HomeMy WebLinkAboutHARVEST PARK - FDP - 25-98D - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject:
Planner: % / — M .s
Engineer: z` - ,1cr /
Tr4( Operations: _s
Items Requested
Site land Plat Utility Drainage Rpt Other Items Required
Engineering k � � ,�
Redlined Items Being Returned
Site land Plat Utility Drainage fi t Other Items Being Returned
X X �
Stormwater
Water/Wastewater
Tragic Operations
x
X
Trans. Planning
Trans(ort
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should k returned with the resubmittal/ revisions.
Revisions Routing Sheet -- pug,
Item: y]
Date: :2- / zz° )cam g Q Q �� 04-
CA a
41
lie
k1 A g4w���44"k}'tiS
FILE: PROJECT PLANNER 2-
ENGINEERING: PAVEMENT .
ZONING
r
BUILDING INSPECTION
LIGHT & POWER �(/
MAPPING / DRAFTING
FORESTRY
FCLWD/ELCO/B O?CE L.DER
FIRE
POLICE
ADVANCE PLANNING
STREETS
R-O-W- PLANNING
WATER CONSERVATION '
POST OFFICE J�
US WEST
PUBLIC SERVICE ✓ Y
SCHOOLS: POUDRE / THOMPSON
CABLE Tv *FHM
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
RAILROAD: UP or BN/CS
REA/DOE/PRPA
Cn
TOTAL
Rev. 5-07-97