HomeMy WebLinkAboutHARVEST PARK - MAJOR AMENDMENT & REPLAT - 25-98G - CORRESPONDENCE - REVISIONS (3)Project Comments Sheet
ENC
Selected Departments
Citv of Fort Collins
Department: Stormwater Utility
Date: July 19, 2002
Project: HARVEST PARK MAJOR AMENDMENT AND REPLAT
All comments must be received by TROY JONES in Current Planning no later than
the staff review meeting:
July 17, 2002
Note - Please identify your redlines for future reference
Issue Contact: Basil Harridan
Topic: Ersosion and Sediment Control
8
July 16, 2002
1. If the erosion control for this site is to be handled by the same BMP's approved for the original Harvest Park
Submittal, this should in some manner be made clear on the erosion control plan, with references to the sheet(s) of the
original report and drawings that apply. 1.
2. Standard City erosion control notes must be on the plan.
Topic: Grading
10
Please provide alley cross -sections as well as cross-section for the proposed swale and trickle pans. The trickle pan
used for landscaped areas should be with the raised lips. Provide also a detail for the concrete pans across the alleys.
Topic: Notes
22
Please correct the notes to reflect the City of Fort Collins as being the "Local Entity' and requiring drainage certification
prior to any Certificate of Occupancy.
Topic: Utility Plan
21
The utility plan legend shows the same symbol is being used by the sanitary line and the subdrain line, please
differentiate these two, and call -out the subdrain line on the plan view.
a
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
at tte Drainage Report Other_
v Iy edline Utility Landscape
Page ]
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
You s Trul ,
TRO JOf ES
City PI nner
Page 5
8
July 16, 2002
1. If the erosion control for this site is to be handled by the same BMP's approved for the
original Harvest Park Submittal, this should in some manner be made clear on the erosion
control plan, with references to the sheet(s) of the original report and drawings that apply.
2. Standard City erosion control notes must be on the plan.
Topic: Grading
/ ,10
Please provide alley cross -sections as well as cross-section for the proposed swale and trickle pans.
The trickle pan detail for the landscaped areas should be for a pan with raised lips on the sides.
Provide also a detail for the concrete pans across the alleys.
Topic: Notes
/22
Please correct the notes to reflect the City of Fort Collins as being the "Local Entity" and requiring
drainage certification prior to any Certificate of Occupancy.
Topic: Utility Plan
21
The utility plan legend shows the same symbol is being used by the sanitary line and the subdrain
line, please differentiate these two, and call -out the subdrain line on the plan view.
Department: Transportation Planning Issue Contact: Mark Jackson
Topic: General
11
Could internal e/w sidewalks be extended to allow for better pedestrian cross -access mid -block? It
doesn't look to be a lot of extra length and would make for a better internal ped system. Please see
redline comment.
Department: Water Wastewater
Topic: General
7
No Comments
Department: Zoning
Topic: General
1
Please verify the name of the street down the center
Lane
Issue Contact: Jeff Hill
Issue Contact: Jenny Nuckols
is it Cotton Eyed Joe Ln or Amber Harvest
2
Lot numbers on the plat don't coincide with numbers on site plan. Can't have 2 lots with the same lot
number in the same filing and block
3
Each lot should have its own address
Be sure and return all of your redlined plans when you re -submit.
Page 4
29
Coordinate access ramps, street name, and other pertinent comments on the utility plan with the site
and landscape plans.
32
Light and Power has required that no sidewalk or street trees should be installed on the streets
surrounding this project in advance of this development, coordination should occur regarding the
construction of these surrounding streets to ensure this does not take place.
Topic: Plat
9
The plat contains outdated plat language as well as incorrect Engineering and Planning Approval
(- Blocks. Please revise.
�)3
The plat seems to not be a full replat of the previous based upon a sliver of land that is created
behind Harvest Park Lane right-of-way, most noticeable west of Cotton Eyed Joe Lane; why is this
area being created?
,14
Separate Blocks need to be indicated on the east and west side of Cotton Eyed Joe Lane if the
intention is to use the same lot numbers.
