Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSINCLAIR REDEVELOPMENT PUD - PRELIMINARY & FINAL - 20-96 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYCenter For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
File Name ................
Streets: (N-S) site drive (E-W) drake
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... mid
Date of Analysis.......... 6/18/96
Other Information......... existing short long am pm
Two-way Stop -controlled Intersection
Eastbound 1 Westbound 1 Northbound ' Southbound
L T R1 L T R1 L T R; L T R
1---- --------1---- --------1---- --------1---- ---- ----
No. Lanes 1 0 2< 0; 0 0 01 0 0 11 0 0 0
Stop/Yield N1 N1 ;
Volumes 466 181 ; 191
PHF .95 .951 .951
Grade 0 0 0 0
MC's (%) 0 01 01
SU/RV's (%)1 0 01 ; 0
CV's (%) 0 01 ' 01
PCE's ; 1.1 1.11 1.11
Adjustment
Factors
Vehicle -
Critical
Maneuver
Gap (tg)
----------------------------------------------
Left Turn Major Road
5.50
Right Turn Minor Road
5.50
Through Traffic Minor Road
6.50
Left Turn Minor Road
7.00
WorkSheet for TWSC Intersection
----------------------------------------------
Step 1: RT from Minor Street
NB
---------------------------------------------
Conflicting Flows: (vph)
242
Potential Capacity: (pcph)
1044
Movement Capacity: (pcph)
1044
Prob. of Queue -free State:
0.98
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
XYYXXYXYXX%YYYXXXXYYXX%YYYYXYYXYXXX%XXYXYXXYYXXXYYXXXXXYYYXXYXXY
File Name ................
Streets: (N-S) site drive (E-W) drake
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... mid
Date of Analysis .......... 6/18/96
Other Information......... existing short long am pm
Two-way Stop -controlled Intersection
Eastbound ' Westbound 1 Northbound ' Southbound
L T R1 L T R1 L T R1 L T R
I---- ---- ----1---- ---- ----1---- --------1---- ---- ----
No. Lanes 1 0 2< 01 0 0 01 0 0 1; 0 0 0
Stop/Yield N1 N1
Volumes ; 640 241 401
PHF ; .95 .951 1 .951
Grade 0 0 0 0
MC's (%) 0 01 ' 0
SU/RV's (%)1 0 01 01
CV's (%) 0 01 0i
PCE's 1.1 1.11 1.11
Adjustment
Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time(tf)
----------------------------------------------
---------------
Left Turn Major Road
5.50
2 10--'
Right Turn Minor Road
5.50
Through Traffic Minor Road
6.50
3 .30
Left Turn Minor Road
7.00_
3.40
_ -
_
-----------------
WorkSheet for TWSC Intersection
------
SB
----------------------------------------------
Step 1: RT from Minor Street
-------- ---------------------------------
--
--------
Conflicting Flows: (vph)
332
Potential Capacity: (pcph)
940
Movement Capacity: (pcph)
940
Prob. of Queue -free State:
0.95
Intersection Performance Summary
FlowRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ------ ------ ---- ------ -------
NB R 22 1044 3.5 A
Follow-up
Time (tf)
------- ----
2.10
2.60
3.30
3.40
SB
Intersection Performance Summary
FlowRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
NB R 46 940 4.0 A
Intersection Delay = 0.1 11. Intersection Delay = 0.1
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
MMMMXXXXMMXMMMMMMMMXMMMXXXXMXMMMXMXXMMMXMMMMMMMMMMXXMXXXMXXMMXMX
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
MMMMMMMMMMMMMMxxxXxxMXXXXXXXXMMXMMM#MMMMMMMxMMMMxMMMMMMMMMMxMXMX
File Name
File Name ................
................
Streets: (N-S) college
(E-W)
site drive
Streets: (N-S) college
(E-W) site
drive
Major Street Direction.... NS
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Analyst................... mjd
Date of Analysis .......... 6/18/96
Other Information......... existing
short long
am pm
I Date of Analysis.......... 6/18/96
Other Information......... existing
short long am
pm
Two-way Stop -controlled Intersection
I Two-way Stop -controlled Intersection
Northbound Southbound Eastbound
Westbound
Northbound Southbound
Eastbound
Westbound
L T R; L T
R; L T
R; L T
R
IL T R; L T
R; L T R;
L T
R
---- --------' ---- ----
No. Lanes 0 3 1; 0 0
---- ---- ----
0; 0 0
----I---- --- -
-
0' 0 0
---
1
-
I --- --------: ---- ----
No. Lanes ; 0 3 1; 0 0
----1---- --------!
0; 0 0 0;
---- ---- ----
0 0
1
Stop/Yield N;
N;
Stop/Yield N;
N
Volumes 716 36;
34
Volumes 949 41:
;
48
PHF .95 .95:
-95
PHF .95 .95;
.95
Grade 0 0
0
0
Grade 0 0
I
0
0
MC's (%) 0 0;
0
MC's (%) 0 0;
0
SU/RV's (%)1 0 0;
p
SU/RV's (%); 0 0;
0
CV's (%) 0 0;
0
CV's (%) 0 0;
;
0
PCE's 1.1 1.1:
i
1.1
PCE's , 1.1 1.1:
,
1.1
Adjustment Factors
I
Adjustment Factors
Vehicle
Critical
Follow-up
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
Maneuver
------------------------------------------------------------------
Gap (tg)
Time tf
( )
Left Turn Major Road
5.50
2.10
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
Left Turn Minor Road
7.00
3.40
WorkSheet for TWSC Intersection
WorkSheet for TWSC Intersection
--------------------------------------------------------
--------------------------------------------------------
Step 1: RT from Minor Street
--------------------------------------------------------
WB
EB
Step 1: RT from Minor Street
--------------------------------------------------------
WB EB
Conflicting Flows: (vph)
239
Conflicting Flows: (vph)
316
Potential Capacity: (pcph)
1048
Potential Capacity: (pcph)
958
Movement Capacity: (pcph)
1048
Movement Capacity: (pcph)
958
Prob: of Queue -free State:
- ----------------------------------------
0.96
Prob. of Queue -free State:
---------------------------------
0.94
-
Intersection Performance Summary
-'"-'"-" ""
� �
Intersection Performance Summary
Y
F1owRate MoveCap SharedCap
Avg.Total
Delay
F1owRate MoveCap SharedCap
Avg.Total
Delay
Movement v(pcph) Cm(pcph) Csh(pcph)
--------
Delay
LOS By App
Movement v(pcph) Cm(pcph) Csh(pcph)
-------- ------ ------ ------
Delay LOS
------------ ------
By .App
------ ----- ------
W8 R 40 1048
-----------
3.6
------ ---------
A
WB R 56 958
4.0 A
---------
Intersection Delay = 0.2 J Intersection Delay = 0.3
El
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
YYYYZYZZZX####YZX#XXYYYYYX##XYYZZX####XYZYX###YYYYZY#Y#######Y#Y
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
######X#X#####XX######X##X####XXX#####XX#XX#########XXXX########
File Name ................
File Name .....
Streets: (N-S) college
(E-W)
motel
Streets: (N-S) college
(E-W) motel
Major Street Direction.... NS
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Length of Time Analyzed... 60 (min)
Analyst ................... mid
Analyst................... mid
Date of Analysis.......... 6/18/96
Other Information......... existing
short long am pm
Date of Analysis.......... 6/18/96
Other Information......... existing
-
short long am
pm
Two-way Stop -controlled Intersection
-Two-way Stop -controlled Intersection
Northbound Southbound
Eastbound ;
Westbound
' Northbound Sou thbound
Eastbound ;
Westbound
L T R; L T
R; L T
R;
L T
R
L T R; L T
Ri L T R;
L T
R
---- --------: ---- ----
---- I ---- ---
----f ---- ----
---- ---'
---- ---- ----
No. Lanes ; 0 3 1; 0 0
0; 0 0
0;
0 0
1
No. Lanes ; 0 3 11 0 0
0; 0 0 0;
0 0
1
Stop/Yield N;
NI
Stop/Yield ; N;
N; - ;
Volumes 730 1;
1
Volumes 963 11
; ;
5
PHF .95 .951
i
-95
PHF .95 .95:
t
.95
Grade ; 0 ; 0
0
I
0
Grade ; 0 0
0 i
0
MC's (%) 0 0;
;
0
MC's (%) 0 0;
; ;
0
SU/RV's (1)1 0 0;
I
0
SU/RV's (%); 0 0;
; ;
0
CV's (%) ; 0 0;
1
0
CV's (%) 0 0;
0
PCE's 1.1 1.1;
1.1
PCE's 1.1 1.11
i
1.1
Adjustment Factors
I
Adjustment Factors
Vehicle
Critical
Follow-up
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
- 5.50
2.10
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Right Turn Minor Road
5.50
2.60 -
-
Through Traffic Minor Road
6.50
3.30 -
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
Left Turn Minor Road
7.00
3.40
WorkSheet for TWSC Intersection
-
-
WorkSheet for TWSC Intersection
________________________________________________________
---- ---------- ------ --------------------
Step 1: RT from Minor Street
---
WB
EB
Step 1: RT from -Minor -Street
--------------- -------------_--__-_-_-_
WBEB
-
Conflicting Flows: (vph)
43
Conflicting Flows: (vph)
321
Potential Capacity: (pcph)
_
1043
Potential Capacity: (pcph)
952
Movement Capacity: (pcph)
1
Movement Capacity: (pcph)
952
Pro-. of Queue -free State:
00
1.00
Prob. of Queue -free State:
--------------------------------------------------------
0.99
Intersection Performance Summary
Intersection Performance
Summary
F1owRate MoveCap SharedCap
Avg.Total
Dela
F1owRate MoveCap SharedCap
Avg.Total
Delay
Movement v(pcph) Cm(pcph) Csh(pcph)
Delay LOS
By App
Movement v(pcph) Cm(pcph) Csh(pcph)
Delay
LOS
By App
-------- ------ ------ ------
------------ ------
---------
------- ------ ----- -----'
------------
------
---------
WB R 6 952
3.8 A
WB R 1 1043 -
3.5
A
Intersection Delay = 0.2
Intersection Delay = 0.1 1.
