HomeMy WebLinkAboutLEVON'S 2ND PHASE, WAREHOUSE & OFFICE BUILDING - PDP/FDP - 19-96C - DECISION - FINDINGS, CONCLUSIONS & DECISIONLevon's Warehouse and Office Building PDP/Replat Administrative Hearing June 21, 2001 Page 8 of 8 FINDINGS AND CONCLUSIONS After reviewing the staff report and the record of the public hearing, the Hearing Officer makes the following findings and conclusions: A. The Levon's 2"d Warehouse and Office Building Project Development Plan/Replat is subject to administrative review and the requirements of the Land Use Code (LUC). B. The Levon's 2"d Warehouse and Office Building Project Development Plan/Replat conforms to standards of the CN zoning district. C. The Levon's 2Id Warehouse and Office Building Project Development Plan/Replat, complies with all applicable General Development Standards contained in Article 3 of the Land Use Code except Section 3.2.1 (E)(5)(c). D. Future development of the property will be required to meet Land Use Code Division 2.6 DEVELOPMENT CONSTRUCTION PERMITS; and, Division 2.7 BUILDING PERMITS. DECISION Based on the findings and conclusions, the request for the Levon's 2"d Warehouse and Office Building Project Development Plan/Replat is approved subject to the following condition: The applicant shall ensure that the subdivision plat signature blocks are modified to reflect the Type I review process, and that is in a form acceptable to the City Engineer, prior to submittal for City approval and plat recordation. Dated this 26th day of June 2001, per authority granted by Sections 1.4.9(E) and 2.1 of the Land Use Code. Cameron Glo Current Planning Director Levon's Warehouse and Officc Building PDP/Replat Administrative Hearing June 21, 2001 Page 7 of 8 consistent relationship of the building to the street sidewalk in order to form a visually continuous, pedestrian -oriented streetfront. The applicant granted a modification by the Planning and Zoning Board on June 1, 2000 to locate the new building 20 feet from the Hemlock right-of-way, and to have the front of the building face the interior of the site rather than the street (currently a gravel road). The proposed plan therefore meets the requirements of this section. D. Transportation and Circulation [3.6] 1. Master Street Plan [3.6.1] — There are no arterial or collector streets identified on the Master Street Plan adjacent to this site. 2. Transportation Level of Service Requirements [3.6.4] — The Transportation Planning Department and the City Traffic Engineer have determined that the project meets the applicable Level of Service (LOS) requirements. 3. Transit Facilities Standards [3.6.5] — There is an existing Transfort route that goes down College Avenue. Employees and customers can utilize this existing system including the existing bus stops. FINDINGS OF FACT After reviewing the Levon's 2Id Warehouse & Office Building P.D.P., File #19-96C, staff makes the following findings of fact and conclusions: 1. The proposed land uses are permitted in the (CN) Commercial — North College zone district subject to Type 1 review. 2. The Project Development Plan complies with all applicable district standards of Section 4.18 of the Land Use Code, the (CN) Commercial — North College zone district. 3. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code except where the aforementioned modification has been granted. 4. The proposed plat complies with all applicable criteria in the Land Use Code. STAFF RECOMMENDATION Staff recommends approval of the Levon's 2nd Warehouse & Office Building P.D.P. File #19-96C. Levon's Warehouse and Officc Building PDP/Replat Administrative Hearing June 21, 2001 Page 6 of 8 and 3pm on December 21 ". The physical elements of the development plan are located and designed in a way that will not cast a shadow onto structures within the site or on adjacent property greater than allowed in this section of the code. 4. Site Lighting — [3.2.4] — As required the applicant is using lighting fixtures that are concealed and fully shielded featuring sharp cut-off capability which reduces up -light, spill -light, glare and unnecessary diffusion on adjacent property. The proposed fixtures are wall mounted on the building wall itself. The PDP therefore satisfies this requirement. B. Engineering Standards [3.3] 1. Plat Standards [3.3.1 ] The plat has been reviewed against the criteria of the Plat Standards of the Land Use Code. The request to create a 3.34 acre lot complies with the following standards: • Lots [3.3.1(B)(1)] - The new lot has frontage along Hickory Street and Hemlock Street, both dedicated public right-of-ways. Vehicular access will be off of Hickory Street. Side lot lines are substantially at right angles or radial to the street line. The lot layout meets the City's street connectivity standards to the extent feasible. • Public Sites, Reservations, and Dedications [3.3.1(C)(1)] - The plat indicates proper dedications for drainage and utility easements as needed to serve the lot. 2. Water Hazards [3.3.3] — The PDP has been reviewed by and complies with the requirements of the Stormwater Department. 