;15
,Tract C should be Tract A, assuming different block numbers are used.
Topic: Street Design
r18
Show the sidewalk along the public street and access ramps intersecting with Harvest Park Lane and
,,Rock Creek Drive as proposed rather than existing in linetype.
1'9
Provide additional spot elevations at the intersection of the public street with Harvest Park Lane and
Rock Creek Drive in accordance with 7-32A (to show that the public street ties into the existing
streets.)
24
The flowline designs appear to be consistent on both sides of the street. However, based upon the
elevation at the centerline for the two transition points, cross slope calculations from the crown to the
eastern flowline appears to exceed 3% at both transition points. Cross slope should be between 2
and 3%. [As general notice to the design engineer: Future submittals to the City on new projects (not
this project) will require centerline flowlines in addition to left and right flowlines on all public streets.
Also, stationing is required to be centerline stationing, not flowline stationing.]
30
The variance request submitted on June 14th, 2002 from Sear -Brown regarding street separation
requirements was granted by the City Engineer and Traffic Engineer. No further written follow up
indicating this will be made unless requested. Note that all future variance requests to City
engineering design standards should be signed and stamped.
Topic: Utility Plan
17
' The southern most private drive leading out to Cotton Eyed Joe Lane exceeds the 500 square feet of
sheet flow allowed to drain over a public sidewalk.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
VIGNETTE STUDIOS Date: 07/25/2002
C/O TERENCE HOAGLUND
144 N. MASON ST., SUITE 2
FORT COLLINS, CO 80524
Staff has reviewed your submittal for HARVEST PARK MAJOR AMENDMENT AND
REPLAT, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Troy Jones
Topic: General
33
Coordinate the timing of street tree installation, sodding of the parkway, installation of irrigation linbs
in parkway until after trenching and installation of electric service lines are complete.
34
Please see the attached notes from the neighborhood meeting.
35
Replace the "Planning and Zoning Board" signature block from the plat and replace it with the
"Director of Planning" signature block.
36
Add a Notary certification to the owner's certification on the site plan.
37
Please be sure to see the hand written comment sheets from Technical Services, Excel[ Energy, and
Fort Collins Loveland Water District & South FC Sanitation District.
Department: Engineering Issue Contact: Marc Virata
Topic: General
5
Please be consistent on the name of the public street proposed. In dicsussion with PFA and
Technical Services, Amber Harvest Lane should not be used because of the existing name to the
south and it is not viewed as a continuation of the existing street. Also, while the origins of the phrase
"Cotton Eyed Joe" is perhaps not entirely known and is open to interpretation, the phrase could
perhaps be viewed as offensive to some. It is suggested that if this is the street name is being
proposed, that it be changed.
6
An update to the subdrain report by Ayres and Associates should be submitted reflecting the changes
to the development.
12
Revise the utility plan description area (not part of Fairway Estates.)
16
.The access ramps across Cotton Eyed Joe Lane should be directional east -west only, not leading to
the corners of the intersections.
Page 1
Basil Hamdan
We have refered to the original set of plans.
10 We have provided the requested cross sections and referenced the details on the
detail sheet.
22 We have changed the notes
21 We have changed the line type
RESPONSE TO COMMENTS
Marc Virata
General
5 Cotton Eyed Joe Lane has been changed to Fruited.Plain Lane.
6 This will be provided with the FCP.
12 We have revised the description.
16 We have changed the Access Ramps.
29 See Site Plan comment responses.
32 Comment is noted.
Plat
9 We have revised the language.
13 We have indicated separate Blocks.
14 Tract C is correct, we have changed the line type to make this clear.
Street Design
18
19 We have Provided additional Spot Elevations.
24 We have provided the additional spots and lengthened the transition so cross
slopes are with in code.
Utility Plan
17 We have regraded this to meet the 500 sq. ft. requirement.
25 We have added the District Signature Blocks.
26 We have shaded the 4`h filing on the revised plan to make in more clear.
27 This can be discussed.