HCS: Unsignalized Intersections Release 2.1c Page
Center For Microcomputersa In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) COLLEGE (E-W) THUNDERBIRDa
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis.......... 6/14/96
Other Information......... SR ST LT AM P©
Two-way Stop -controlled Interesodo
ca=
=a=Northbound=a Southbound ( Eastbound Westbound
L T R L T R L T R L T R
No. Lanes 1 0 3< 0 1 1 0 0 1 0 0 0 1 0 0 1
Stop/Yield
Volumes
PHF
Grade
MC'e (%)
SU/RV's W
CV,a M
PCE's
------------
N
946 22
.95 .95
0
-
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCS: Dnsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EE
Conflicting Flows: (vph)
344
Potential Capacity: (pcph)
927
Movement Capacity: (pcph)
927
Prob. of Queue -Free State:
0.95
------- ------------------------------------------------
Step 2: LT from Major Street
SE
NB
--------------------------------------------------------
Conflicting Flows: (Vph)
1019
Potential Capacity: (pcph)
486
Movement Capacity: (pcph)
486
Prob. of Queue -Free State:--- --------
--------------------------
0.91
-------------
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
(sec/veh)
-------- ------ ------ ------ -------
------- -----
---------
4.1
WB R 50 927 4.1
0.0 A
SB L 42 486 8.1
0.2 B
8.1
Intersection Delay =
0.4 sec/veh
HCS: Unsignalized Intersections Release 2.1c Page
c nac ac cc aavvaccc=c c avvcaa c aaccavcaaaaavvvvaaaaecvcavvaa
a a =va c nac aca c =cc
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
ccv a as== __= vaacaaacaccaa=avccaaac a cc c ca=c=acts
a ana aaaa aaaa = aaaa as =aa ana
Streets: (N-S) COLLEGE (E-W) THUNDERBIRD
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis.......... 6/14/96
Other Information......... ER ST LT ® PM
Two-way Stop -controlled Intersectio
==anaccaca aecvacaacaavacaacaavcaaaa= - _= cv _= aaaaa=
ala Northbound I Southbound laasastboundaa ` Westbound
L T R L T R L T R L T R
No. Lanes 0 3 < 0 11 0 0 1 0 0 0 1 0 0 1
Stop/Yield N
Volumes 718 10
PHF .95 .95
Grade 0
MCIa ($)
SU/RV's ($)
CV'a ($)
PCE's
--------------------------
26
.95
0
0
30
.95
1.10 1 1 1.10
--------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1c Page 2
=aaaaaaaavaaaaavv=avacanvaaaaaancaaaana====v accca==v=vaaa=aavavaccvvaac
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WE BE
Conflicting Flows: (vph)
258
Potential Capacity: (pcph)
1025
Movement Capacity: (pcph)
1025
Prob. of Queue -Free State:
0.97
-------- -----------------------------------------------
Step 2: IT from Major Street
SB
NB
________________________________________________________
Conflicting Flows: (vph)
767
Potential Capacity: (pcph)
664
Movement Capacity: (peph)
664
Prob. of Queue -Free State:-------------0_95
__________________________
__________---
Intersection
Performance Summary
Avg.
95�
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
_________
________ ______ ______ ______
_______
_______ _____
3.6
WE R 35 1025
3.6
0.0 A
SB L 30 664
5.7
0.0 B
5.7
Intersection Delay a 0.3 sec/veh
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4a 06-18-1996
Center For Microcomputers In Transportation
Streets: (E-W) drake (N-S) college
Analyst: Matt File Name: 2 E/W Area Type: Other 6-18-91 ar pm
Comment: existing short long `�
Eastbound ' Westbound ' Northbound , Southbound
' L T R L T R; L T R; L T R
No. Lanes 2 2 1 ; 2 2 1 2 3 1 ; 2 3 1
Volumes 350 596 188: 130 487 264: 188 1570 65: 134 925 191
PHF or PK1510.95 0.95 0.95:0.95 0.95 0.95:0.95 0.95 0.95;0.95 0.95 0.95
Lane Width :12.0 12.0 12.0;12.0 12.0 12.0112.0 12.0 12.0112.0 12.0 12.0
Grade ; 0 ; 0 ; 0 0
% Heavy Veh; 1 1 1; 1 1 1; 1 1 1; 1 1 1
Parking ;(Y/N) N I(Y/N) N I(Y/N) N ;(Y/N) N
Bus Stops 0; 0; 0; 0
Con. Peds 0; 0; 0; 0
Ped Button ;(Y/N) Y 29.5 s:(Y/N) Y 29.5 s;(Y/N) Y 23.5 si(Y/N) Y 23.5
Arr Type ; 3 3 3; 3 3 3; 3 5 3; 3 5 3
RTOR Vols 1 0; 0; 0; 0
Lost Time :3.00 3.00 3.0013.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.00
Prop. Share;
Prop. Prot.; i
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * ;NB Left
Thru * ; Thru
Right * Right
Peds ; Peds
WB Left * ;SB Left
Thru * ; Thru
Right * Right
Peds ; Peds
NB Right * ;EB Right
SB Right * ;WB Right
Green 17.OA 30.OA - 16reen 19.OA 36.OP.
Yellow/AR 4.0 5.0 ;Yellow/AR 4.0 5.0
Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ----- ----- ----- --- ----- ---
EB L 536 3574 0.707 0.150 39.8 D 31.1 D
T 1003 3762 0.656 0.267 30.8 D -
R 733 1599 0.270 0.458 15.3 C
WB L 536 3574 0,263 0.150 34.4 0 26.2 D
T 1003 3762 0.537 0.267 29.1 D
R 733 1599 0.379 0.458 16.4 C
NS L 596 3574 0.342 0.167 33.7 D 35.9 0
T 1787 5644 1.017 0.317 37.1 D
R 786 1599 0.086 0.492 12.3 B
SB L 596 3574 0.243 0.167 33.0 D 19.2 C
T 1787 5644 0.599 0.317 18.4 C
R 786 1599 0.256 0.492 13.5 B
Intersection Delay = 29.1 sec/veh Intersection LOS = D
Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.733
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4a 06-18-1996
Center For Microcomputers In Transportation
Streets: (E-W) drake (N-S) college
Analyst: Matt File Name: Z �/� G �-
Area Type: Other 6-16-96 am pm
Comment: existing short long
Eastbound ; Westbound Northbound ; Southbound
L T R L T R L T R L T R
---- ---- --- ---- ---- ----I---- ---- ----1---- ---- ----
No. Lanes 2 2 1 2 2 1 2 3 1 1 2 3 1
Volumes 307 648 3641 206 690 1741 388 1912 120: 322 2386 445
PHF or PK15I0.95 0.95 0.95;0.95 0.95 0.95;0.95 0.95 0.95;0.95 0.95 0.95
Lane Width :12.0 12.0 12.0;12.0 12.0 12.0;12.0 12.0 12.0112.0 12.0 12.0
Grade - 0 0 ; 0 ; 0
% Heavy Vehi 1 1 1 1; 1 T 11 1 1 1
Parking ;(Y/N) N ;(Y/N) N ;(Y/N) N ;(Y/N) N
Bus Stops 0; 0; 0; 0
Con. Peds ; 0; 0; 01 0
Ped Button ;(Y/N) Y 29.5 s;(Y/N) Y 29.5 s;(Y/N) Y 23.5 s:(Y/N) Y 23.5
Arr Type 3 3 3; 3 3 3; 3 5 3; 3 5 3
RTOR Vols 0; 0; 0; 0
Lost Time :3.00 3.00 3.00:3.00 3.00 3.00;3.00 3.00 3.0013.00 3.00 3.00
Prop. Share;
Prop. Prot.; I
Signal Operations
Phase Combination 1 2 3 4; 5 6 7
EB Left * ;NB Left
Thru * Thru
Right * Right
Peds ; Peds
WB Left * ;SB Left
Thru * ; Thru
Right * ; Right
Peds Peds
NB Right * :EB Right
SB Right * - ;WB Right
Green 12.OA 23.OA ;Green 13.OA 54.OP
Yellow/AR 4.0 5.0 ;Yellow/AR 4.0 5.0
Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6
------------------------------------------------ ---------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
---- ---- ------- ----- ----- ----- --- ----- ---
EB L 387 3574 0.660 0.108 52.1 E 42.6 E
T 784 3762 0.914 0.208 46.2 E
R 560 1599 0.684 0.350 27.7 D
WB L 387 3574 0.579 0.108 40.3 E 46.9 E
T 784 3762 0.972 0.208 54.8 E
R 560 1599 0.327 0.350 21.9 C
NB L 417 3574 1.007 0.117 76.1 F 19.8 C
T 2634 5644 0.841 0.467 9.8 8
R 959 1599 0,131 0.600 7.9 B
SB L 417 3574 0.837 0.117 49.0 E 32.2 D
T 2634 5644 1.049 0.467 33.7 D
R 959 1599 0.488 0.600 10.6 B
Intersection Delay = 32.0 sec/veh Intersection LOS = D-
Lost Time/Cycle, L = 12.0 sec Critical v/c.(x) = 1.003
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4a 06-18-1996
Center For Microcomputers In Transportation
Streets: (E-W) drake (N-S) college
Analyst: Matt File Name:
Area Type: Other 6-18-9 am pm
Comment: existing short long
Eastbound Westbound Northbound ; Southbound
L T R; L T R L T R; L T R
---- ----I---- ---- ----I---- --------1---- ---- ----
No. Lanes 1 2 1 1 2 1 2 3 1 ; 2 3 1
Volumes 350 596 1881 130 487 264: 188 1570 65: 134 925 191
PHF or PK1510.95 0.95 0.9510.95 0.95 0.95:0.95 0.95 0.95:0.95 0.95 0.95
Lane Width :12.0 12.0 12.0;12.0 12.0 12.0;12.0 12.0 12.0;12.0 12.0 12.0
Grade ; 0 i 0 0 ; 0
% Heavy Veh; 1 1 1; 1 1 1; 1 1 1; 1 1 1
Parking ;(Y/N) N ;(Y/N) N ;(Y/N) N ;(Y/N) N
Bus Stops 0; 0; 0; 0
Con. Peds ; 0; 0; 0; 0
Ped Button ;(Y/N) Y 29.5 s;(Y/N) Y 29.5 s;(Y/N) Y 20.5 s1(Y/N) Y 20.5
Arr Type 3 3 3; 3 3 3I 3 5 3i 3 5 3
RTOR Vols 0! 01 0; 0
Lost Time :3.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.00
Prop. Share; ;
Prop. Prot.'