3. Engineering Design Standards [3.3.5] — This project complies with all design standards, requirements, and specifications for all of the commenting departments and agencies. C. Building Standards [3.5] 1. Building and Project Compatibility [3.5.1 ] — The proposed structure is compatible with the context of the surrounding area. 2. Mixed -Use, Institutional and Commercial Buildings [3.5.3] — The proposed building, satisfies the variation in massing, fapade treatment, entrance treatment, and the base and top treatment requirements, as required of any commercial building. Section 3.5.3(B)(2) of the Land Use Code requires that a minimum 15 foot build to line is established and that the build -to line is based on a Levon's Warehouse and Office Building PDP/Replat Administrative Hearing June 21, 2001 Page 5 of 8 pedestrian to cross a drive aisle or vehicle area, thereby satisfying this requirement. • Access and Parking Lot Requirements [3.2.2(D)] — Vehicle areas are clearly separated from walkway areas. Unobstructed vehicular access is provided from the public street to all parking spaces. All off-street parking areas are surfaced with materials in conformance with city specifications. The project therefore complies with access and parking lot requirements. • Parking Lot Layout [3.2.2(E)] — The parking lot provides well-defined circulation routes for vehicles, bicycles and pedestrians. Landscaped peninsulas with raised curbs define parking lot entrances and the end of parking aisles. The proposed plan provides continuous, direct pedestrian access with a minimum of driveway and drive aisle crossings. No parking bays extend more than 10 spaces without an intervening landscape peninsula. This standard is satisfied. • Required Number of Spaces for Type of Use [3.2.2(K)] — The proposed building proposes office uses and warehouse uses in one building. Office uses are limited to a maximum of 3 parking space per 1000 square feet of leasable floor area, and warehouse uses are limited to .75 spaces per employee. The site plan depicts 15 parking spaces to be built, and identifies a potential future parking expansion area of another 18 spaces. Staff required the following note to be included on the site plan: "If not enough uses are located in this building to allow the total number of parking spaces proposed for phase 1 (15 spaces), a minor amendment will be filed to remove enough spaces to bring the site into compliance with the L. U. C. Conversely, if uses allow parking spaces to be added, spaces will be added as phase 2 parking, the number to be in accordance with 3.2.2(K) (2) (a) of the L.U.C. but not more than the 18 spaces indicated unless a minor amendment for the additional spaces is filed for and approved." With the inclusion of the said note, the application satisfies this standard. • Handicap Parking - [3.2.2(K)(4)] — The applicant has provided two handicap spaces, therefore the application satisfies this requirement. • Parking Stall Dimensions - [3.2.2(L)] —The standard parking stalls are 9'x19', which satisfies this requirement. 3. Solar Access, Orientation, Shading [3.2.3] — The proposed plan is designed in a way that protects its roofs access to sunshine between 9am Levon's Warehouse and Office Building PDPIReplat Administrative Hearing June 21, 2001 Page 4 of 8 coniferous evergreens or ornamental trees. The proposed site plan satisfies this standard. • Street Trees [3.2.1(D)(2)] — Street trees are required at 30 to 40 foot spacing along adjacent streets. The applicant satisfies this standard. • Minimum Species Diversity [3.2.1(D)(3)] —Based on the total proposed number of new trees (33), the applicant would be allowed to have up to 33% of any one species (11), but has only proposed a maximum of 10 of one species, therefore satisfies the minimum species diversity requirement. • Foundation Plantings [3.2.1(E)(2)(d)] —All exposed sections of building walls have planting beds of at least 5 feet in width along at least 50% of such facade. The landscape plan therefore satisfies the foundation plantings requirement. • Parking Lot Perimeter Landscaping [3.2.1(E)(4)] —The parking lot is screened from off -site views by plant material and building placement. The landscape plan therefore satisfies the parking lot perimeter landscaping requirement. • Parking Lot Interior Landscaping [3.2.1(E)(5)] — The parking lot area on the site plan is required to devote at least 6% of the area of the parking lot to landscaped areas. There is a large landscape island between the proposed parking and the existing parking area, which greatly exceeds the 6% minimum area for landscaping requirement. • Screening [3.2.1(E)(6)] —Landscape, fencing, and building elements are placed to adequately screen areas of low visual interest and visually intrusive site elements including the outdoor storage area and the trash enclosure area. 2. Access, Circulation and Parking [3.2.2] • Safety Considerations [3.2.2(C)(1)] — Pedestrians are separated from vehicles and bicycles to the maximum extent feasible, thereby satisfying this requirement. • Curbcuts