City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Harvest Park Major Amendment and Replat, File No. 25-98G
Administrative Hearing Date: January 27, 2003
Page 7
DECISION
The Hearing Officer hereby approves the Harvest Park Major Amendment and Replat,
Case No. 25-98G.
DATED this 10th day of February 2003.
4�' A hcGt-o''
Linda C. Michow, Hearing Officer
L CM\57069.24\434277.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Harvest Park Major Amendment and Replat, File No. 25-98G
Administrative Hearing Date: January 27, 2003
Page 6
collector. The Project and the overall Harvest Park PDP will accomplish the
connection of Rock Creek Drive between Ziegler Road and Corbitt Drive on the east
side of the PDP and Stetson Creek to the west of the of the PDP.
Section 3.6.2, concerning streets, streetscapes, alleys, and easements, provides
that designs for private streets shall meet all standards for public streets in
accordance with the Larimer County Urban Area Street Standards. The Project's
private drives, according to the staff report, comply with these standards. There was
no evidence presented at the hearing to contradict this determination.
FINDINGS OF FACT
A. The Harvest Park Major Amendment and Replat complies with Section 2.2.10
concerning Major Amendments to Project Development Plans.
B. The Harvest Park Major Amendment and Replat proposes a permitted use within the
LMN Zone District.
C. The Harvest Park Major Amendment and Replat will not increase the density of the
Harvest Park PDP in excess of the maximum permitted within the LMN Zone District.
D. The Project complies with the applicable general development standards of Article 3
of the Land Use Code.
E. The Harvest Park Major Amendment and Replat complies with all applicable district
standards of Division 4.4 of the Land Use Code, Low Density Mixed Use
Neighborhood (LMN) zone district.
LC M\57069.24\434277.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Harvest Park Major Amendment and Replat, File No. 25-98G
Administrative Hearing Date: January 27, 2003
Page 5
Since there was no evidence introduced at the hearing to contradict the staff report
or the evidence presented at the hearing, the Hearing Officer finds that the Project is
in conformance with Section 3.2.2.
Engineering Standards. The staff report indicates the Project's general
conformance with Division 3.3 concerning engineering standards. Specifically, the
unrefuted evidence presented at the hearing reflects that the Project complies with
the City's plat standards (Section 3.3.1) and with development improvement
standards found in Section 3.3.2. Specifically, the Plat standards require that
proposed developments enhance an interconnected street system within and
between neighborhoods. The Project conforms to this standard in that it connects
via Rock Creek Drive to the adjoining neighborhoods of Stetson Creek and Timber
Creek. Although the testimony of certain residents reflected their opposition to this
connection, the Hearing Officer finds, based on the evidence presented, that the
connection of Rock Creek Drive was planned at the inception of the Stetson Creek
PUD and that this interconnectivity carries out the requirements of the LUC.
Water Hazards. According to the staff report, the City's stormwater department has
determined that the Project satisfies Section 3.3.3 concerning water hazards. There
was no contradictory evidence presented at the hearing; therefore the Hearing
Officer finds that the Project complies with Section 3.3.3 of the LUC.
Building and Project Compatibility. Subsection 3.5.1 of the LUC requires that
new developments be designed to be compatible with the established architectural
character of the area. Pursuant to this section, compatibility is achieved through
similar pitched roof forms, fenestration and similar building materials. The staff
report indicates that the existing elevations for 4 and 5 plex units in Harvest Park will
apply to the proposed town homes.
The Hearing Officer finds, therefore, that the Project is compatible with the
surrounding neighborhoods in terms of architectural character and project
compatibility.
Transportation and Circulation (Traffic). Section 3.6 of the LUC imposes
standards for Master Street Plan compliance, providing that "all development plans
shall provide for or accommodate the streets and transportation facilities identified
on the Master Street Plan". The Staff report indicates that the Project complies with
the City's Master Street Plan in that the Plan identifies Rock Creek Drive as a
LC M\57069.24\434277.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Harvest Park Major Amendment and Replat, File No. 25-98G
Administrative Hearing Date: January 27, 2003
Page 4
Access. Circulation and Parking. The staff report outlines the Project's
conformance with Section 3.2.2 concerning access, circulation and parking.