______________-______________----___________�
____________ ______________
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * * ;NB Left
Thru * Thru
Right * ; Right
Peds Peds
WB Left * * ;SB Left
Thru * ; Thru
Right * Right
Peds ; Peds
NB Right * ;EB Right
SB Right * ;WB Right
Green 17.OA 30.OA ;Green 19.OA 36.OP
Yellow/AR 4.0 5.0 ;Yellow/AR 4.0 5.0
Cycle Length: 120 sacs Phase combination order: #1 #2 #5 #6
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c 9/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ----- ----- ----- --- ----- ---
EB L 363 1787 1.014 0.325 61.9 F 37.7 0
T 1003 3762 0.656 0.267 30.8 0
R 733 1599 0.270 0.458 15.3 C
WB L 331 1787 0.414 0.325 17.6 C 23.7 C
T 1003 3762 0.537 0.267 29.1 D
R 733 1599 0.379 0.458 16.4 C
NB L 596 3574 0.342 0.167 33.7 D 35.9 D
T 1787 5644 1.017 0.317 37.1 D
R 786 1599 0.086 0.492 12.3 8
SB L 596 3574 0.243 0. 167 33.0 0 19.2 C
T 1787 5644 0.599 0.317 18.4 C -
R 786 1599 0.256 0.492 13.5 B
Intersection Delay = 30.1 sec/veh Intersection LOS = D
Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.906
_______________________________________________________________________
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4a 06-18-1996
Center For Microcomputers In Transportation
Streets: (E-W) drake (N-S) college
Analyst: Matt File Name:
Area Type: Other 6-18-96 am pm
Comment: existing short lon
Eastbound Westbound ; Northbound ; Southbound
L T R L T R L T R L T R
--------'---- ---- --- --- --------1---- ----
No. Lanes ; 1 2 1 1 2 1 2 3 1 ; 2 3 1
Volumes 307 648 364: 206 690 174: 388 1912 120: 322 2386 445
PHF or PK1510.95 0.95 0.9510.95 0.95 0.95:0.95 0.95 0.95;0.95 0.95 0.95
Lane Width ;12.0 12.0 12.0;12.0 12.0 12.0;12.0 12.0 12.0;12.0 12.0 12.0
Grade I 0 ; 0 ; 0 ; 0
% Heavy Veh; 1 1 1; 1 1 1; 1 1 1; 1 1 1
Parking i(Y/N) N ;(Y/N) N :(Y/N) N ;(Y/N) N
Bus Stops i 0; 0; 0; 0
Con. Peds 1 01 0; 0; 0
Ped Button ;(Y/N) Y 29.5 s;(Y/N) Y 29.5 s;(Y/N) Y 20.5 s;(Y/N) Y 20.5
Arr Type 1 3 3 3; 3 3 3: 3 5 3; 3 5 3
RTOR Vols 0; 0; 0; 0
Lost Time :3.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.00;3.00 3.00 3.00
Prop. Share; i
Prop. Prot.;
____-_________________________________________________________________
Signal Operations
Phase Combination
1 2
3 4;
5
6 7
8
EB Left
* *
;NB Left
Thru
*
Thru
Right
*
Right
Peds
; Peds
WB Left
* *
;SB Left
Thru
*
Thru
Right
*
; Right
Peds
; Peds
NB Right
*
;E8 Right
SB Right
*
;WB Right
Green
16.OA
23.OA
;Green 16.OA
47.OP
Yellow/AR
4.0
5.0
;Yellow/AR 4.0
5.0
Cycle Length:
120
secs Phase combination order: #1 #2
#5 #6
-----------------------------------------------------------------------
Intersection Performance Summary
Lane
Group:
Adj Sat
v/c
g/C
Approach:
Mvmts
Cap
----
Flow
-------
Ratio
-----
Ratio Delay
----- -----
LOS Delay
--- -----
LOS
---
-----
EB L
316
1787
1.022
0.308 71.6
F 46.2
E
T
784
3762
0.914
0.208 46.2
E
R
600
1599
0.639
0.375 25.0
C
WB L
316
1787
- 0.687
0.308 26.5
D 44.1
E
T
784
3762
0.972
0.206 54.8
E
R
600
1599
0.305
0.375 20.2
C
NB L
506
3574
0.830
0.142 45.6
E 22.7
C
T
2305
5644
0.961
0.408 19.1
C
R
919
1599
0.137
0.575 8.9
B
SB L
506
3574
0.689
0.142 40.0
D
T
2305
5644
1.199
0.408
R
919
1599
0.509
0.575 12.0
B
Intersection
Delay = *
(sec/veh) Intersection LOS
=
(g/C)*(V/c)
_______________________________________________________________________
is greater then
one. Calculation of D1 is
infeasable.
APPENDIX C
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
XXXXXXXXXXXXXXXXXXXXXXYXXXXXXXXXXXXXXXXXXXMXXXXXXXXXXXXXXXXXYXXX
File Name .......... :..... - - -
Streets: (N-S) site drive (E-W) drake
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... mid
Date of Analysis.......... 6/18/96
Other Information-........ existing short long am pm
Two-way Stop -controlled Intersection
Eastbound Westbound Northbound , Southbound
,
L T R; L T R; L T RI L T R
---- ---- ---- I ----- --- ---- I ---- ---- ---- I ---- ---- ----
No. Lanes 0 2< 01 0 0 0; 0 0 1; 0 0 0
Stop/Yield ; N; N; ;
Volumes 399 18: 19: -
PHF - -9 "-91 - I .91 ..
Grade - 0; - .0 ; 0 ; .0
MC's (%) 0 01 01
SU/RV's (%)! 0 0;
CV's (%) i 0 01 i 0:
PCE's , 1.1 1.1; - 1.1
------------------------------ __________________________________________
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
-------------------
Time (tf)
----------------------------------------------
Left Turn Major Road
5.50
2.10
- Right Turn Minor Road
5.50 --
2.60
Through Traffic Minor Road -
6.50
3.30
Left Turn Minor Road -
7.00
3.40 "
WorkSheet for TWSC Intersection
" --------------------------------------------------------
Step 1: RT from Minor Street
NB
I SB
--------------------------------------------------------
Conflicting Flows: (vph)
208
-
Potential Capacity: (pcph) _ -
1086
Movement Capacity: (pcph)
1086
-
Prob: of Queue -free State:
--------------------------------------------------------
0.98
-
Intersection Performance Summary
F1owRate MoveCap SharedCap
Avg.Total
- Delay
Movement v(pcph) Cm(pcph) Csh(pcph)
________ ______ ______ .____-_
Delay .
------------
LOS By App
NB R 23 1086
3-4
------ ---_-_-
A -
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
Y YYYYXYYYYYXYXYXXYYXXYYYXXXYtXYYXYXXXXXXXYYXXXYXXXYXXXXYXYXXXXYY
File Name
Streets: (N-S) site drive (E-W) drake
Major Street Direction..-. EW -
Length of Time Analyzed.._ 60 (min)
Analyst ................... mid
Date of Analysis---------" 6/18/96
Other Information......... existing short long am pm
Two-way Stop -controlled Intersection
Eastbound Westbound ' Northbound ' Southbound
L T R; L T R; L T R; L T R
---- --------f---- --------1---- ---- ----1 --- --- ----
No. Lanes 1 0 2< 01 0 0 0; 0 0 1; 0 0 0
NI
Stop/Yield � N
Volumes , 547 241 ; 401-
PHF.9 .9i
Grade 0 i 0 0 0
MC's (%) 0 01 01
SU/RV's (%); 0 0; 01
CV's
PCE's
------------------------------------------- _____________________________
Adjustment Factors
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
__________________________________________________________________ .
Left Turn Major Road 5.50 2.10
Right Turn Minor -Road - 5..50 2:60
Through Traffic Minor Road - 6.50 - 3.30
Left Turn Minor Road 7.00. 3.40
WorkSheet for TWSC Intersection
-------------------------=----- -----------
Step 1:-RT from Minor Street NB SB
________________________________________________________
Conflicting Flows: (vph) 286
Potential Capacity: (pcph) 992
Movement Capacity: (pcph) 992
Prob. of Queue -free State: ___-0_95
---- -------------
Intersection Performance Summary
F1owRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
________ ______ ______ ______ ------------ ------ ---------
NB R 48 992 3.8 A
Intersections Delay = - 0.2
Intersection Delay = 0.1 - - - "
Center For
Microcomputers In
Transportation
I -
Center For
Microcomputers In Transportation
HCS: Unsignalized Intersection
Release 2.1
Page 1
HCS: Unsignalized Intersection
Release 2.1
Page 1
YYXXXYYYYXYYYYYYYYYXXXXYXXYYYYYYYYXYXYYYXYXXXYYXYYXYYYXYXXXYYYXX
XYXYYXXXYYYYYYYXXYXYYYYYYXYYYYYYYXYYYYYXYYYYYYYYYYYYYYXXXYYXYYYY
File Name ................
File Name ................
Streets: (N-S) college
(E-W).site drive
Streets: (N-S) college
(E-W) site
drive
Major Street Direction....
NS
Major Street Direction....
NS
Length of Time Analyzed...
60 (min)
Length of Time Analyzed...