and Ramps [3.2.2(C)(2)] — Ramps are provided along the northern facade to give vehicular access to overhead garage doors, thereby satisfying this requirement. • Bicycle Facilities [3.2.2(C)(4)] —A bicycle rack is being provided adjacent to the new building, thereby satisfying this requirement. • Walkways [3.2.2(C)(5)] —A grade separated sidewalk directly connects the street sidewalk with the main entrance of the new building without requiring a Levon's Warehouse and Offices Building PDP/Replat Administrative Hearing June 21, 2001 Page 3 of 8 CN — existing industrial uses, E: CN - Union Pacific Railroad right-of-way and tracks, vacant land, S: POL — Work Center for Roosevelt National Forest, Salyer Natural Area, W: CN — The city owned Hickory Trail, Rural residential property with horses, Industrial Uses. 2. Division 4.18 of the Land Use Code Commercial — North College District (CN) The proposed uses of "offices" and "warehouses" are both permitted uses in the (CN) Commercial — North College District subject to administrative review. The PDP meets the applicable Land Use Standards [4.18(D)] as follows: • This section of code limits the height of any building in this zone district to a maximum of 3 stories. The proposed building is a single story building; therefore this standard is satisfied. The PDP meets the applicable Development Standards [4.18(E)] as follows: • This section of code requires that all development in the CN zone district also comply with the standards contained in the Standards and Guidelines for the North College Avenue Corridor as adopted by the city, to the extent that such standards and guidelines apply to the property to be developed. This document deals with the treatment of development adjacent to North College Avenue. This site is not adjacent to North College Avenue; therefore this standard is satisfied. 3. Article 3 of the Land Use Code — General Development Standards The Project Development Plan complies with all applicable General Development Standards as follows: A. Site Planning and Design Standards [3.2] 1. Landscaping and Tree Protection [3.2.1] • Full Tree Stocking [3.2.1(D)(1)(c)] — Full tree stocking is required in all landscaped areas within 50 feet of any building along high use or high visibility sides. Full tree stocking is formal or informal groupings of trees planted at 30' to 40' spacing intervals for canopy shade trees, or at 20' to 30' spacing intervals for Levon's Warehouse and Offic, Building PDP/Replat Administrative Hearing June 21, 2001 Page 2 of 8 ZONING DISTRICT: (CN) Commercial — North College NOTICE OF PUBLIC HEARING: Notice of public hearing was made on June 7, 2001 by mailing to property owners within 1,000 feet of the subject property. The public hearing was advertised in the Coloradoan. PUBLIC HEARING After reviewing the Staff Report and recommendation, a public hearing was held on the subject application at 3:30 PM on June 21, 2001. The hearing was held in Conference Room A at 281 North College, Fort Collins, Colorado. HEARING TESTIMONY WRITTEN COMMENTS AND OTHER EVIDENCE: The following is a list of those who attended the meeting: From the City: Troy Jones, City Planner From the Applicant: Charles Maserlian, Applicant/Owner Written Comments: None BACKGROUND The staff report states the following: Background The surrounding zoning and land uses are as follows: N: LMN — Hickory Street, Hickory Mobile Home Park, Union Pacific Railroad right-of-way and tracks, Citv of Fort Collins Comm, 'y Planning and Environmental Current Planning CITY OF FORT COLLINS rvices ADMINISTRATIVE HEARING OFFICER TYPE I ADMINISTRATIVE HEARING FINDINGS, CONCLUSIONS AND DECISION HEARING OFFICER: PROJECT NAME: CASE NUMBER: APPLICANT/OWNER: PROJECT DESCRIPTION: Cameron Gloss Current Planning Director Levon's 2"d Warehouse and Office Building Project Development Plan/Replat # 19-96C Charles Maserlian Fort Collins Truck Sales 700 N. College Ave. Fort Collins, CO 80524 The applicant is proposing to develop a 20,000 square foot office/warehouse building on a 2.2 acre site located in the 300 block of West Hickory Street. The property is bounded by Hickory Street on the north, the Union Pacific Railroad track and right-of-way on the east, Hemlock Street on the south, and regional bicycle trail on the west. The property is located in the Commercial — North College (CN) zone district. SUMMARY OF RECOMMENDATION AND DECISION: The proposed land uses are permitted in the CN zone district subject to a type 1 review. The Project Development Plan complies with all applicable district standards of Section 4.18 of the Land Use Code, (CN) Commercial — North College zone district. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code except where a modification was granted from the Planning and Zoning Board. The request to replat the property, which dedicates public right-of-way and vacates and dedicates easements, meets all plat requirements of the Land Use Code. STAFF RECOMMENDATION: Approval HEARING OFFICER DECISION: Approval, with conditions 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020