Loading...
HomeMy WebLinkAboutHARVEST PARK - MAJOR AMENDMENT & REPLAT - 25-98G - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE RELATED DOCUMENTARCHITECTURE 209 South Meldrum ^_ ENGINEERING Fort Collins, CO80526 5.0 SEAR • BB R� PLANNING 970.482.5922 phone CONSTRUCTION 970.482.6368 fax www.searbrown.com June 14, 2002 Mr. Basil Harridan 700 Wood Street Fort Collins, Colorado 80521 RE: Drainage Letter Report for the Harvest Park 4`h Filing - Multi -Family Basil, The purpose of this letter is to confirm that the drainage conditions set forth in the Final Drainage and Erosion Control Study for Harvest Park, dated March 2000, have not been substantially changed. The area presented in Harvest Park 4Lh Filing represents a change in use from single family units to multi- family units. Drainage basins identified as Basins B1, B2, B27 and B28 do not significantly change in size or horizontal position. Basin runoff coefficients range from 0.78 to 0.86. Due to the similarity in use, grading and basin delineation, minimal variation in site drainage is expected when compared to the approved drainage design presented in the Final Harvest Park Drainage and Erosion Control Study. Therefore, the Harvest Park 4`h filing site is within the criteria of the Drainage Report. If you have any further questions please do not hesitate to contact me. Sincerely, 4�AnthG. Willkomm, P.E. for Jim Allen -Morley, P.E. Project Manager CC: File