60 (min)
Analyst ...................
mjd
Analyst...................
mJd
Date of Analysis..........
Other Information.........
6/18/96
existing short long am pm
Date of Analysis..........
Other Information.........
6/18/96
existing short
long am
pm
Two-way Stop -controlled
Intersection
---
Two-way Stop -controlled
---------------
Intersection
Northbound
----
Southbound !
------------
Eastbound ! Westbound
-------------------------------------------
! Northbound
! Southbound ,
Eastbound !
Westbound
L T
R; L T R!
L T R; L T
R
L T
R! L T R!
L T R;
L T
R
No. Lanes 0 3
L! 0 0 01
0 0 0; 0 0.
1
No. Lanes ! 0 3
1! 0 0 0!
0 0 01
0 0
1
Stop/Yield !
N! N!
Stop/Yield !
N! N!
Volumes ! 608
361 !
34
Volumes 807 '41!
!
!
.48,
PHF ! .9
.9:
_9
PHF ! .9
I
.9!
.9
Grade 0
! 0 !
0 0
Grade 0
! 0
0'
0
MC's (%) ! 0
01 !
0
MC's (%) ! 0
01 '
0
-SU/RV's (%),! 0
0!
0
SU/RV's (%)! 0
0! ;
�
0
CV's (%) ! 0
01
0
CV's (%) 0
0!
0
PCE's 1.1 1.1!
1.1
PCE's , 1.1 1.1,
1.1
--
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
-----------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.50
2.10
Right Turn Minor Road _
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
WorkSheet for TWSC Intersection
-------------------------------------------------------
-
Step 1:. RT from Minor Street
--------------------------------------------------------
WB
EB -
Conflicting Flows: (vph)
203
Potential Capacity: (pcph) -
1093
Movement Capacity: (pcph)
1093
Prob. of Queue -free State: -
-----------------------------------------------------
-0.96
-
Intersection Performance Summary
F1owRate MoveCap SharedCap
Avg.Total
Delay
Movement v(pcph) Cm(pcph) Csh(pcph)
-------- ------ ------ ------
Delay
------------
LOS By App
WB R .. 42 1093
3.4
------ -------
A
Adjustment Factors
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------------------------------------------------------------
Left Turn Major Road _ 5.50 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.50 3.30
Left Turn Minor Road 7.00 3.40
WorkSheet for TWSC
----------------------
Intersection
----------------------
Step 1: RT'from Minor Street
--------------------- -----------------------------------
-
WB EB
Conflicting Flows:-(vph)
269
Potential Capacity: (pcph)
1012 -
. Movement Capacity: (pcph)
1012
Prob: of Queue -free State:
--------------------------------------------------------
0.94
Intersection Performance Summary
F1owRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ----- ----- ----------- ------ ---------
WB R 58 1012 3.8 A - -
Intersection Delay= 0.2 - - i 'Intersection Delay = 0..3
Center For Microcomputers In Transportation
HCS: Unsio_nalized Intersection Release 2.1 Page 1
. File Name ................
Streets: (N-S) college (E-W) motel
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 6/18/96
Other Information......... existing short long am pm
Two-way Stop -controlled Intersection
------------------------- Northbound Southbound Southbound ; Eastbound ; Westbound
L T R; L T R; L T R; L T R
---- ---- ---- I ---- ---- ---- I ---- ---- ---- I ---- ---- ----
No. Lanes ; 0 3 1; 0 0 0; 0 0 0; 0 0 1
Stop/Yield N; N
Volumes 622 1; I i
PHF .9 .9; I .9
Grade 0 0 0 0
MC's (%) 0 0: i i 0
SU/RV's (%); 0 0; 1 0
CV's (%) 0 0; 0
PCE's 1.1 1.1: i i 1.1
------------------------------------------------------------------------
Adjustment Factors
Vehicle Critical Follow-up
Maneuver Gap (t9) Time (tf).
------------------------------------------------------------------
Left Turn Major Road 5.50 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.50 3.30
Left Turn Minor Road 7.00 3.40
WorkSheet for TWSC Intersection .
---------------------------------------------------------
Step 1: RT from Minor Street WB EB
------------------------------------------------------
Conflicting Flows: (vph) -207
Potential Capacity: (pcph) 1088
Movement Capacity: (pcph) 1088
Prob. of Queue -free State: 1.00
--------------------------------------------------------
Intersection Performance Summary
FlowRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ------ ------ ------------ ------ ---------
WB R 1 1088 3.3 A
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
File Name ................
Streets: (N-S) college (E-W) motel
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 6/18/96
Other Information......... existing short long am pm
Two-way Stop -controlled Intersection
' Northbound Southbound f Eastbound I Westbound
L T R; L T R; L T R; L T R
---- ----I---- ---- ---- I --- ---- ---- I ---- ---- ----
No. Lanes 0 3 1; 0 0 0; 0 0 0; 0 0 1
Stop/Yield N; N;
Volumes 821 1; 5
PHF ' .9 .9; ; .9
Grade 0 0 0 0
MC's (%) 0 0; i 0
SU/RV's (%); 0 0; 0
CV's (%) 0 0; 0
PCE's i 1.1 1.1: 1.1
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
WorkSheet for TWSC
Intersection
--------------------------------------------------------
Step 1: RT from Minor Street
------------------------------------------------------
WB
.
EB
Conflicting Flows: (vph)
274
Potential Capacity: (pcph)
1006
Movement Capacity: (pcph)
1006
Prob. of Queue -free State:
------------------------------------------------------
0.99
Intersection Performance Summary
FlowRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ------ ------------------ ------ -------
WB R 7 1006 3.6 A
Intersection Delay = 0.1 Intersection Delay = 0.2
Center For " Microcomputers In Transportation
HCS: Unsianalized Intersection Release 2.1 Page 1
XX#####X#XXXX##XXXXXX#XXX###XXXXX##XXX######X###X#XXM#X#####X#X#
File Name ................. ..
Streets: (N-S) college (E-W) thunderbird
Major Street Direction.... NS
Length of Time Analyzed... 60 (min) .
Analyst................... mid
Date of Analysis.......... 6/18/96
Other Information......... existing short long am pm
Two-way Stop -controlled Intersection
Northbound I Southbound ; Eastbound ; Westbound
L T R; L T R; L T R; - L T R
---- --- ---- ---- ----'I ---- ---- ---- I ---- ---- ----
No. Lanes 0 3< 0; 1 0 0; 0 0 0; 0 0 1
Stop/Yield ; N; N; _
Volumes 804 "181 33 _ 43
PHF .9 .9; .9 - .9
Grade .; 0 0 0 0
MC's (%) 0. 01 0" i 0
SU/RV's (%) 0 0': 0 - 0
CV's (%) 0 0' 0 0
PCE's 1.1 1.11 1.1 i 1.1
Adjustment Factors
Vehicle Critical
Maneuver _ Gap (tg)
----------------------------------------------
Left Turn Major Road '5.50
Right Turn Minor Road 5.50
Through Traffic Minor Road 6.50
Left Turn Minor Road 7.00
Follow-up
Time (tf)
2.60
.3.30
3.40
Center For Microcomputers In Transportation
HCS: Unsianalized Intersection Release 2.1 Page 2
xxxx#XXX#X#x#Xxxx#xXXx#xXxxXXxXXxXX#xXxxxX##XXx#x#XxXxx#x#xXXXXX
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
277
Potential Capacity:
(pcph)
1002
Movement Capacity:
(pcph)
1002
Prob. of Queue -free
State:
0.95
------------------------------------------------------
Step 2: LT from Major
Street
SB NB
-------------------------------------------------------
Conflicting Flows:
(vph)
822
Potential Capacity:.(pcph)
621
Movement Capacity:
(Pcph)
621
Prob. of Queue -free
State:
0.93
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
XZYXZZZXXXZZXXXXXZXXXXXZZXXZXXXXXZXXXXXXXZZXZXZZZZZXXXXZXXXXZXZZ
Intersection Performance Summary
F1owRate MoveCap .SharedCap Avg.Total - Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ------ ------------------ -------------
WB R .53 1002. 3.8 A
SB L 41 621 6.2 B 0.4
Intersection Delay = 0.3
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
YYYY#YYYYYZZZZYZ#ZZYYYYYYYY##YYYYYYYY#YZZZZZ#ZZZZZZZYYYYYZYYYYZY
File Name ................
Streets: (N-S) college (E-W) thunderbird_ -
Major Street -Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd .
Date of Analysis.......... 6/18/96
Other Information......... existing short long am pm
Two-way Stop -controlled Intersection
Northbound Southbound ; Eastbound Westbound
L T R; L T R; L T R; L T R
--- ---- --- --- --- '---- ---- ---- '---- ---- ---
No. Lanes 0 3< 0; 1 0 0; 0 0 0; •0 0 1,
Stop/Yield N; N; .;
Volumes ; 610 8; 21 30
PHF
Grade 0 0 0 0
MC's (%) ; 0 0; 0 0
CV's (%) 0 0; 0 ! 0
PCE's - 1.1- 1.11 1.1 1.1
------------------------------------------------------------------------
Adjustment Factors
Vehicle Critical Follow-up
Maneuver - Gap (tg) "Time (tf)
Left Turn Major. Road _ 5.50 2.10 -
Right Turn Minor Road 5.50 --2.60
Through Traffic Minor Road - 6.50 3.30
Left Turn Minor Road 7.00 3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
x xYXxz##x#xxzzzxxzxzxz#zXxYYxxzzzxYzzxYXXZYxzxxxzxY#YzxzxYYYYxxY
. WorkSheet for TWSC Intersection
----------- ---------------------------------------------
Step 1: RT from Minor- Street WB EB
Conflicting.Flows:
(vph)
207
Potential Capacity:
(pcph)
1088
Movement Capacity:
(pcph)
1088
Prob. of Queue -free
--------------------------------------------------------
State:
0.97
Step 2:-LT from Major Street
----------------------------------------------
.
