HomeMy WebLinkAboutLEVON'S 2ND PHASE, WAREHOUSE & OFFICE BUILDING - PDP/FDP - 19-96C - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTAll soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or discing along land contours until mulch, vegetation, or other permanent erosion control is installed. No soils in areas outside project street rights -of -way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the Stormwater Utility. The property shall be watered and maintained at all times during construction activities so as .to prevent wind -caused erosion. All land disturbing activities shall be immediately discontinued when fugitive dust impacts adjacent properties, as determined by the City of Fort Collins Engineering Department. All temporary (structural) erosion control measures shall be inspected and repaired or reconstructed as necessary after each runoff event in order to assure continued performance of their intended function. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as to not cause their release into any drainageway. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any stockpile remaining after 30 days shall be seeded and mulched. City Ordinance prohibits the tracking, dropping or depositing of soils or any other material onto City streets by or from any vehicle. Any inadvertently deposited material shall be cleaned immediately by the contractor. Attached is the cost estimate for the erosion control escrow required by the proposed construction of a warehouse -office building in the 300 block of West Hickory Street (Levons 2nd Warehouse and Office Building). Seeding - 2.33 ac @ $655/ac Escrow required = $1526.15 x 1.5 = $1526.15 �1 J 1 J In the southeast corner of the site, regrading reults in a smaller subbasin discharging south along the Union Pacific RR. Because the runoff coefficient "c" does not change in this basin, developed runoff is less than the historical runoff rate. The SDDC outlines the causes and results of soil erosion due to wind and rain. Along with the requirements of this report and the erosion control plans, the SDDC shall be considered in it's entirety for guidelines to aid in preventing rainfall and wind soil erosion. The SDDC will govern requirements and specifications for earth moving and other construction at the site. ' Until permanent seeding is established, straw bale dikes will be constructed to cause any loose, fine grained soils transported by surface runoff to settle out. Along the south property line and a portion of the west property line, temporay silt fences will be constructed to prevent sediment from being deposited upon the public right of way in the event of heavy rains. The fence also will act somewhat as a wind barrier, keeping low blowing fugitive dust from leaving the site. As field operations continue, disturbed areas will have hay mulch disced into the ground to provide cohesiveness to the soils. Where disturbed areas are to be of very short term, discing ridges perpindicular to the prevailing winds may be substituted. Below are general erosion control requirements which the contractor will be required to follow. As required, a cost estimate for an erosion control security escrow is included with this report. 1 A. Summary of Erosion Control Requirements The following is a summary of the storm drainage improvements and erosion control measures that will be adhered to during construction. GENERAL EROSION CONTROL REQUIREMENTS The City of Fort Collins Stormwater Utility erosion control inspector must be notified at least 24 hours prior to any construction on this site. All required perimeter fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc.). All other required erosion control measures shall be installed at the appropriate time in the construction sequence t as indicated in the approved project schedule, construction plans, and erosion control report. Pre -disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area required for immediate construction operations, and for the shortest practical ' period of time. utility drawings, and are also included in this report building site is not affected. :�+�$ s a,t In summary, the proposed Because the site is located in the Poudre River Drainage Basin, the StormWater Utility does not require on -site detention to maintain historical release rates. D. Proposed Drainage Improvements Site grading will generally allow storm run-off to maintain existing sheet flow patterns. Concentrations of run-off will be avoided to keep run-off velocities ' very low, assisting in percolation and infiltration into the on -site clay loams. Existing conditions are flat and do not allow the customary 2% min. slope for earthen drainage, and there may be areas of standing water for brief periods of ' time after severe storms. The Owner is willing to accept this condition, and is asking the Stormwater Utility to grant a variance for a minimum .40 % grade due to existing conditions. The Owner is also requesting that fill areas be allowed to be constructed with 3:1 side slopes in lieu of the recommended 4:1 slope to diminish the amount of fill required to raise the building pad. Proposed drainage