Loading...
HomeMy WebLinkAboutHARVEST PARK - FDP - 25-98D - CORRESPONDENCE - (4)departments and outside reviewing agencies. d. Signed easements necessary for the project need to be submitted and reviewed prior to signature of mylars. Please contact me at 970.221.6750 and/or e-mail: rfuchsCa.ci.fort-collins.co.us if you should have any questions related to these comments and to schedule a meeting to discuss the Harvest Park Final Compliance comments. Sincerely, Ronald G. Fuchs Project Planner cc: Engineering Project File #25-98C DAMy Documents\Planning DocumenNHarvest Park #25-98A LUC\Harvest ParkFinalComplianceltrldoc .ri r Comm ty Planning and Environmental rvices Current Planning City of Fort Collins May 24, 2000 Mr. Dino DiTullio Everitt Companies 3030 South College Fort Collins, CO 80525 RE: Harvest Park - Final Compliance Third Round Dear Mr. DiTullio: Staff has reviewed your documentation dated PDP 4/25/00 for the Harvest Park — Final Compliance that were routed through the City on April 26, 2000 and would. like to offer the following comments: . 1. Natural Resources: submitted a response that is attached to this document. 2. Public Service: comment sheet is attached to this letter. 3. Water/Wastewater: a comment letter is attached. 4. Stormwater: comments are attached. 5. AT&T Digital: a comment sheet is attached. 6. Zoning: comment sheets are attached. 7. Engineering: comment sheets are attached. 8. Transportation Planning: comment sheet attached. 9. Mapping: comment sheet attached. 10. Planning: provides the following: a. As noted in letter dated April 12, 2000, single-family dwelling elevations need to comply withSection 4.4(D)(2)(a)-(d) and be provided to the Current Planning Department to insure compliance with the Hearings Officer decision document. The architectural elevations of single family buildings need to be sufficient to convey the basic architectural intent of the proposed dwellings, including building materials, roofing materials and color scheme. b. Note Sixteen (16) needs to be removed since it is referenced as NA. Notes Seven (7), Nineteen (19) and Twenty-one (21), sheet 11 of 22, need to be removed since they are not acceptable. Changes to an approved project development plan may require an amendment to be filed and/or possible a new - project development plan. review. c. Coordinate all easements, open areas, street, sidewalk and pedestrian crossings throughout the development with Natural Resources, Stormwater, Traffic Operations, Engineering, Transportation Planning Services and other affected 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020