SB NB
Conflicting Flows:
(vph)
------
618
Potential Capacity:
(pcph)
- 799
Movement Capacity:
(pcph)
799
Prob. of Queue -free
-------------- ---------------------------------------
State:
0.97
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
X XXXXXXXXXXXXYXXXYXXXXXXXXXXXXXXXXXXXXXXXXYXYXXXXXXXXXXXXXXXXXXX
Intersection Performance Summary
FlowRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay - LOS By App
-------- ------ ------ ------ ------------ ------ -------
WB R 36 1088 3.4 A
SB L 25 799 4.7 A 0.2
Intersection Delay = 0.2
HCM: SiGNALIZFCenterEForCMicrocomputers Inraranspotation 06-18-1996
Streets:-(E-W) drake (N-S) college - -
Analyst: Matt File Name:
Area Type: Other 6-18-96 am pm
Comment: existing short - long
Eastbound ' Westbound ' Northbound Southbound
; L T R; L T R; L T R; L T R
1---- --------;---- ---- ----I---- ---- ---;---- ---- ----
No. Lanes ; 1 2 1; 1 2 1 2 3 1; 2 3. 1
Volumes 294 512 157; 109 412 222; 160 1337 561 115 771 159
PHF or PK15;0.90 0.90 0.9010.90 0-.90 0.90;0.90 0.90 0.90:0.90 0.90 0.90
Lane Width ;12.0 12.0 12.0;12.0 12.0 12.0112.0 12.0.12.0112.0 12.0 12.0
Grade ; - 0 ; 0 0 0
% Heavy Veh; 1 1 1; 1 1 i; 1 1 1; 1 1 1
Parking ;(Y/N) N ;(Y/N) N ;(Y/N) N --;(Y/N) N
Bus Stops 0;0; 01 0
Con. Peds ; 0; 0; 0; 0
Ped Button ;(Y/N) Y 29.5 s;(Y/N) Y 29.5 s;(Y/N) Y 20-.5 s;(Y/N) Y 20.5
Arr Type 3 - "3 3; 3- 331 3 5 3; 3 5 3
RTOR Vols ; - 0; "0; 0; 0
Lost Time ;3.00 3.00 3.00:3.00. 3.00 3.00:3.00 '3.00 3.0013.00. 3.00 3.00
Prop. Share;
Prop. Prot.; ;
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * * ;NB Left
Thru * ; Thru
Right * - ; Right
Peds - - Peds
WB Left * * ";SB "Left
Thru* ; Thru
Right * Right
Peds ; Peds -
NB Right * ;EB Right
SB Right - * -- ;WB Right
Green 15.OA.28.OA ;Green 17.OA 32.OP.
Yellow/AR - -4.0 5.0 .;Yellow/AR 4.0 5.0
Cycle Length: 110 secs Phase combination order: #1 #2 #5 #6
---------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio" Delay LOS Delay LOS
----- ---- ------- ----- ----- ----- --- ----- ---
ES L - 382 1787 "0.856 0.318 28.7 D 25.3 .�D
T 1026 3762 0.582 0.273 26.9 D
R - - 741 1599 0.235 0.464 13.5 8
WB L 342 1787 0.354 0.318 15.2 C 20.8 C
T 1026 3762 0.469 0.273 25.6 D -
"R 741 1599 0.333 0.464 14.3 B
NB .LL .585 3574 0.313 - 0.164 30.9 D 24.2 C
T 1745 5644 0.937 0.309 24.0 C
R 770 1599. 0.080 0.462 11.7 B
SS L. -585 3574" 0.226 0.164 ' -.30.4 D 17.8 C
T 1745 5644 0.541 0.309 16.9 C .
R 770 1599 0.230 0.482 12.6 B
Intersection Delay = 22.3 sec/veh Intersection LOS = C
Lost Time/Cycle. L = 9.0 sec Critical v/c(x) = 0.709
---------------------------------------
HCM: SIGNALIZFED INTERSECTION SUMMARY Ier is ion 2.4t 06-18-1996
en er ror Microcomputers n ranspor ation
Streets: (E-W) drake (N-S) college
Analyst: Matt File Name:
Area Type: Other 6-18-96 am pm
Comment: existing short long
Eastbound ; Westbound ; Northbound ; Southbound
L T R; L T R; L T R; L T R
1---- --------;---- --------;---- ---- ----;---- --- ----
No. Lanes 1 2 1 1 2 1 ; 2 3 .1 ;- 2 3 1
Volumes ; 256 558 303; 175 583 146; 329 1633 103; 274 1908 371
PHF or PK15;0.90 0.90 0.90:0.90 0.90 0.9010.90 0.90 0.90:0.90 0.90 0.90
Lane Width ;12.0 12.0 12.0;12.0 12.0 12.0;12.0 12.0 12.011.2.0 12.0 12.0
Grade .I 0 ; 0 0 0
% Heavy Veh; 1 1 1; 1. 1 1;- -"1 1 1; 1 . 1 1
Parking ;(Y/N) N ;(Y/N) N ;(Y/N) N ;(Y/N) N .
Bus Stops ; 0; - 0; "0; 0
Con. Peds 1 0; 0; 0; 0
Ped Button..;(Y/N) Y 29.5 s;(Y/N) Y 29.5 s;(Y/N) Y 20.5 s;(Y/N) Y 20.5
Arr Type 1 3 3 3; 3 3 3; 3 'S 31- 3 5 3
RTOR Vols ; 0; 0; 0; 0
Lost Time ;3.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00-3.00;3.00 3.00 3.00
Prop. Share;
Prop. Prot.;
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 +'7.;, 8.
EB Left * * ;NB Left * "
Thru * Thru
Right * Right* -
Peds ; Peds
WB Left * * ;SB Left
Thru * - ; Thru
Right * ; Right
'Peds - ; Peds
NB Right *- ;EB Right * -_
SB. Right * ;WB Right
Green 16.OA 23.0A ;Green 16.OA 47.OP
Yellow/AR 4.0 .5.0 ;Yellow/AR 4.0 5.0
Cycle Length: 120 secs Phase combination order: #1 #2 #5 #6.
--------------------------------
Intersection Performance Summary
Lane Group: Adj Sat V/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay .LOS
----- ---- ------- ---- ----- ----- -- ----- ---
EB L 316 1787 0.899 0.308 42.9 -E 36.2 0
T 784 3762 0.831 0.208 39.8 D
R "600. 1599 0.562 _ 0.375 23.5 C
WB L 316 1787 0.614 0.308 24.2 C 35.3 D.
T 784 3762 0.868 0.208 42.1 E
R 600 1599 0.270 0.375 19.9 C
NB L 506 3574 .0.745 0.142 41.6. E - --18.5 C
T - 2305 "5644 0.866 0.408 14.7E
R 919 .1599 0.124 0.575 8.9 B -
SB L 506 3574 0.618 0.142 38.5 D 36.6 0
T 2305 5644 - 1.054 0.408 40.7 E
R 919 1599 0:448 0.575 11.3 B
Intersection Delay = 30.7 sec/veh Intersection LOS = D
Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = 0.954
APPENDIX B
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 - Page 1
X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
File Name ................
Streets: (N-S) office drive
Major Street Direction .... .EW
Length of Time Analyzed... 60 (min)
Analyst ................... mid
Date of Analysis.......... 6/1
Other Information......... existing short long
Two-way Stop -controlled Intersection
Eastbound I Westbound
L T R; L T R
__-- -___ ---- i---- __-- ----
No. Lanes 0 2< 0; 1 2 0
Stop/Yield N; N
Volumes 542 6; 5 .532.
PHF .9 .9; .9 .9
Grade 0 0
MC's (%) 0 0; 0 - 0
SU/RV's '(%)'i 0 0: 0 0
CV's (%) - 0 0; 0 0
PCE's ; 1.1 1.1; 1.1- .1.1
(E-W) drake
am pm
Northbound ; Southbound
L
T
R; L
T
R
___ _-__
____i____ ___-
----
1
0
1; 0
.0
0
I
12
22:
.9
.9I
0
0
0
0;
0
0
0
0;
1.1
1.1
Adjustment Factors
Vehicle - Critical
Maneuver Gap (tg)
------------ ---------------------
Turn Major Road 5.50
Right Turn Minor Road 5.50
Through Traffic Minor Road 6.50
Left Turn Minor Road 7.00
Follow-up
Time (tf)
2.60
3.30 .
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
X XXXXXXXXXXXXXXXXXX X.K XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
WorkSheet for TWSC Intersection
-------------------------------------------
Step 1: RT from Minor Street NB
Conflicting Flows:
(vph)
274
Potential Capacity:
(pcph)
1006
Movement Capacity:
(pcph)
1006
Prob. of Queue -free
State:
0.97.
---------------------------------------------
Step 2: LT from Major
Street
WB
---------------------------------------------
Conflicting Flows:
(vph)
548
Potential Capacity:
(pcph) -
871
Movement Capacity:
(pcph)
871
Prob. of Queue -free
State:
_ 0.99
---------------------------------------------
Step 4:_LT from Minor
Street
NB
---------------------------------------------
Conflicting Flows:
(vph)
1082
Potential Capacity:
(pcph)
- 215
Major.LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance
Factor:
0,99
Capacity Adjustment
Factor
due to Impeding Movements
0.99
Movement Capacity:
_____________________________________________
(pcph)
213
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
XXXXXXXXXXXXXX#X#XX#XXXXXXXXXXXX##Y###########XX#XXXX###XY######'
Intersection Performance Summary
F1owRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ______ ____________ ______ -------
NB L 14 213 18.1 C
8.8
N8 R 26 1006 3.7 A
WB L 7 871 4.2 A 0.0
Intersection Delay = 0.3
Center For
Microcomputers
In Transportation
Center For Microcomputers
In Transportation
HCS: Unsignalized Intersection
Release
2.1
Page 1 j
HCS: Unsignalized Intersection Release 2.1
Page 2
Z###Z##XZYYZZ###YZZZ##Y###Z#######ZZZZZ#ZXZ##ZZ##ZXY##ZXYZZZ#ZYX
XZZ##YZZY#YY##ZZ#ZZYXZ#Y#XZ#Y##ZZYY#ZZ#ZZZZZZZZZX##Z##Z#YXY#ZZZX
File Name ................
