Loading...
HomeMy WebLinkAboutSINCLAIR REDEVELOPMENT PUD - PRELIMINARY & FINAL - 20-96 - CORRESPONDENCE - OTHER JURISDICTIONSI appreciate any comments you have at this time. The applicant will be submitting a preliminary P.U.D. to the City within the next few weeks with the intent of going to the Planning and Zoning Board in June. By the time of the Board's hearing, I would like to be able to say that C.D.O.T. is okay, in concept and layout, with the two new access locations, the right turn lane, and the vacation of the frontage road. Please call me with any questions at (970)221-6750. 1 would like your response by Friday, May 24 if possible. Thank you. Sincerely, r W Y� Kerrie Ashbec Civil Engineer cc: File Ted Shepard, Senior City Planner enclosure Transpoi...don Services I Engineering Department , City of Fort Collins April 30, 1996 Tess Jones Colorado Department of Transportation 1420 2nd Street P.O. Box 850 Greeley, CO 80632 Dear Tess: A few weeks ago we met to discuss a number of development projects proposed in the City of Fort Collins. One of those projects was the southeast corner of College Avenue and Drake Road. The City will be reconstructing the intersection as a capital improvement project later this summer. As a result of the project, the existing gas station on the southeast corner will be submitting a P.U.D. to the City to redevelop the site into a convenience store/gas station layout. City staff has met with the owner of the gas station site (Sinclair) and the owners of the properties adjacent to the site on the south side (Thunderbird Motel and the Moot House restaurant). There are currently two curb cuts on College into the gas station and one into the Motel site in addition to the frontage road access in front of the restaurant. I suggested to the owners that they remove their existing curb cuts and consider constructing a shared curb cut on College Avenue on the property line. The owners of the motel wanted to have their own curb cut off of College Avenue as well as the shared curb cut. I suggested that, by closing off and vacating the frontage road in front of the motel and the Moot House and continuing the right turn lane back to Thunderbird Drive, we could create an opportunity to allow a new curb cut between the Moot House and the motel that would allow right in/right out access off of College Avenue. Enclosed is a preliminary layout of the proposed curb cuts and extension of the right turn lane. We are trying to save as many of the existing trees as possible. The southern proposed curb cut lines up with an existing drive aisle in the parking lot between the Moot House and the motel. It may be desirable to add radii to the curb cuts. Since this section of College Avenue is a Category 3 highway and this is a retrofit into the existing constraints, I need some input from you on what design criteria to apply. I view the tradeoffs of consolidating the curb cuts away from the intersection of Drake Road and getting rid of the old frontage road as benefits to the traffic flow on College Avenue. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605