improvements consist primarily of filling and grading the site to direct runoff to the southwest corner of the site. RCP pipes, structural class IV, will be installed on -site to transport runoff from the north and east portions of the site beneath the entry drive and parking areas to the southwest corner of the site. The Stormwater Utility requires that accomodations be provided to ensure that runoff water is not polluted with nitrates, oils, sediment and other deleterious materials that could harm receiving waters. The general concept is to retain the initial flush of runoff to allow such matter to settle out or percolate into the ground, rather than discharging the matter into downstream waterways. One method recommended is to provide orifice plates at a headwall to detain a certain volume of runoff, ( a -water quality capture Volume, or WOCIA, discharging it slowly over 40 hours. A problem arises when the release rate is very small, (slow),- resulting in quite small orifice perforations that are susceptible to clogging. Structured Engineering has chosen to utilize a rectangular weir of comparable discharge rate lieu of individual circular orifices. It is expected that such a weir will will perform the same function as the orifice plate with less likliehood of clogging completely. Therefore, prior to leaving the site, runoff quality will be improved with temporary detention behind a WQCV weir. The clarified runoff will be released over a 40hr time period through the calibrated weir. A 9.98 cfs 100yr release rate will pass over the WQCV weir and cross Hemlock Street in the drain pan designed and constructed during Phase 1 to pass 9.98 cfs. Runoff then will sheet flow to the Poudre River across the Salyer Open Space in an existing 150' wide drainage easement. The difference between the 9.98 cfs originally expected and the 13.51 cfs now anticipated due to the proposed development will be detained on site. A total of 4872 cubic feet of runoff will be detained, with a high water surface elevation of 4973.83. The new building is to be located in a presently undeveloped portion of the ' site. There are about a half dozen mature trees on this portion of the site... large diameter poplars. The remainding vegetation consists of local, native grasses or bare ground. tA public concrete bike/pedestrian trail borders the site along the west side (offsite), and the Union Pacific railroad tracks are along the east side. Hemlock ' Street forms the south boundary, and Hickory Street the north. The proposed building, (approximately 80' x 250'), will be about 20' north of the south PL and about 78' from the west property line. Existing lot grading is at approximately .4% slope, generally from the north to the south. Hickory Street is paved and has vertical curb and gutter. Hemlock Street along the south property line is gravel now and will remain so. No street access is going to be provided to or from Hemlock Street as part of these improvements. There is a concrete cross pan across Hemlock Street near the southwest corner of the building site. This pan was designed and constructed as part of Phase 1 to pass 9.98 cfs, anticipating Levons 2nd development. There are no pronounced natural drainage features on or adjacent to the site except for an existing swale that parallels the UP railroad tracks. The soils group making up the site is primarily clay loam according to the Larimer County Soils Survey by the Soil Conservation Service. A soils report prepared by Earth Engineering Consultants April 5, 1996 (EEC Project No. 1962025) for the first building more specifically defines the on -site material as a sand and gravel granular material. A. Design Criteria The City of Fort Collins has prepared a Storm Drainage Design Criteria and ' Construction Standards (SDDC) which provides the basis for the analysis used in predicting storm runoff and the recommended drainage improvements. The latest precipitation rates have been used. B. Hydrology ' The Rational Method is used to predict the amount of peak runoff. The 100-year return frequency was used in this report to predict major peak ' discharges, and the 10-year storm is analyzed as the minor storm. C. Conformance With Existing Master Drainage Plans rThe FIRM Flood Insurance Rate Map prepared by FEMA ( Community Panel Number 08012-004-C, revised March 18, 1996) was consulted to determine flood ' plain boundaries in the area. The flood plains are indicated on sheet 3 of the I FINAL STORM DRAINAGE and EROSION CONTROL REPORT for Levon's 2nd Warehouse and Office Building May 7, 2001 INTRODUCTION A second warehouse - office building is proposed for construction on a 3.36 acre (gross, 3.29 acres net after street R.O.W. dedications), parcel zoned CN, Commercial - North College, in the 300 block of West Hickory Street. The parcel ' is just west of Union Pacific railroad tracks, south of Hickory Street and north of Hemlock Street. There is an existing 14,700sf warehouse on the property. This report sums up the analysis that was undertaken to determine what impacts the construction of a proposed new 20,000sf speculative warehouse will have on current drainage patterns in the area. This