Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
THE GREENS AT COLLINDALE PUD - PRELIMINARY - 8-96 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORT
Geotechnical Engineering Exploration Land Source LLC Project No. 20965014 TABLE OF CONTENTS (cont'd) APPENDIX A Site Plan and Boring Location Diagram Logs of Borings APPENDIX B Laboratory Test Results APPENDIX C General Notes Terracon 2 Terracon TABLE OF CONTENTS Page No. Letterof Transmittal.............................................................................................................ii INTRODUCTION.................................................................................................................1 PROPOSEDCONSTRUCTION..........................................................................................1 SITEEXPLORATION..........................................................................................................2 FieldExploration......................................................................................................2 LaboratoryTesting..................................................................................................2 SITECONDITIONS............................................................................................................. 3 SUBSURFACECONDITIONS............................................................................................3 Geology................................................................................................................... 3 Soil and Bedrock Conditions...................................................................................4 Field and Laboratory Test Results........................................................................... 4 Groundwater Conditions....................................................... :.................................. 4 CONCLUSIONS AND RECOMMENDATIONS.................................................................... 5 Geotechnical Considerations...................................................................................5 FoundationSystems................................................................................................6 BasementConstruction........................................................................................... 7 SeismicConsiderations...........................................................................................7 Floor Slab Design and Construction........................................................................ 7 Pavement Design and Construction........................................................................ 8 Earthwork................................................................................................................13 Site Clearing and Subgrade Preparation.....................................................13 Excavation...................................................................................................13 Placement and Compaction.........................................................................15 Shrinkage.....................................................................................................16 Compliance.............................................................................:....................16 Excavation and Trench Construction...........................................................16 Drainage..................................................................................................................17 SurfaceDrainage.........................................................................................17 Additional Design and Construction Considerations................................................18 Exterior Slab Design and Construction........................................................18 Underground Utility Systems........................................................................18 CorrosionProtection....................................................................................19 GENERALCOMMENTS.....................................................................................................19 1 March 1, 1996 Land Source LLC 145 West Swallow Road, #9 Fort Collins, Colorado 80525 Attn: Mr. Gene Little Re: Geotechnical Engineering Report, The Greens at Collindale PUD, Lemay Avenue Fort Collins, Colorado Project No. 20965014 Irerracon CONSULTANTS WESTERN, INC. EMPIRE DIVISION P.O. Box 503 • 301 N. Howes Fort Collins, Colorado 80522 (970) 484-0359 Fax (970) 484-0454 Larry G. O'Dell, P.E. Neil R. Sherrod, C.P.G. Terracon Consultants Western, Inc., Empire Division has completed a geotechnical engineering exploration for the proposed Greens at Collindale PUD residential development to be located on South Lemay Avenue, Fort Collins, Colorado. This study was performed in general accordance with our proposal number D2096009 dated January 18, 1996. The results of our engineering study, including the boring location diagram, laboratory test results, test boring records, and the geotechnical recommendations needed to aid in the design and construction of foundations and other earth connected phases of this project are attached. The soils at the site consist of sandy lean clay and fat clay with sand underlain by silty sand with gravel and claystone bedrock. The upper clay soils at the site are moderately to highly expansive. Structures should be supported by conventional -type spread footings and/or grade beams or pads and/or grade beam foundation systems. Basement construction is feasible at the site; however, it is recommended that perimeter drains be provided around the lower basement areas. Due to the expansive nature of the upper clay soils at the site, consideration should be given to structural floor systems at the upper level where these materials will be found. Further details are provided in this report. We appreciate the opportunity to be of service to you on this phase of your project. If you have any questions concerning this report, or if we may be of further service to you, please do not hesitate to contact us. Sincerely, TERRACON CONSULTANTS WESTERN, INC. Empire Division ----z --- Senior Engineering i J. Attwooll, 4* Manager aA , 1W�i0E� s o° 91 © arm 6000000000 ��©® '/ AAA Offices of The Terracon Companies, Inc. Geotechnical, Environmental and Materials Engineers Arizona ■ Arkansas ■ Colorado ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Minnesota Missouri ■ Montana ■ Nebraska ■ Nevada ■ Oklahoma ■ Texas ■ Utah ■ Wyoming QUALITY ENGINEERING SINCE 1965 GEOTECHNICAL ENGINEERING REPORT THE GREENS AT COLLINDALE PUD LEMAY AVENUE FORT COLLINS; COLORADO PROJECT NO.20965014 March 1, 1996 Prepared for. LAND SOURCE LLC 145 WEST SWALLOW ROAD, #9 FORT COLLINS, COLORADO 80525 ATTN: MR. GENE LITTLE Prepared by: Terracon Consultants Western, Inc. Empire Division 301 North Howes Street Fort Collins, Colorado 80521 lrerracon