HomeMy WebLinkAboutMULBERRY LEMAY CROSSINGS, LOT ONE, FILING ONE - FINAL PUD - 36-96D - CORRESPONDENCE - STORMWATER-RELATED DOCUMENTSCLC
Associates, Inc
December 14, 2000
SM L Orchard Rd.
Suite 2000
Englewood, CO 80111
303/770.5600
303/770-2349 FAX
Ms. Marsha Hilmes-Robinson
Floodplain Administrator
Utilities - Stormwater
700 Woods Street
P.O. Box 580
Fort Collins, CO 80522-0580
RE: Mulberry and Lemay Crossings - Lot 2
Stormwater Issues
Dear Ms. Hilmes-Robinson:
An.ryllblenlfn4i��'Yi lalltl lunwllmry.ln.
DEC 1 5 2000 D
One of the comments listed in the Stormwater Comment Sheet dated 10/30/00, was a
request for the Floodplain Use Permits to be revised to reflect the current building
elevations shown on the Lot 2 On -site Utility Plans. Enclosed are the revised Floodplain
Use Permits for Buildings C, D, E, F, I, and J.
Once you have signed these revised permits please forward a copy to me for our project
records.
Sincerely,
CLC Associates, Inc.
4/6J. /V��
Kurt D. Prinslow
Vice President
Director of Landscape Architecture
KDP:cst
cc: Mark Goldberg, Goldberg Property Associates, Inc.
Lucia Liley, March & Liley
Ted Sheppard, City of Fort Collins - Current Planning
Donnie Dustin, City of Fort Collins - Utilities/Stormwater
Planning
Engineering
Architecture
Landscape Architecture
Land Surveying