HomeMy WebLinkAboutHARVEST PARK - FDP - 25-98D - CORRESPONDENCE -.1
facilitate the complete re -submittal of the application with. supplemental materials, please have
your project manager contact Ginger Dodge and/or Voneen Macklin of the Current Planning
Department at 970.221.6750.
Please contact me at 970.221.6750 and/or e-mail: rfuchs(a)ci.fort-collins.co.us if you should have
any questions related to these comments and to schedule a meeting to discuss the Harvest Park
Final Compliance comments.
Since/rely,
Ronald G. Fuchs '
Project Planner
cc: Engineering
Stormwater
WaterMastewater
Zoning
Natural Resources
Transportation Planning
Traffic Operations
Poudre Fire Authority
Light and Power
Project File #25-98C
22. Planning: provides the following:
a. The street tree placement does not meet, in some cases, the spacing requirements as
set forth in Section 3.2.1(D)(2)(a) of the LUC. The requirement is that they be spaced at
30' — 40' and there are places where the trees are about 50' apart, some are 42± and in
another area they measure 75'.
b. Maximum height of all fencing is six (6) feet per Section 3.8.11(3)(c). The fence detail on
sheet 10 of 23 needs to be revised on the plan set to meet code.
c. Please clean the street layer designation of Autumn Harvest Way on sheet 6 of 23.
d. Label street names for all streets on the context diagram on sheet 2 of 23.
e. Please clarify and/or would it be possible to remove the crosshatching contained within
the private drive and fire lane designation of Block 8 on sheet 3 of 23.
f. Coordinate all easements, open areas, street, sidewalk and pedestrian crossings through
out the development with Natural Resources, Stormwater, Traffic Operations,
Engineering, Transportation Planning Services and other affected departments and
outside reviewing agencies.
g. The. City's Planning signature block on the Subdivision Plat should be titled
"DIRECTOR OF PLANNING" and the statement should read:
Approved by the Director of Planning of the City of Fort Collins, Colorado, this
day of 1200. _
Director of Planning
h. All certification blocks on the subdivision plat shall be consistent with the language
required by the City of Fort Collins.
The applicant/developer shall coordinate all emergency and utility infrastructure needs to .
ensure that all infrastructure provisions are fully met.
j. The applicant/developer shall coordinate with the Fort Collins — Loveland Water District
and South Fort Collins Sanitation District their infrastructure needs..
k. The plan sets shall be in substantial conformance with all Land Use Code standards and
criteria as conditioned and approved by the Hearings Officer.
I. At least one more round of review for the Final Compliance plans is required
before the plans could be signed and filed.
Additional comments will be forthcoming as they are reviewed and received from City
departments and from outside reviewing agencies.
Please return all drawings red -lined by City staff with submission of your revisions. Please see
the attached Revisions Routing Sheet for the number of copies of revisions to submit. To
Commun..y Planning and Environmental IS vices
Current Planning
City of Fort Collins
March 8, 2000
Mr. Dino DiTullio
Everitt Companies
3030 South College
Fort Collins, CO 80525
RE: Harvest Park - F.inal Compliance
Dear Mr. DiTullio:
Staff has reviewed your documentation dated PDP 1/25/00 for the Harvest Park - Final
Compliance that were routed through the City on January 27, 2000 and February 17, 2000 and
would like to offer the following comments:
1. Natural Resources: submitted a response that is attached to this document.
2. Engineering: comments received are attached to this letter.
3. Traffic Operations: two comment sheets forwarded with this letter.
4. Engineering Pavement: submitted a response that is attached to this document.
5.. Transfort: submitted a response.to the checklist and it is attached to this report.
6. Poudre Fire Authority: two comment sheets are attached with this letter and another
comment sheet was forwarded on February 15, 2000.
7. Water/Wastewater: their response sheets are attached to this report.
8. Mapping/Drafting: submitted a,response to the checklist and it is attached to this report.
9. Transportation Planning: submitted a response that is attached to this document.
10. Park Planning: a comment sheet is attached to this letter and another comment sheet was
forwarded on February 15, 2000.
11. Light and Power: a comment sheet is attached to this letter and another comment sheet
was forwarded on February 15, 2000.
12. Public Service: a comment sheet is attached to this letter and a comment sheet was
forwarded on February 15, 2000.
13. CDOT: submitted a response to the checklist and it is attached to this report.
14. Forestry: a comment sheet was forwarded on February 15, 2000.
15. Fort Collins - Loveland Water District and South Fort Collins Sanitation District: a
comment letter forwarded on February 15, 2000.
16. AT&T Digital: a comment sheet was forwarded on February 15, 2000.
17. Post Office: a comment sheet was forwarded on February 15, 2000.
18. Streets: a comment sheet was forwarded on February 15, 2000.
19. Zoning: a comment sheet was forwarded on February 15, 2000.
20. Building Inspection: a comment sheet was forwarded on February 15, 2000.
21. Water Conservation: a comment sheet was forwarded on February 15, 2000.