Loading...
HomeMy WebLinkAboutHARVEST PARK SUBDIVISION, 5TH FILING - REPLAT OF BLOCKS 3 & 4 - 25-98H - SUBMITTAL DOCUMENTS - ROUND 1 -Small Project Development Review Fee Schedule (All applications mush include .50 cents for each APO label in addition to the review fee) TYPE OF PROJECT Structural additions or alterations or change of use to single family, two family, multi -family (up to 4 units) dwellings. Conversions from one use to another use if the proposed conversion will not add more than 25% of new habitable floor area to the existing building or eliminate more than 10% of existing habitable floor area. than $500,000.00 building permit valuation. New residential development of 15 or less dwelling units. than $500,000.00 of building permit valuation. petition of 5 acres or less. of 5 acres or less. FEE per project. 1 % of building permit valuation (112% of building permit valuation if submitted as combined PDP/Final or Preliminary/Final PUD). PDP, preliminary subdivision or preliminary PUD, $100.00 per dwelling unit. Final or final subdivision or final PUD; $100.00 per dwelling unit. Applications submitted as combined PDP/Final or combined Preliminary /Final PUD; $100.00 per dwelling unit. 1 % of building permit valuation. (1/2% of building permit valuation if submitted as combined PDP/Final or Preliminary/Final PUD). % of regular fee These fees are subject to change. COMMENTS Fee collected at project submittal. Minimum fee = $200.00 / of estimated building permit valuation collected at project submittal. Remaining''/2% collected at time building permit is issued. Adjustments made at time building permit is issued. Applications submitted as combined PDP and Final or combined preliminary/final PUD shall be charged /s% of building permit valuation as total fee. This''/z% will be collected when application is submitted with final adjustments made at time building permit is issued. Minimum fee at PDP, preliminary PUD, Final or Final PUD = $200.00. Minimum fee = $200,00 '/z of the estimated building permit valuation collected at project submittal. Remaining'/2% collected at time building permit is issued. Applications submitted as combined PDP/Final or combined PUD shall be charged'/2% of building permit valuation as total fee. This''/2% will be collected when application is submitted with final adjustments made at time building