Loading...
HomeMy WebLinkAboutMULBERRY LEMAY CROSSINGS, LOT ONE, FILING ONE - FINAL PUD - 36-96D - CORRESPONDENCE - STORMWATER-RELATED DOCUMENTSCLC Associates, Inc December 14, 2000 SM L Orchard Rd. Suite 2000 Englewood, CO 80111 303/770.5600 303/770-2349 FAX Ms. Marsha Hilmes-Robinson Floodplain Administrator Utilities - Stormwater 700 Woods Street P.O. Box 580 Fort Collins, CO 80522-0580 RE: Mulberry and Lemay Crossings - Lot 2 Stormwater Issues Dear Ms. Hilmes-Robinson: An.ryllblenlfn4i��'Yi lalltl lunwllmry.ln. DEC 1 5 2000 D One of the comments listed in the Stormwater Comment Sheet dated 10/30/00, was a request for the Floodplain Use Permits to be revised to reflect the current building elevations shown on the Lot 2 On -site Utility Plans. Enclosed are the revised Floodplain Use Permits for Buildings C, D, E, F, I, and J. Once you have signed these revised permits please forward a copy to me for our project records. Sincerely, CLC Associates, Inc. 4/6J. /V�� Kurt D. Prinslow Vice President Director of Landscape Architecture KDP:cst cc: Mark Goldberg, Goldberg Property Associates, Inc. Lucia Liley, March & Liley Ted Sheppard, City of Fort Collins - Current Planning Donnie Dustin, City of Fort Collins - Utilities/Stormwater Planning Engineering Architecture Landscape Architecture Land Surveying