HomeMy WebLinkAboutHARVEST PARK - FDP - 25-98D - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET (3)Project:
Planner: s Trathc Operations:
Batt
Items Requested
Site Land Plat I Utility I Drainage Rpt Other Items Required
Engineering
Redlined Items Being Returned
Site I land I Plat Utility Drainage R t Other Items Being Returned
x x �Y- -I:
Stormwater
Water/Wastewate
Trafic Operations
x
x
x
Trans. Planning
Tran*rt
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
Revisions Routing Sheet
oil
ENGINEERING: PAVEMENT
BUELDING INSPECTION
m�mmm�mmm����
. •
m�®m�mmm�m��
�a
MAPPING/ DRAFTING
mmmmm�mmm�m��
•iV.
®mADVANCE
mmm�mmmim���
•
m�mmme����
PLANNING
WATER CONSERVATION
POST OFFICE
PUBLIC SERVICE
m
msmm®�m�mmi���
STATE HIGHWAY DE E
IN
DITCH COMPANY
NoRAILROAD: ��
UP or B
.
0is
Wmm����
mmmom
mmmommmmom
�■i►m����iiiiii�
�
NONNI
•�Eiar