Streets: (N-S) office drive
(E-W)
drake
"
Major Street Direction....
EW
WorkSheet for TWSC Intersection
Length of Time Analyzed...
60 (min)
________________________________________________________
Analyst ...................
mjd
Step 1: RT from Minor Street
NB SB
Date of Analysis..........
18 96
long
-----------------------------------------------------
Conflicting Flows: (vph)
—
200
Other Information.........
existing
short
am pm
Potential Capacity: (pcph)
1096
Two-way Stop -controlled
Intersection
Movement Capacity: (pcph)
1096
Prob. of Queue -free State:
1.00
' Eastbound
Westbound
; Northbound ; Southbound
--------------------------------------------------------
L T
R; L T
R; L T
R; L _ T R
,____
Step 2: LT from Major Street
________________________________________________________
WB EB
,____ ____ ----
No. Lanes 0 2<
i---- ---- .----
01 1 2
,---- ____
0;" 1 0
---- __-- ---_
1; 0 0 0
Conflicting Flows: (vph)
400
Stop/Yield ;
N; -.
N; -
,
Potential Capacity: (pcph) -
1046
Volumes 397
31 6 439
4
4: I
Movement Capacity: (pcph)
1046
PHF" .9
.9; .9 .9'-
9
9;
Prob. of Queue -free State:
0.99
Grade 0
,
0
i 0
,
0
________________________________________________________
MC's (%) -0
0: 0 0
i. 0
Oi"
Step 4: LT from Minor Street
NB
.
-SB
-
Cv's (%) 0
0; .0 0
0
0; -
Conflicting Flows: (vph)-
844
PCE's1.-
1.1 1.1
' 1 1 -
1. t;
Potential Capacity: (pcph)
306 -
-
----1_1
-'----------------'-------------------------'---'----_____-------
Major LT, Minor TH
Impedance Factor:
0.99 "
"
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
Adjustment Factors
due to Impeding Movements
0.99
"
Movement Capacity: (pcph)
304
Vehicle
Critical
Follow-up
--------------------------------------------------------
Maneuver -
Gap (tg)
Time (tf)
-
-
__________________________________________________________________
Left Turn Major Road
-
5.50
2.10
Right Turn Minor Road
.5.50
2.60 -
Center For Microcomputers
In Transportation
Through Traffic Minor Road
6.50
3.30
HCS: Unsignalized Intersection Release
2.1 -
Page 3
Left Turn Minor Road -
7.00
3.40
I�
Intersection Performance
Summary
-
F1owRate MoveCap SharedCap
Avg.Total
Delay
- i
Movement v(pcph) Cm(pcph) Csh(pcph)
----L --- ----
- --304---- ------
Delay LOS
--------
By App
4--
NB
-C -----
12.0
-------
7.6
NB R 4 1096
3.3 A
WB L 8 1046
3.5 A
0.0
-
-
Intersection Delay =.
0.1
-
Center For
Microcomputers
In Transportation
i
Center For Microcomputers
In Transportation
HCS: Unsignalized Intersection
Release
2.1
Page 1
HCS: Unsignalized Intersection Release
2.1
Page 2 -
XZZY##XXXXXXZXX#XZZYZ#XXXXXZZZZZZZXXZZXZYYXX#XYYZXXXXY##XYZYYXXX
ZZZZZZZYXZZ#YYYXXXXXXXZZXZZZYXXXXXYYXXX
YYXXYXXXXXXXXXXXXYXYYYYX#
File Name ................
I
Streets: (N-S) site drive
(E-W)
drake
Major Street Direction....
EW
WorkSheet for,TWSC Intersection
Length of Time Analyzed...
60 (min)
--------------------------------------------------------
Analyst...................
mjd
Step 1: RT from Minor Street.
NB SB
Dateof Analysis..........
' Other Information........
long
--------------------------------------------------------
Conflicting Flows: (vph)
274
existing
short
am
pm i
.. '
_
Potential Capacity: (pcph)
1006
Two-way Stop -controlled
Intersection
Movement Capacity: (pcph)
1006
Prob. of Queue -free Stater
0.99
Eastbound
I Westbound
Northbound ;
Southbound
. L T
R1 L T
'=---
R; L T
'
R;
L T R -
Step 2: LT from Major Street
--------------------------------------------------------
WB - EB
---- --------
No-Lanes 0 -2<
---- ----
0; 1 2
---- ----
0; 1". 0
----'
1;
0 0 0
Conflicting Flows: (vph)
547
Stop/Yield,: -
N1
N;
1
I
Potential Capacity: (pcph)
872
Volumes 541
6; 7 534
1
8;
-
Movement Capacity: (pcph)
872
PHF•9
.9i .9 .9
.9
.91
Prob. of Queue -free State: -
0.99
Grade0-
I 0
i 0
0 _
--------------------------------------------------------
MC's (%) - 0 -
0; 0 0
0
0;
..
Step 4:LT from Minor Street
NBSB
SU/RV's (%)I "0
01 0 0
- 0 -
01
- _
-----------------------------------------
-----------
CV's (%) 0'
0; 0 0
0
01
I
Conflicting Flows: (vph) ..
1085
PCE's; 1.1 1.11
1.1 1.1
; 1.1
1.1;
Potential Capacity: (pcph)
214
.
-----------------------------------------------------------
-------------
Major. LT. Minor TH
'
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
Adjustment Factors
due to Impeding Movements
0.99
Movement Capacity: (pcph)
212
Vehicle
Critical
Follow-up
--------------------------------------------------------
Maneuver
---------------------------------------------------------------
Gap (tg).
Time (tf)
.
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60 -
Center For Microcomputers
In Transportation
Through Traffic Minor Road
6.50
3.30
HCS: Unsignalized Intersection Release
2.1
Page 3
Left Turn Minor. Road
7.00
3.40
i
YYYY#YYYXXXXYXXXXXXXXXXXXYY#X#XXYYYYYXXYXXXX
XXXXXYYYYYXXXXXXXXY#
--
Intersection Performance
Summary
F1owRate MoveCap SharedCap
Avg.Total
Delay
.
-
Movement v(pcph) Cm(pcph) Csh.(pcph)
-------- ------ ------ ------
Delay LOS
------------
By App
NB L 1 212
------
17.1 C
---------
5.1
NB R 10 1006
3.6 A
11
I
WB L 9 872
4.2 A
0.1
Intersection Delay -
0.1
-
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
YX###Y#XXXYX#YXX#Y#YXYYXXXXXXYYYYtYY#YY###XXYXYY#YY#Y#Y#XXX#XXXX
File Name ................
Streets: (N-S) site drive (E-W) drake
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 6/18/96
Other Information......... existing short long am pm
.Two-way Stop -controlled Intersection
____-- ----
Eastbound Westbound Northbound Southbound
L T R; L T R; L T R; L T R
---- --- ----I --- --------'---- ---- --- ---- ----
No. Lanes 1 0 2< 0; 1 2 0; 1 0 1; 0 0 0
Stop/Yield ; N; - N; ;
Volumes 396 3I 3 440 1 4
'PHF .9 .9; .9 .9 1 .9 .9:
Grade - 0 i 0 0 0
MC's (%) ; 0 0; 0 0 ; 0 0;
SU/RV's 0 0; 0 0 0 _ 0;
CV's (%) 0 0� 0 0 0 0:
PCE's 1.1 1.1; 1.1 1.1 1.1 1.1;
------------------------------------------------------------------------
Adjustment Factors
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------------------------------------------------------------
Left Turn Major Road 5.50 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.50 3.30
Left Turn Minor Road 7.00 3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2-1 Page 2
YXYZYYXYXX#XXYxXxXYXXY#Y#x:zzxxxYXYYYYzzXXxzzXzzxxzzzxx#XYYYYXYY
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
200
Potential Capacity: (pcph)
1096
1 Movement Capacity: (pcph)
1096
Prob. of Queue -free State:
1.00
-------------------------------------------------------
Step 2: LT from Major Street
----------------------------------------------
WB EB
---------
Conflicting Flows: (vph)"
399 -.
Potential Capacity: (pcph)
1047
Movement Capacity: (pcph)
1047
Prob. of Queue -free State:"
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
NB SB.
--------------------------------------------------------
Conflicting F1"ows: (vph)-
840
Potential Capacity: (pcph)
307
Major LT. Minor TH
Impedance Factor:
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
306
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
#YXX#XXxXY####XXXXXXYXX#YY#YXXXXxX#XY#Yx#X#X#XX#XXX#xYYXYYXY#X#X
Intersection Performance Summary
F1owRate MoveCap SharedCap
Avg.Total
Delay
Movement
v(pcph) Cm(pcph) Csh(pcph)
Delay
LOS By Apo
------ ---------
--------
NB L
------ ------ ------
1 306
------------
11.8
C
5.0
NB R
4 1096
3.3
A
WB L
3 1047
3.4
A 0.0
Intersection Delay =
0-0
.
