HomeMy WebLinkAboutHARVEST PARK - MAJOR AMENDMENT & REPLAT - 25-98G - CORRESPONDENCE - REVISIONSL a n d s c a p c A r c.h i t c c t u r c
S i t e P l a n n i n g
G r a p h i c s
28. Assuming approval is granted in a timely fashion, the overall phasing for Harvest Park will not
change.
Stormwater Utility
1. Acknowledged, reference revised erosion control plan.
I Comments added as requested.
10. Details have been provided as requested.
21. The symbol has been changed.
22. ,The note has been corrected.
Transportation Planning
1. The internal sidewalks have been extended as requested.
Zoning
1. The new street name is Fruited Plains.
2. Lot numbers have been correlated on all plans.
3. This is to be determined by mapping.
I appreciate your time in reviewing these plans. If you have -any further questions, please feel free to
contact me.
Cc George Wingfield, Writer Corporation
Jim Allen -Morley, The Sear Brown Group
• C i v i c. Cc n t e r V i l l a g c
144 North Mason Street Suite 2 • Fort Collins, Colorado 80524
- (970) 472-9125 • Fa :(97.0) 494-0728
RECEIVED
L a n d s c a p e A r c h i t e c t u r e
S it e P l an n in g
G r a p It i c s
August 27, 2002
Troy Jones, Project Planner
Current Planning Division
City of Fort Collins
281 N. College Avenue
Fort Collins, CO 80524
Dear Troy,
All G 2.8 2002
JRAENT PLANNING
Attached are revisions to the Harvest Park Major Amendment and Replat, revised in response to City
staff and agency review comments dated July 25, 2002. Since the comments were relatively minor, and do
not impact the site design, I would request that this item be placed on a hearing schedule as soon as
possible.
Staff comments are addressed as follows:
Current Planning,
9. Acknowledged.
10. Acknowledged.
H. Complete.
12. Complete.
13. Noted, reference the various plan sets
Engineering
5. The street name was an error in communications. The name has been changed to Fruited Plains.
6. This will be completed prior to recording of mylars.
12. The utility plan description has been revised.
16. The access ramps have been changed to be directional as requested.
29. The various plan sets have been coordinated.
32. Acknowledged.
Plat
9. The language has been revised.
13. Acknowledged
14. Separate block numbers have been used.
15. This has been corrected.
Street Design
18. The linetype has been revised as requested.
19. Additional spot elevations have been provided.
24. Acknowledged.
30. Acknowledged,
Utility Plan
17. This has been corrected.
25. Signature blocks have been added.
26. Acknowledged.
27. Comments acknowledged and accommodated.
-Civic Center 'Village -
144 North Mason Street Suite 2 - Fort Collins, Colorado 80524
(970) 472-9125 - P'ax:(970) 494-0728 ,