Loading...
HomeMy WebLinkAboutHARVEST PARK - FDP - 25-98D - CORRESPONDENCE -.1 facilitate the complete re -submittal of the application with. supplemental materials, please have your project manager contact Ginger Dodge and/or Voneen Macklin of the Current Planning Department at 970.221.6750. Please contact me at 970.221.6750 and/or e-mail: rfuchs(a)ci.fort-collins.co.us if you should have any questions related to these comments and to schedule a meeting to discuss the Harvest Park Final Compliance comments. Since/rely, Ronald G. Fuchs ' Project Planner cc: Engineering Stormwater WaterMastewater Zoning Natural Resources Transportation Planning Traffic Operations Poudre Fire Authority Light and Power Project File #25-98C 22. Planning: provides the following: a. The street tree placement does not meet, in some cases, the spacing requirements as set forth in Section 3.2.1(D)(2)(a) of the LUC. The requirement is that they be spaced at 30' — 40' and there are places where the trees are about 50' apart, some are 42± and in another area they measure 75'. b. Maximum height of all fencing is six (6) feet per Section 3.8.11(3)(c). The fence detail on sheet 10 of 23 needs to be revised on the plan set to meet code. c. Please clean the street layer designation of Autumn Harvest Way on sheet 6 of 23. d. Label street names for all streets on the context diagram on sheet 2 of 23. e. Please clarify and/or would it be possible to remove the crosshatching contained within the private drive and fire lane designation of Block 8 on sheet 3 of 23. f. Coordinate all easements, open areas, street, sidewalk and pedestrian crossings through out the development with Natural Resources, Stormwater, Traffic Operations, Engineering, Transportation Planning Services and other affected departments and outside reviewing agencies. g. The. City's Planning signature block on the Subdivision Plat should be titled "DIRECTOR OF PLANNING" and the statement should read: Approved by the Director of Planning of the City of Fort Collins, Colorado, this day of 1200. _ Director of Planning h. All certification blocks on the subdivision plat shall be consistent with the language required by the City of Fort Collins. The applicant/developer shall coordinate all emergency and utility infrastructure needs to . ensure that all infrastructure provisions are fully met. j. The applicant/developer shall coordinate with the Fort Collins — Loveland Water District and South Fort Collins Sanitation District their infrastructure needs.. k. The plan sets shall be in substantial conformance with all Land Use Code standards and criteria as conditioned and approved by the Hearings Officer. I. At least one more round of review for the Final Compliance plans is required before the plans could be signed and filed. Additional comments will be forthcoming as they are reviewed and received from City departments and from outside reviewing agencies. Please return all drawings red -lined by City staff with submission of your revisions. Please see the attached Revisions Routing Sheet for the number of copies of revisions to submit. To Commun..y Planning and Environmental IS vices Current Planning City of Fort Collins March 8, 2000 Mr. Dino DiTullio Everitt Companies 3030 South College Fort Collins, CO 80525 RE: Harvest Park - F.inal Compliance Dear Mr. DiTullio: Staff has reviewed your documentation dated PDP 1/25/00 for the Harvest Park - Final Compliance that were routed through the City on January 27, 2000 and February 17, 2000 and would like to offer the following comments: 1. Natural Resources: submitted a response that is attached to this document. 2. Engineering: comments received are attached to this letter. 3. Traffic Operations: two comment sheets forwarded with this letter. 4. Engineering Pavement: submitted a response that is attached to this document. 5.. Transfort: submitted a response.to the checklist and it is attached to this report. 6. Poudre Fire Authority: two comment sheets are attached with this letter and another comment sheet was forwarded on February 15, 2000. 7. Water/Wastewater: their response sheets are attached to this report. 8. Mapping/Drafting: submitted a,response to the checklist and it is attached to this report. 9. Transportation Planning: submitted a response that is attached to this document. 10. Park Planning: a comment sheet is attached to this letter and another comment sheet was forwarded on February 15, 2000. 11. Light and Power: a comment sheet is attached to this letter and another comment sheet was forwarded on February 15, 2000. 12. Public Service: a comment sheet is attached to this letter and a comment sheet was forwarded on February 15, 2000. 13. CDOT: submitted a response to the checklist and it is attached to this report. 14. Forestry: a comment sheet was forwarded on February 15, 2000. 15. Fort Collins - Loveland Water District and South Fort Collins Sanitation District: a comment letter forwarded on February 15, 2000. 16. AT&T Digital: a comment sheet was forwarded on February 15, 2000. 17. Post Office: a comment sheet was forwarded on February 15, 2000. 18. Streets: a comment sheet was forwarded on February 15, 2000. 19. Zoning: a comment sheet was forwarded on February 15, 2000. 20. Building Inspection: a comment sheet was forwarded on February 15, 2000. 21. Water Conservation: a comment sheet was forwarded on February 15, 2000. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020