HCS: Unsignalized Intersections Release 2.1c Page
n CCCCC ¢OC CnCIInIIn====CCC CC C===CCC==C=C=v=`==CCCCnnnCCCCCCCCCCCOCCCCC
Center IIFor IIMicrocomputers InTransportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
v ¢ IIII vcIIIIcav=aIIIIIIIICIIcnII¢¢eve ¢¢¢¢¢¢avII=a¢¢nnII¢¢¢II¢II �IIII IIIIII ¢IIn=__`====IIIIII
Streets: (N-S) COLLEGE (E-W) SITE DRIVE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis........ 6 14/96
Other Information........ ST LT PM
Two-way Stop -controlled In errection
E 6II6C6CCII---vvnnvCvv=vvvn
¢¢nnvvvvvv¢ --vvn nvvvv CC L -�v nvvv-- ¢v¢ vIICnnCC6CC C66
LNorthbound I LSouthbound I LEastboundR I LWestboundR
No. Lanes 0 3 < 0 1 0 0 0 1 0 0 0 1 0 0 1
Stop/Yield
Volumes
PHF
Grade
MCI ($)
SU/RV-s ($)
CVIa ($)
PCE-s
N
606 5
.95 .95
0
---------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road _
6.50
3.30
Left Turn Minor Road
- 7.00
3.40
HCS: Unsignalized Intersections Release 2.1c
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
--------------------------------------------------------
Conflicting Flows: (vph) 215
Potential Capacity: (pcph) 1077
Movement Capacity: (pcph) 1077
Prob. of Queue -Free State: 1.00
--------------------------------------------------------
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
-------- ------ ------ ------ ------- ------- ----- ---------
3.4
WB R 3 1077 3.4 0.0 A
Intersection Delay ¢ 0..0 Dec/veh
Page 2
ECS: Unsignalized Intersections Release 2.1c Page
Center ForMicrocomputersIn Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) COLLEGEccc===c======ccncv=====c(E-W) OTELcDRIVE ac
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis........ 14/96
Other Information........ EX ST LT AM
Two-way Stop -controlled Intersection
=�eaeveee------------as-ems
LNorthboundd I LSouthboundd I LEastboundR I LWestboundR
No. Lanes 0 3< 0 0 0 0 0 0 0 0 0 1
Stop/Yield N N
Volumes 808 1 5
PEF .95 .95 - .95
Grade 0 0
MCI 8 M
SD/RVIs M
CVIa M
PCE.8 1.10
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
__________________________________________________________________
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
_ 5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1c Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph) 284
Potential Capacity: (pcph) 994
Movement Capacity: (pcph) 994
Prob. of Queue -Free State: 0.99
--------------------------------------------------------
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (peph)(sec/veh) (veh) -_-- (sec/veh)
_____________---------
3.6
WB R 6 994 3.6 0.0 A
Intersection Delay - 0.0 sec/veh
HCS: Unsignalized Intersections Release 2.1c Page
...........
aannn
CenterForMicrocomputersaInTransportationaa==_-=a-annnnna=--===_a
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
__= v c = = nnn-c-==-vccvcccccc===-ccc acne==cee=vvavc
Streets:a(N-S) COLLEGEaa (E-W) HOTEL DRIVE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis.......... 14/96
Other Information........ ST LT PM
Two-way Stop -controlled Intersection
can------_ - -c c = a-= avcan====mvcvv
LNorthboundd alaLSouthboundd al LEastboundR I LWestboundR
No. Lanes 0 3 < 0 0 0 0 0 0 0 0 0 1
Stop/Yield N N
Volumes 608 1 1
PHF 1 .95 .95 .95
Grade
MC' a M
SU/RV's M
CV's M
PCE's
.0
0
I I 1 1.10
----------- _-------------- _-------------- _--------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
_ Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road -
- 5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1c
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WE EE
Conflicting Flows: (vph) 214
Potential Capacity: (pcph) 1079
Movement Capacity: (pcph) 1079
Prob. of Queue -Free State: 1.00
--------------------------------------------------------
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total . Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (peph)(see/veh) (veh) (sec/veh)
________ ______ ______ ______ _______ _______ _____ ________
3.3
WE R 1 1079 3.3 0.0 A
Intersection Delay 0.0 sec/veh
Page 2
HCS: Unsignalized Intersections Release 2.1c
Page
Center =For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
StreetsIIe(N-S) COLLEGE(E-W) THUNDERBIRD
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis.......... 6/14/96
Other Information.......ST IT AM PM
Two-way Stop -controlled Intersection
R Northbound
Southbound
Eastbound
Westbound
L T R
L T R
L T R
L T R
No. Lanes
---- ---- ----
0 3 < 0
---- ---- ----
1 0 0
---- ---- ----
0 0 0
---- ---- ----
0 0 1
Stop/Yield
N
N
Volumes
790 18
33
43
PH? -
.95 .95
.95
.95
Grade
0
00
MC'e ($)
SU/RV-s ($)
CV'a ($)
PCE's
-----------------------------------------------------------------------
1.10
1.10
Adjustment Factors
Vehicle -.
Critical
- Follow-up .
Maneuver
Gap (tg)
- Time (tf)
------------------------------------------------------------------
Left Turn Major Road -
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50 -
3.30
Left Turn Minor Road
7.00
3.40
HCS: Unsiga=lized Intersections Release 2.1c Pag
ntosectionlea1age 2
Worksheet for TWSC .Intersection
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph) 287
Potential Capacity: (pcph) 991
Movement Capacity: (pcph) 991
Prob. of Queue -Free State: 0.95
Step 2: IT from Major Street SB---------
NB
----------------------------------------
Conflicting Flows: (vph) 851
Potential Capacity: (pcph) 599
Movement Capacity: (pcph) 599
Prob. of Queue -Free State: 0.93
________________________________________________________
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
-------- ------ ------ ------ ------- ------- --------------
3.8
WB R 50 991 3.8 0.0 A
SB L 39 599 6.4 0.1 B 6.4
Intersection Delay = 0.4 sec/veh
HCS: Unsignalized Intersections Release 2.1c Page 1
a a aca=vv vvv as =aca=van =avva=aavvcv=aaacaaaaavcaccaa
a aca sac aavav v= aaa a vc=
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, PL 32611-2083
Ph: (904) 392-0378 -
c aaa va aavvvvaeea=sacs=aaava=aaaaaa=aaavavaaaanavccc=aavvvacaa
Streets: a(N-S)aCOLLEGE (E-W) THUNDERBIRD
Major Street Direction.... NS
Length of'Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis.......... 14/96
Other Information ........ .EX ST LT PM
Two-way Stop -controlled Intersection
aaaaaaaaaa as=Northbound a Southboundaa aaEastboundaa Westbound
.L T R L T R L T R L T R
---- ---- --------.---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 0 3 < 0 1 0 0 0 0 0 0 0 1
Stop/Yield N N
Volumes- 596 8 21 _ 30
PHF .95 .95 .95 .95
Grade 0 0 0
MC's M
SU/RV's M
CV's M
PCE's 1.10 1.10
-----------------------------------------------------------------------
AdjustmentFactors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road -
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
RCS: Unsignalized Intersections Release 2.1c Page 2
aaavaccccvavccvvcaa=aaaacaaaaaaaaaaavaavaacaaccaaaaaaa=aaaacaa=aavaaeaa
'Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
213
Potential Capacity: (pcph)
1080
Movement Capacity: (pcph)
1080
Prob. of Queue -Free State:
0.97
--------------------------------------------------------
Step 2: IT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
635
Potential Capacity: (pcph)
782
Movement Capacity: (pcph)
782
Prob. of Queue -Free State:
--------------------------------------------------------
0.97
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
(sac/veh)
-------- ------ ------ -------------
------- -----
---------
3.4
WB R 35 1080 3.4
0.0 A
SB L 24 782 4.7
0.0 A
4.7
Intersection Delay
0.3 sec/veh
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4a 06-16-1996
Center For Microcomputers In Transportation
--------------- Streets: (E-W) (E-W) drake (N-S) college
Analyst: Matt File Nam
Area Type: Other 6-18-96 am pm
Comment- existing short long
______________________________________
________________
Eastbound ' Westbound ' Northbound Southbound
L T R L T R; L T R L T R
--------l---- --------'---- ---- --- ---- ---- ----
No. Lanes 1 2 1 1 2 1 1 3 < 1 3 1
Volumes 294 497 157: 108 406 220; 157 1308 54; 112 771 159
PHF or PK1510.90 0.90 0.90:0.90 0.90 0.9010.90 0.90 0.90:0.90 0.90 0.90
Lane Width 112.0 12.0 12.0;12.0 12.0 12.0;12.0 12.0 :12.0 12.0 12.0
Grade . 0 0 i 0 0
% Heavy-Veh; 1 1 1; 1 1 1; 1 1 1; 1 1 1
Parking ;(Y/N) N ;(Y/N) N ;(Y/N) N .:(Y/N) N
Bus Stops ; 0: - 0; 0; 0
Con: Peds. 0;_ - 0; 0; 0
Ped Button ;(Y/N) Y 23.5 sl(Y/N) Y 26.5 s:(Y/N) Y 20.5 s;(Y/N) Y 20.5
Arr Type ;. 3 3 3; . 3 -. 3 3; 3 5 3 5 3
RTOR Vols 0: 0; 0; 0
Lost Time :3.00 3.00 3.0013.00 5-00 3.00;3.00 3.00 3.00;3.00 3.00 3.00
Prop. Share; 1 I
Prop. Prot.; 1
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * * :NB Left
Thru * - Thru
Right * Right
Peds Peds -
.WB Left * * ;SB Left
Thru * - Thru * -
Right * Right
Peds Peds -
NB Right ;EB Right
SB Right * 1WB Right
Green 13.OA 27.OA ;Green 12..OA 30.OP
Yellow/AR - 4.0 5.0 :Yellow/AR 4.0 5.0
Cycle Length: 100-secs Phase combination order: #1 #2 #5 #6
------------ ------------------------------- ____________________________
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS_ Delay LOS
----- ---- ------- ----- ---- ----- --- ----- ---
ES L 391 1787 0-636 0.310 24.5 C 21.9 C
T - "1091 3762 0.532 0.290 23.1 C
R 720 1599 0..242 0.450 12.9 B
WB L - 349 1787 0.344 0.310 13.0 8 18.3 C
T 1091 3762 0.434 0.290 22.1 C
R 720 1599 0.339 0.450 13-7 B
NB L - 308 17.87. .0.565 0.290 14.3 B 20.1 C
TR- 1795 5610 0--927-.0.320 20.7 C
SB. L 308 1787 0.403 0.290 15.2 C 14.2 B
T 1806 5644 0.522 0.320 14.6 B _-
R 784 1599 0.226 0.490 11.1 B
Intersection Delay = 18.7 sec/veh Intersection LOS = C
Lost Time/Cycle. L = 9.O sec Critical v/c(x) = 0.779
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4a 06-1871996
Center For Microcomputers In Transportation
Streets: (E-W) drake (N-S) college
Analyst: Matt File Name:
Area Type- Other 6-16-96 am pin
Comment: exis in short long
Eastbound ' Westbound ;. Northbound Southbound
L T R; L T R L T R: L T R
---- ----:---- ---- ----I---- ---- --- ---- ---- ----
No. Lanes 1 2 1 1 2 1; 1 3< 1 3 1
Volumes 256 540 303: 172 575 145; 323 1593 100; 268 1986 371
PHF or PK15;0-90 0.90 0.90:0.90 0.90 0-90:0.90 0.90 0.90:0.90 0.90 0.90
Lane Width 112.0 12.0 12-0;12.0 12.0 12.0;12.0 12.0 :12.0 12-0 12.0
- Grade 0 i 0 0 _ ; 0
% Heavy Veh; 1 1 11- 1 1 1; 1 1- 1; 1 1 1
Parking ;(Y/N) N .;(Y/N) N ;(Y/N) N :(Y/N) N
BusStops0; 0; 0; - 0
Con- Peds ; 0; 0; 0: 0
Ped Button :(Y/N) Y 23.5 s;(Y/N)'Y 26.5 s:(Y/N) Y 20.5 s:(Y/N) Y 20.5.
