HomeMy WebLinkAboutHARVEST PARK - FDP - 25-98D - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProjat-12f -'75c
Planner: Tralic Operations:�0
Engineer:
Bate: �fz/
Items Requested
Site Land Plat Utility Drainage Ept Other Items Required
Engineering X
Stormwater �s ,P
Redlined Items Being Returned
Site land Plat UtilityDrainage fl t Other Items Being Returned
Water/Wastewate
TraMc Operations
,,
Trans. Planning
<
Transfort
Natural Resources
Park Planning
Other:
note: All redlined items should be returned with the resubmittal/ revisions.
Revisions Routing Sheet
1. .s•
FTLE: PROJECT PLANNER
ENGINEERING: PAVEMENT
nnnnnnnnn�n��
It
nn�e�ainin�nsinan�nn
BUEL,NG INSPECTION
nn�nn�n�n�n�nnnin�n�nn
POWER
nn®nnnnnn�n�n�
MAPPING / DRAFTING
nnnnnnnn��n�nnn��n
•
in�nn�ninn�nin�n�nn�n�n
FCLVVD/ELC.:.. D.
nnin�nnnnin�n�innin�
®nnnnnninn�nnn�
.• 9nnin�ninn�nnn�n�nnn
ADVANCE PLANNING
nnnnininnninininrn�
n�nnnnnnn��nn��
• PLANNING
ATER CONSERVATIONn�nn�in�n�nn�nn�n�nn
POST OFFICE
ninnin�n�nn�nin�n��
nnnnnnnn�nnmmm
PUBLIC SERVICE
innnnni�n�n�mmmmn�
SCHOOLS:.. D. .
nin�nnninn��nenSTATE
��n�
=
nnnnnnn��nn�n���n
HIGHWAY DEPARTMENTininnnnnnnn�n��n��n
DITCH COMPANy
RAILROAD: P o=
nnnn���nnn��n��