGE CONCEPT.........................................................................................................................................................7
C.
STORMWATER QUALITY CONCEPT...................................................................................................................................
H
D.
EROSION CONTROL CONCEPT..........................................................................................................................................
H
VIII.
REFERENCES................................................................................................................................................................9
THE SEAR -BROWN GROUP
FULL -SERVICE DESIGN PROFESSIONALS
209 SOUTH MELDRUM
FORT COLLINS, COLORADO 80521-2603
970-482-5922 FAX:970-482-6368
August 20, 1999
Mr. Basil Hamdan
City of Fort Collins
Water Utilities--Stormwater
700 Wood Street
Fort Collins, Colorado 80522
RE: Final Development Plan Drainage and Erosion Control Study for Sage Creek
Dear Basil: '
We are pleased to submit to you, for your review and approval, this Final Development Plan
Drainage and Erosion Control Study for Sage Creek. All computations within this report have been
completed in compliance with the City of Fort Collins Storm Drainage Design Criteria.
We appreciate your time and consideration in reviewing this submittal. Please call if you have any
questions.
Respectfully,
The Sear -Brown Group
Prepared by:
Lee Cunning, P.E.
Design Engineer
Max McGowan, P.E.
Design Engineeer
Andrea H. Faucett, P.E.
HEC 2 consultant
cc: File 434-021A
Jim Postle, The James Company
Reviewed by:
Kevin W. Gingery, P.E.
Engineering Manager
David K. Thaemert, P.E.
Water Resource Engineer
NEW YORK • PENNSYLVANIA
COLORADO • UTAH • WYOMING
STANDARDS IN EXCELLENCE
EQUAL OPPORTUNITY EMPLOYER < _.
I
1.
I
I
i
Final Development Plan
Drainage and Erosion
Control Study
Sage Creek,
Fort Collins, Colorado
August 20, 1999
THE
SEAR -BROWN
GROUP
Standards in Excellence
I