Loading...
HomeMy WebLinkAboutHARVEST PARK, 3RD FILING, REPLAT OF LOTS 27 - 32 - 25-98F - DECISION - FINDINGS, CONCLUSIONS & DECISIONHarvest Park 3'd Filing Replat, PDP Administrative Hearing Findings, Conclusions, and Decision March 27, 2002 Page 4 of 4 C. The Harvest Park, Td Filing Replat, Project Development Plan, complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. DECISION The Harvest Park, 3`d Filing Replat, Project Development Plan, #25-98F, is hereby approved by the Hearing Officer without condition. Dated this 5th day of April 2002, per authority granted by Sections 1.4.9(E) and 2.1 of the Land Use Code. Cameron Gloss Current Planning Director Harvest Park 3`d Filing Replat, PDP Administrative Hearing Findings, Conclusions, and Decision March 27, 2002 Page 3 of 4 FACTS AND FINDINGS The surrounding zoning and land uses are as follows: N: RL — Single Family Residential S: LMN — Single Family, Multi Family Residential W: RL - Railroad, Single Family Residential E: FA1 (County) - Vacant This property was annexed into the City as part of the Ruff Annexation in September 1999. 1. Compliance with Article 4 and the LMN Zoning District Standards: The Project Development Plan complies with all applicable requirements of Article 4 and the LMN Zoning District. The Staff Report summarizes the PDP's compliance with these specific standards and no specific evidence was presented to contradict the statements and conclusion of the staff report concerning compliance with Article 4 or the LMN District Standards. 2. Compliance with Article 3 of the Land Use Code — General Development Standards The Project Development Plan complies with all applicable requirements of Article 3 including the plat standards of Section 3.3.1. No evidence was presented to contradict the statements and conclusion of the staff report concerning compliance or to otherwise refute the compliance with Article 3. In order to meet all requirements of Poudre Fire Authority, each house constructed within the replatted area will include an automatic fire sprinkler system. Additionally, an access, pedestrian access, and emergency access easement will be dedicated within the private drive constructed on Tract B. SUMMARY OF CONCLUSIONS A. The Harvest Park, 3rd Filing Replat, Project Development Plan, is subject to administrative review and the requirements of the Land Use Code (LUC). B. The Harvest Park, 3rd Filing Replat, Project Development Plan satisfies the development standards of the LMN zoning district. Harvest Park Td Filing Replat, PDP Administrative Hearing Findings, Conclusions, and Decision March 27, 2002 Page 2 of 4 NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established no controversy or facts to refute that the hearing was properly posted, legal notices mailed and notice published. The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the hearing at approximately 3:45 p.m. on March 27, 2002 in Conference Rooms C and D at 281 North College Avenue, Fort Collins, Colorado. HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE: The Hearing Officer accepted during the hearing the following evidence: (1) Planning Department Staff Report; (2) application, plans, maps and other supporting documents submitted by the applicant and the applicant's representatives to the City of Fort Collins; (3) a sign up sheet of persons attending the hearing; and (4) a tape recording of testimony provided during the hearing. The LUC, the City's Comprehensive Plan (City Plan), and the formally promulgated policies of the City are all considered part of the evidence considered by the Hearing Officer. The following is a list of those who attended the meeting: From the City: Bob Barkeen, City Planner From the Applicant: Terence Hoaglund, Vignette Studios George Winfield, Writer Corporation From the Public: None Written Comments: None City of Fort Collins Commu..ity Planning and Environmental cervices Current Planning CITY OF FORT COLLINS ADMINISTRATIVE HEARING OFFICER TYPE I ADMINISTRATIVE HEARING FINDINGS, CONCLUSIONS AND DECISION ADMINISTRATIVE HEARING DATE: PROJECT NAME: CASE NUMBER: APPLICANT: HEARING OFFICER: PROJECT DESCRIPTION: March 27, 2002 Harvest Park Third Filing Replat, PDP #25-98F Vignette Studios 144 North Mason Street, Suite 2 Fort Collins, CO 80524 The Writer Corporation 6061 South Willow Drive, Suite 232 Englewood, CO 80111 Cameron Gloss Current Planning Director This is a request to replat 6 existing single family lots within the Harvest Park Subdivision. The proposed area to be replatted is located at the northwest corner of Rock Creek Drive and Ziegler Road. The resulting plat will consist of 6 single family lots, one access easement tract and three open space tracts. The original residential lots ranged in size from 7,800 sq.ft. to 11,500 sq.ft., totaling 1.33 acres. The resulting single family lots will range in size from 5,100 sq.ft. to 6,900 sq.ft. SUMMARY OF HEARING OFFICER DECISION: Approval ZONING DISTRICT: LMN- Low Density Mixed Use Neighborhood Zoning District. STAFF RECOMMENDATION: Approval 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 271-6750 • FAX (970) 416-2020