Loading...
HomeMy WebLinkAboutTHE GREENS AT COLLINDALE P.U.D. - REPLAT - 8-96B - CORRESPONDENCE - (3)remaining issues are those that do not require plan revisions, a status report verifying continuing efforts toward resolving the issues is required within the same timeline. b. A utility coordination meeting needs to be conducted to coordinate how this replat would affect grading, water lines, sewer lines, gas lines, electric lines, trees, curbs, and sidewalks that are already in place. The departments that need to be present include Light & Power, Water/Wastewater, Engineering, Public Service, and Current Planning. c. It is very confusing what exactly is changing from the existing approved condition. Please provide a site plan that shows both existing and proposed building envelope locations, :driveway locations, curbs, and tree locations. To adequately perform this review, we need a tool (the requested site plan) to compare what is approved to what you are changing. d. It does not seem existing driveway locations work with the new lot line locations. Please adjust the driveway locations and clarify that they do in fact work. e. It is unclear if the curb in front of lots 14-and 15 is changing._ This may affect approved parking numbers. Please clarify how curbs (throughout the project) are affected by this replat, and how any change in curbs may affect the approved parking. f. The Stormwater Department has indicated that the quality, of the . submittal is poor. With the number of outstanding issues, you will need .to submit revisions for at least one more formal round of review. Be sure and return all your redlined plans when you resubmit. If you have any questions about these or any other issues related to this project please feel free to call be at 221-6750. Yours truly, Troy Jones City Planner 2 6 9 City of Fort Collins Commur'`v Planning and Environmental S~vices Current Planning STAFF REVIEW COMMENTS William E. Watson Jr. Land Source LLC 1136 E. Stuart Street #4203 Fort Collins, CO 80525 March 30, 2000 Staff has reviewed your submittal for Replat of Greens at Collindale, and we offer the following comments: COMMENTS: 1. Water/Wastewater Utility Department, Stormwater Utility Department, Mapping and Drafting, Engineering: a. Please see. the attached comment sheets and the redlined plans from these departments. 2. Poudre Fire Authority, Public Service, Light & Power: a. Please see the attached comment sheets from these departments. 3. Traffic Operations: a. Eric Bracke waived a traffic study for this project. 4. Zoning, Advance Planning, Natural Resources, Building Inspection, Post Office, AT&T Cable, Park Planning: a. These department reviewed .the proposal and have no comments. 5. Current Planning: a. Section 2.2.11 of the Land Use Code requires that an applicant submit revisions based on this letter within 90 days or the project application becomes null and void. Your response to the City's concerns is due by June 28, 2000. A 30day extension to this deadline is available. All requests for an extension should be directed to the Current Planning Director. If 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020