HomeMy WebLinkAboutHARVEST PARK SUBDIVISION, 5TH FILING - REPLAT OF BLOCKS 3 & 4 - 25-98H - SUBMITTAL DOCUMENTS - ROUND 1 -Small Project Development Review
Fee Schedule
(All applications mush include .50 cents for each APO label in addition to the review fee)
TYPE OF PROJECT
Structural additions or alterations or
change of use to single family, two
family, multi -family (up to 4 units)
dwellings.
Conversions from one use to another
use if the proposed conversion will not
add more than 25% of new habitable
floor area to the existing building or
eliminate more than 10% of existing
habitable floor area.
than $500,000.00 building permit
valuation.
New residential development of 15 or
less dwelling units.
than $500,000.00 of building permit
valuation.
petition of 5 acres or less.
of 5 acres or less.
FEE
per project.
1 % of building permit valuation
(112% of building permit valuation if
submitted as combined PDP/Final or
Preliminary/Final PUD).
PDP, preliminary subdivision or
preliminary PUD, $100.00 per dwelling
unit.
Final or final subdivision or final PUD;
$100.00 per dwelling unit.
Applications submitted as combined
PDP/Final or combined Preliminary
/Final PUD; $100.00 per dwelling unit.
1 % of building permit valuation.
(1/2% of building permit valuation if
submitted as combined PDP/Final or
Preliminary/Final PUD).
% of regular fee
These fees are subject to change.
COMMENTS
Fee collected at project submittal.
Minimum fee = $200.00
/ of estimated building permit
valuation collected at project submittal.
Remaining''/2% collected at time
building permit is issued. Adjustments
made at time building permit is issued.
Applications submitted as combined
PDP and Final or combined
preliminary/final PUD shall be charged
/s% of building permit valuation as total
fee. This''/z% will be collected when
application is submitted with final
adjustments made at time building
permit is issued.
Minimum fee at PDP, preliminary PUD,
Final or Final PUD = $200.00.
Minimum fee = $200,00
'/z of the estimated building permit
valuation collected at project submittal.
Remaining'/2% collected at time
building permit is issued. Applications
submitted as combined PDP/Final or
combined PUD shall be charged'/2% of
building permit valuation as total fee.
This''/2% will be collected when
application is submitted with final
adjustments made at time building