Specifically, the staff report notes that the design of the Project provides for:
(1) on -site access to pedestrian destinations; and
(2) curb ramps to allow sidewalk access to Harmony Park to the north of the
PDP site and other neighborhood sidewalks in all other directions.
The staff report also states that there will be no traffic impact with the change in land
use. The table set forth on page 4 of the staff report shows that the difference in trip
generation between the originally approved 18 single family detached dwelling units
and the proposed 29 town home units is negligible. In fact, as the table shows, the
proposed town homes will generate less trips per day (170 trips per 24 hour volume)
than the single family detached dwellings (172 trips per 24 hour volume). The City
traffic engineer testified that despite the increase in density of this Project, studies
published by the Institute of Transportation Engineers Trip Generation Handbook
indicate that town homes and other attached dwelling units generate less traffic than
single family detached units. The number of trips generated by single family
detached dwellers are documented to be higher than town home dwellers because
with more square footage of living space comes additional family members,
including children, who require more car trips.
The residents residing in the adjacent subdivisions of Timber Creek and Stetson
Creek testified about increased traffic, lack of stop signs, and high speeds through
their neighborhoods. Certain residents were concerned that this proposal would
exacerbate the existing traffic problems and questioned the logic of the conclusion
that 29 units would generate less traffic than 18 single family homes. The traffic
engineer addressed the residents' concerns by stating that the City will examine the
need for additional stop signs at Snow Mesa and Sawmill intersections. The
applicant and traffic engineer further testified that the use of roundabouts through
Harvest Park is a traffic -calming device that would slow traffic. The testimony of the
traffic engineer also reflects that Rock Creek, Stetson Creek and Timber Creek
Drives are collector streets designed to carry a substantial number (ie., 3500) of cars
per day. Regarding the concern for additional traffic from this Project, the Hearing
Officer finds that the conclusions of the traffic engineer, based on national studies
published by the Institute of Transportation Engineers Trip Generation Handbook, is
supported by the evidence.
LC M\57069.24\434277.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Harvest Park Major Amendment and Replat, File No. 25-98G
Administrative Hearing Date: January 27, 2003
Page 3
The staff report indicates that the residential use for single family attached dwellings
is permitted within the LMN zone district. No evidence presented at the hearing
contradicted this finding.
Therefore, the Hearing Officer concludes that the proposed uses are permitted
within the LMN zone district.
3. Compliance with LMN District Standards (Article 4):
Land Use Standards. Based on the evidence presented at the hearing, the Project
complies with Section 4.4 and the Land Use Standards of the LMN Zone District.
Specifically, Section 4.4(D) of the LUC requires that residential developments in the
LMN District have an overall minimum average density of five (5) dwelling units per
net acre of residential land. The staff report and testimony at the hearing indicates
that with the proposed amendment, the overall density of the entire Harvest Park
PDP would increase from a net density of 5.08 dwelling units per net acre of
residential land to a net density of 5.2 dwelling units per net acre. The total number
of units within Harvest Park PDP would, as a result of the major amendment,
increase from 470 to 481 dwelling units.
The Hearing Officer also notes that the Project serves the purposes of the LMN
District in that it provides a "wide range of needs of everyday living in neighborhoods
that include a variety of housing choices..."
Development Standards. The staff report and testimony presented at the public
hearing indicates that the PDP, as amended, is in compliance with section 4.4(E) in
that each block is smaller than 12 acres in size.
3. Compliance with Article 3 — General Development Standards: The evidence
presented at the hearing establishes that the PDP, as amended, complies with all of
the applicable requirements of Article 3, as explained below.
Landscaping and Tree Protection. The staff report outlines the PDP's
conformance with Section 3.2.1 concerning landscaping and tree protection and
there was no evidence introduced at the hearing to contradict the staff report.
