I appreciate your time in reviewing these plans. • If ys�u have any further questions, please feel free to
contact me.
I
Terence C.
Cc George Wingfield, Writer Corporation
Dino DiTullio, The Everitt Companies
Jim Allen -Morley, The Sear Brown Group
• (--i v i c C e n t e r 'Villagec
144 North Mason Street Suite 2 • Fort Collins. Colorado 80524
(970) 472-9125 • Fax:(970) 494-0728
L a n d s c a p e A r c h i t e c t u r e
S i t e P l a n n i n g.
G r a p h i c s
February 8, 2002
Bob Barkeen, Project Planner
Current Planning Division
City of Fort Collins '
281 N. College Avenue
Fort Collins, CO 80524
Dear Bob,
Attached are revisions to the Harvest Park 3rd Filing Replat and Minor Amendment, revised in response
to City staff and agency review comments dated October 5d', 2001.
Dino DiTullio met with Dave Stringer regarding the major issue of replating the median in Rock Creek
Drive. It was agreed, that we would not replat the median, and engineering would agree to letting us
construct a planter within the median, so long as the Harvest Park HOA maintains it, and it is located
outside of the sightlines. The revisions reflects this, and as such we have separated our drawing into two
minor amendments since the replat of the lots will still have to go before a hearing officer.
Other comments are addressed as follows:
A. Technical $ervices ,
. , • A note has been added regarding ownership and maintenance of the tracts.
B. Stormwater
• Revised grading plans have been submitted.
C. Current Planning
• As noted above, we are no longer vacating a portion of the Rock Creek Drive Right -Of -Way, so a
vacation process is not required.
• The access drive pavement has been extended to Rock Drive, but is barricaded for vehicular use,
and is ideal for pedestrian use.
D. Engineering
• As noted above, we are no longer vacating a portion of the Rock Creek Drive Right -Of -Way.
• The plat note regarding access to the lots will be added.
• Utility drawings have been revised and updated.
E. PFA
• These revisions reflect what has been agreed upon with PFA.
F. Transportation
• This median and, intersection was constructed per the approved Harvest Park Utility plans.
Crosswalk issues and median refuges should have been addressed at that time.
• Why do we need to look at alignment issues, when all four legs of the intersection are approved
built, and/or under construction? We do not feel a context view is appropriate at this time.