Page 3
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Culvert sizes
12
Please call out the actual elliptical pipe sizes that are being proposed rather than their circular equivalents.
Topic: grading and drainage
10
Please provide cross section C-C on sheet 4 as called for on the drainage plan.
Please show better on the plans the detailed grading between the pond outlet and the proposed pan.
Topic: Pond requirements
11
It seems like the pond volume is not being increased instead a variance request for a lower freeboard is
being requested. This is the 3rd time a variance request is being sought on this site, ratjer than trying to meet
criteria. Either justify the variance request better to meet at least the 9" freeboard as previously.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Parking
8
Relocate the handicap parking near the entrance of the school to the south in order to reduce the number
of drive aisle crossings for people. (see red lines)
Topic: site plan
7
Identify the student pick-up and drop-off points on the site plan. Provide a street striping plan for the internal
circulation.
9
Increase the width of the sidewalks to six feet for the main pedestrian entrance from Hickory along the drive
aisle to the entrance, also where car overhang exists, and to increase the seperation between students and
vehicles in the pick-up and drop-off area. (see red lines)
Department: Water Wastewater
Topic: General
Issue Contact: Jeff Hill
5
Meter pits and curb stops may not be placed in sidewalks or other hard surfaces.
Department: Zoning
Topic: General
Issue Contact: Peter Barnes
3
The site plan (on the building footprint) states this is to be an office building. Need to change language so
that it is office/private school.
Topic: Parking
1
The drive aisle width behind the row of 16 parking spaces needs to be 20', not the 12'that is shown. (Sec.
3.2.2(L)(1), Table A)
2
Is there a bike rack?
Be sure and return all of your redlined plans when you re -submit.
Page 2
f
STAFF PROJECT REVIEW
clty of roe conlns
Charlie Meserlian Date: 11/26/2001
2324 Plains Court
Fort Collins, CO 80526
Staff has reviewed your submittal for LEVON'S 2ND, WAREHOUSE AND OFFICE
BUILDING PDP, MAJOR AMENDMENT - TYPE I (LUC), and we offer the following
comments:
ISSUES:
Department: Current Planning
Topic: General
14
Issue Contact: Troy Jones
The hearing is set for December 10th at 4:00 p.m. at 281 North College. All of these comments from all
departments will need to be resolved prior to recording the mylars. The staff signing of Utility Plan revisions
should be coordinated with Dave Stringer, Site Plan, Landscape Plan, and Elevation mylars will need to be
provided to directly to me.
Topic: landscape plan
16
Extend the Lilacs aroundthe corner in the parking lot island to minimize the visual connection between the
existing industrial uses and the school use. See redlines.
17
Submit 3 copies of blue prints of the original approved landscape plan showing clouded areas in red where
landscaping is being removed. Clarify what is being removed with labeling. See redlines.
Topic: site plan
13
The site plan needs to show the treatment of the drive aisle barrier area between the existing building's
vehicular area and the new building's vehicular area the same way as it is shown on the Utility Plan. This is the
area where vehicles are not allowed, but the plastic bollards will need to be in place so fire truck access can
use the connection.
15
The drive aisle width shown as 12 feet wide needs to be widened to a minimum of 20 feet in width.
Department: Engineering
Topic: General
Issue Contact: Dave Stringer
4
Have issue with size of radii being proposed for Fire Lane. Fire engine turning template does allow for truck to
make turns without running over curbs and landscaping. Also need to look at no parking area at western
end of building to mid way point. Appears to be conflict between truck ladder extension and building if
vehicles are parked in this area
Department: PFA
Topic: General
Issue Contact: Michael Chavez
Turning radii shall be 20 feet inside and 40 feet outside.