LC M\57069.24\434277.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Harvest Park Major Amendment and Replat, File No. 25-98G
Administrative Hearing Date: January 27, 2003
Page 2
RECORD OF HEARING: The Hearing Officer accepted during the hearing the
following evidence: (1) Planning Department staff report; (2) application, plans, maps,
reports and other supporting documents submitted by the Applicant and the Applicant's
agents to the City of Fort Collins; (3) written correspondence from members of the
public concerning the Project; (4) photographs taken of the Project; and (5) a tape
recording of testimony provided during the hearing. The Fort Collins Land Use Code
("LUC"), the City's Comprehensive Plan, and the formally promulgated policies of the
City are all considered part of the evidence considered by the Hearing Officer.
FACTS AND FINDINGS
1. The Harvest Park Major Amendment and Replat conforms with the
requirements set forth in Section 2.2.10(B) concerning Major Amendments to
Project Development Plans: The staff report identifies the Project as a major,
rather than a minor, amendment to the existing Project Development Plan because it
proposes to increase the density by approximately 2.5%, which exceeds the
maximum 1 % density increase for minor amendments. This Project has been
processed according to the standards in Article 2 of the LUC in that it is subject to
Type I administrative review.
2. The Project's Proposed Use for Single -Family Attached Dwellings Is a
Permitted Use within the Low Density Mixed Use Neighborhood (LMN) Zone
District: The staff report reveals that the proposed development is adjacent to the
following surrounding zoning and land uses:
N: RL; Harmony Park, Traut Elementary School, existing single-family
attached residential north of the school.
NW: RL; Preston Junior High School, existing Wild Wood Farm single family
neighborhood,
S: LMN; Rock Creek Drive, undeveloped portions of the Harvest Park
PDP development, Sage Creek development (under construction),
W: RL; existing Stetson Creek and Timber Creek single-family residential
neighborhoods.
E: LMN; existing and under construction portions of the Harvest Park
development.
L C M \5706 9.24\434277.01
City of Fort Collins
Community Planning and Environmental Services
Current Planning
CITY OF FORT COLLINS, COLORADO
ADMINISTRATIVE HEARING OFFICER
TYPE 1 ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS, AND DECISION
ADMINISTRATIVE HEARING DATE:
PROJECT NAME:
APPLICANT:
OWNER:
HEARING OFFICER:
January 27, 2003
Harvest Park Major Amendment & Replat —
File No. 25-98G
Terence Hoaglund
Vignette Studios
144 N. Mason Street, Suite 2
Fort Collins, Colorado 80524
The Writer Corporation
6061 S. Willow Drive, Suite 232
Englewood, Colorado 80111
Linda C. Michow, Esq.
Gorsuch Kirgis LLP
Tower I, Suite 1000
1515 Arapahoe Street
Denver, Colorado 80202
PROJECT DESCRIPTION: The Applicant has submitted an application for a major
amendment to the approved Harvest Park Project Development Plan ("PDP") in order to
change the density of block 2 from 18 single family detached lots to 29 single family
attached lots. The proposed request also includes a replat of block 2 of Harvest Park
PDP to reconfigure the lots to accommodate the increase in density. The major
amendment and replat shall be referred to herein, collectively, as the "Project."
SUMMARY OF HEARING OFFICER DECISION: Approval.
ZONE DISTRICT: Low Density Mixed Use Neighborhood (LMN).
NOTICE OF PUBLIC HEARING AND NEIGHBORHOOD MEETING: Evidence
presented to the Hearing Officer established that the hearing was properly noticed in
accordance with the City of Fort Collins Land Use Code. City planning staff also held a
neighborhood meeting on April 30, 2002.
PUBLIC HEARING: The Hearing Officer, presiding pursuant to the Fort Collins Land
Use Code, opened the hearing at approximately 6:00 p.m. on January 27, 2003 in the
City administrative offices located at 300 West LaPorte Avenue, Fort Collins, Colorado.
LCM\57069.24\ 434277.01
281 :North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020