report addresses the following: 1 .Site Descriptions 2.Storm Drainage A. Design Criteria B. Hydrology C. Conformance With Existing Master Drainage Plans D. Proposed Drainage Improvements 3.Erosion Control A. Erosion Control Measures It is intended that the recommendations found in this report become an integral part of the design documents and construction of the project. The property is described as "a parcel of land being a portion of Block 15, the vacated alley therein, vacated Fourth Street and vacated Fourth Avenue, in Riverside Park of the City of Fort Collins, and other property in the SE 1 /4 of Section 2, Township 7 North, Range 69 West of the 6th Principal Meridian, in Larimer County, Colorado". The parcel is being re -platted as "First Replat of Levon's Minor Subdivision". - Aeuw p \ Butt[ a \ \r Co. e \ d � \ "'Ohland COLLINS v � 4 4 i \�z dh ehn P COima Re. _ Y%loo ,� • ; • e RADO �z a • : o^°Oos _ Oe Country \\ y N D iDD� OOO JANUARY I, 1993 `- p".iel.e e " J � o _ \ La \ItOr s nu low � ° ° $ BrammeMn sl en Gti Yo pure..'• 'A Or � Y P[laarm. a ' I � 1] Ouoil Run t \ \ I \ Nip Brat lec One ¢ �c II 1 r�S \ I \ CI Cif \ •� , � e '' \m �Cc �j a ° > st sr w Nieter so _� a IL ,iv \ c0milv� St a4 I 9r �Y ,`�N � Pinon St Y t ¢ tMm Ln Lancer ¢nl ' � _ i Ip = \ aq So?A J � m _ W. Vine � na� _ awl E. Vlne DriYe ' a Im St w Eim SI C ca.20 SY looker S1 b St CMn St Chen` fSt '. u St \ Bunco ♦m SI Ar \ _ ca Eallln L w Ya �y elVTpine DI ww Ma IO m w� .< < E v S•t _ an� r.. t w e • Y •\ Lan �Lejdon e' m�J < � uni er h � e ; w�; a E a en �. z v u Wand r< 3 $ 't T e` T ° 1 = 1 Y♦ ei\\ 9% Ct La P01 Ave $ - s Z ^ P • a° \\ Grand.,*. Cemetery � \ v < a ° ' w e LL 'na.m ` c m P` c � _ a y Mevnleia bw n �. a:' i 2 ai I °e E. Lincoln Ave, ' �a '+ \ 5 w W AreT Trine'd-1 ( d ` MOYnI ♦Y[ yn \\ l In I E, MOYn(Oln AYI. Ku nieippl' ♦ w. Oak St. < � W u ae St \ Aem rgr sue • � I E \\ Go// Cooree S ,t w 011re SI < e P I 4 \\ , v S W ford _ Ave e Y < C Y E. Olive St. _ \\ Pe drr \ w e Ma n Ilay S1. ♦ e ,p E n w I E Ma nolia Sr. I \ 1•i1S:i��' � m a � 'U T � v t • A �tro E er�cle. w. Yulperry stm r w J w w eCie (" u' E Mulpen so =�•^o • ':Hide a M.rnloE h arkel Yi Yi w' \� _ Z cfetm«ea . racne�e.rYn. wn „ _ : mrtor 3 ?�e 0 W. M ft [ st E. Myrtle St _ m \ Ct t D P pt C\ B.'eh SI • oQ c N m N e I N w w \\ 8roa i 1e PL F/N';Bays \ _ N ne 3 Or W' Laurel St / e I E ` E. Launl St. C O u w \ \ a Y m ' s m e a DA Old n MarkE11. E. Mark St. . r a Nortn Dr ..: Y Or r _ O Ct, s Ct' \ J -- a 1.10 • 0r ri L°outl Sr. Nenro - rP, . Ot neu W. EL,rapeln r SI. EI"[lopetn qtw [ E E :"read[' Ct �Ct I n r a o tl nwe.ai A T� Garfield $1 s ` tr ', i SourE Dr a I e r 8( d �. 01 <�ii �> w _.e Or. a SRnn _'•.. • _ ' I Lete wood Dr e+ _ ._ � E � _ � E �' May 7, 2001 Structured Engineering 318 East Oak Street Fort Collins, CO 80524 Phone (970)-495-0810 Fax (970)-224-1314 May 7, 2001 Mr. Basil Hamden Stormwater Utility City of Fort Collins PO Box 580 Fort Collins, Colorado 80522 Dear Basil, Attached is the final Final Storm Drainage Report that accompanies the construction of a second warehouse and office building to be located in the Poudre River drainage basin in the 300 block of West Hickory Street in north Fort Collins. The project is titled Lemon's 2nd Warehouse and Office Building. The report is in essence a continuation of , or, a modification to, the previous Final Storm Drainage and Erosion Control Report for Levon's Warehouse and Office Building, dated March 16, 1996, revised December 11, 1996, and approved by the City of Fort ' Collins January 3, 1997. The development now proposed is on the same site analyzed in the earlier report. The earlier report anticipated this second building would be built at some time, and anticipated all site drainage would leave at the southwest corner of the site and sheetflow across a Salyer Open Space drainage easement obtained then from the City of Fort Collins. Proposed drainage improvements as part of this 2nd development closely follow the intent and assumptions of the drainage plan prepared for the first development.. As part of water discharge quality requirements imposed on new developments since the time the first development was approved, detention will be provided on -site with appropriate grading and a Water Quality Capture Volume (WGCV) weir structure and in the southwest corner of the site. The WQCV has been provided only for the portion of the site proposed to be developed now, after WQCV requirements were enacted. All design is in conformance with the latest edition of the City of Fort Collins' Storm Drainage Design Criteria and Construction. Standards and.uses the -latest precipitation -- -- rates. All Stormwater Utility comments from earlier submittals have been addressed herein., Josepb(P. Man Structured Eng FINAL STORM DRAINAGE and EROSION CONTROL REPORT LEVON'S 2nd WAREHOUSE AND OFFICE BUILDING 300 BLOCK OF WEST HICKORY STREET CITY OF FORT COLLINS, CO May 7, 2001 Prepared For: Charles Meserlian North College Avenue Fort Collins, CO 80521 (970) 221-0700 Prepared By: Structured Engineering 318 East Oak Street Fort Collins, Colorado, 80524 Phone (970) 495-0810 Fax (970) 224-1314