Arr Type 3 3 3; -3 3 3; 3 5 3 5 .3
RTOR Vols 1 0; 0; 0: 0
Lost Time 13.00 3.00 3.00;3.00 3.00 3.0013.00 3.00 3-00:3.00 3.00 3.00
Prop. Share; I I
- Prop: Prot-;
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * * ;NB Left
j Thru * Thru
Right * Right * '
J Peds Peds
WB Left * * - _ :SB Left
Thru * Thru
Right * Right
Peds Peds
NB Right ;EB Right
SB Right * jWB Right -
Green 16.OA 23.OA _ ;Green 20.OA 43-OP
Yellow/AR 4.0 5-0 ;Yellow/AR 4.0 5.0
j Cycle Length:.120 secs Phase combination order: #1 #2 #5 #6
_______________________________________________________________________
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C -Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ----- ----- ----- --- ----- ---
EB L 316 1787 0.899 0.308 42.8 E 34.8 D
T 784 3762 0.804 0.208 38.6 0
R 653 1599 0.516 0.406 20.8 C
WB L 316 1787 0.604 0.308 23.9 C 34.4 D
T- 784 3762 0.856 0.208 41.3 E
R 653 1599" 0.247 0.408 17.8 C
NB L 376 1787 0.955 0.375 54.3 E 29.5 D
TR 2097 5593 0.986 0.375 25.3 D
SB L 376 1787 0.793 0.375 33.6 D
T 2116 5644 1.148 0.375
R - 866 1599 0.476 0.542 13.2 B
Intersection Delay = * (sec/veh) Intersection LOS =
;- (g/C)*(V/c) is greater than one. Calculation of D1 is infeasable.
APPENDIX A
Table 3
Short Term Peak Hour Operation
Level of
Service
Intersection
AM
PM
College/Drake (signal)
C
D
College/Thunderbird (stop sign)
,.WB RT
A
A.
SB LT
A
B
College/Motel Drive (stop sign)
WB RT
A
A
College/Consolidated Drive (stop sign)
WB RT
A
A
Drake/Consolidated Drive (stop sign)
NB RT
A
A
Table 4
Long Term Peak Hour Operation
Level of Service
Intersection AM PM
College/Drake (signal) D
College/Thunderbird (stop sign)
WB RT A
SB LT B
College/Motel Drive (stop sign)
WB RT A
College/Consolidated Drive (stop sign)
WB RT A
Drake/Consolidated Drive (stop sign)
NB RT A
* Level of service calculation infeasible
be level. of service F.
A
B
A
A
A
This is considered to
Ilk
LONG TERM PEAK HOUR TRAFFIC Figure 3
nm i rm
SHORT TERM PEAK HOUR TRAFFIC
Figure 2
Table 1
Existing Peak Hour Operation
Level of
Service
Intersection
AM
PM
College/Drake (signal)
C
College/Thunderbird (stop sign)
WB RT
A
A
SB LT
A
B
College/Motel Drive (stop sign)
WB RT
A.
A
College/Sinclair Drive (stop sign)
WB RT
A
A
Drake/Sinclair Drive (stop sign)
NB LT
C
C
NB RT
A
A
WB LT _
A
A
Drake/Office Drive (stop sign)
NB LT
C
C
NB RT
A
A
WB LT
A
A
* Level of service calculation infeasible.
This
is considered to
be level of service F.
Table 2 .
Trip Generation
Daily A.M. Peak P.M. Peak
Land Use Trips Trips Trips Trips Trips
in out in out
Convenience/gas store
8 fueling positions 1300 45. 45 54 54
r�9
id
�
J111�
aa
000
^
220/145LO
406/575
% 108/172
— 733/891
/,-- 3/7 DRAKE ROAD
— 732/886
/— 6/5
N
—f 294/256 -1
}
660/902 -�-
�/
661/904 -�
497/540 -�-
—� 157/303 -
M M o
�\�
3/6 -
\�
3/6
N N
�o
M
'1ff�
�-3/6
Counts
are for two
access on each street.
f r
z
CD
WE)
>
�L
LO
W
C7
W
J
J
O
U
1 /5
a
C)
Cq
\\\
0/1
�
`
2 /24
THUDRIVE NDERBIRD
30/43
�--
W 00
\�
16 443 —
12/4 - �
ao N
LO S
Legend:
AM PM
Denotes Lanes
1996 PEAK
HOUR
TRAFFIC
AND GEOMETRY Figure 1
Planning efforts should focus on providing
additional capacity at this intersection or
alternate routes.
In summary, the proposed widening, access control, and re-
development projects provide a unique opportunity to facilitate and
expedite improved roadway operations. If pursued as currently
proposed the following con occur: 1) the City of Fort Collins can
provide substantial roadway improvements, and 2) Sinclair can
provide a modern, efficient convenience/gas store. This will
result in a benefit to the general public with improved traffic
operations, easy/efficient access, and increased safety in the
study area.
This is reinforced by the fact that most site traffic will be drawn
from the passing traffic stream. Provision of dual east/west left -
turn lanes on Drake Road will improve the operation of this
intersection into acceptable categories.
CONCLUSIONS
Based upon the above documented analyses, investigations, and
findings the following can be concluded.
1. Existing conditions are acceptable in the immediate
area of the site with the exception of the
College/Drake intersection which operates at LOS F
during the afternoon peak hour.
2.. Site generated traffic will primarily be drawn from
the passing traffic streams.
3. Driveway activity at the Sinclair development is
estimated at 90 morning peak hour trips, 108
afternoon peak hour trips and 1300 trip ends per
day. This is considerably higher than the trip
generation at the existing facility.
4. The proposed widening at the College/Drake
intersection will provide additional roadway
.capacity and reduce the number of vehicles cutting
across the Sinclair site. This is due to the fact
that the northbound right turn from College Avenue
to Drake Road will no longer be blocked by through
vehicles in a shared lane.
5. Short term operations are expected to be acceptable
from a level of service standpoint. All stop sign y
controlled movements are expected to operate at LOS
B or better, while the College/Drake intersection /
will operate LOS D or better.
6. The proposed access consolidations will result in
fewer vehicular, pedestrian, and bicycle conflicts,
thereby, decreasing the area's accident potential.
7. Closing the frontage road to the north of
Thunderbird Drive will minimize stacking conflicts
by moving this traffic to the east. Therefore, a
reduction in congestion potential in the area of the
College/Thunderbird intersection can be expected.
8. Long term traffic operations are expected to be
acceptable at all intersections with the exception
of the College/Drake intersection. At this
intersection LOS F operations can be expected, if
the anticipated traffic volumes are realized.
Sinclair development is expected to generate 90 morning peak hour
trips, 108 afternoon peak hour trips and 1,300 trip ends per day.
It should be noted that most site related traffic is expected
to be drawn from the passing traffic stream. This is
characteristic of the proposed land use. Given this fact, site
traffic distribution should be generally consistent with the
directional distribution of the adjacent traffic stream.
Additionally, no reductions have been taken to account for traffic
currently generated by the existing Sinclair station. Accordingly,
a conservative analysis is presented.
BACKGROUND TRAFFIC
Short term traffic volumes (1996/1997) were developed using
the existing traffic counts, site traffic volumes, and the modified
access scheme. Current traffic volumes were increased
appropriately. An insignificant increase in roadway traffic
volumes is expected due to site traffic.
Long term traffic was estimated by factoring current traffic
upward by 20 percent. This is almost a one percent per year
increase. This is considered reasonable for year 2015 conditions.
Total future peak hour traffic is presented on Figure 2 for short
term conditions with long term conditions shown on Figure 3.
FUTURE OPERATING CONDITIONS
Short Term
Capacity analyses were conducted at all key intersections to
assess operations with the proposed Sinclair development, the
widened College/Drake intersection, and the modified access scheme
along College Avenue and Drake Road. Short term operating
conditions are presented in Table 3. Calculation forms are
provided in appendix B. As shown, acceptable conditions can be
expected in the short term with the College/Drake intersection
expected to operate at LOS D or better. For the most part,
however, all other locations will operate at LOS A.
Long Term
Long term operations were evaluated using the traffic volumes
shown on Figure 3. Calculation forms are provided in Appendix C.
This operation is shown in Table 4. This analysis indicated that
all minor (limited turn) intersections will operate at LOS B or
better during the peak hours. Less than desirable operations may
be experienced at the College/Drake signalized intersection. This
will occur if traffic volume projections materialize as assumed and
no additional roadway capacity is provided. In any event, site
traffic is considered to be negligible at the College/Drake
intersection and is not expected to adversely impact operations.
stop sign controlled intersections, LOS C or better operation is
being experienced.
PROJECT DESCRIPTION
The proposed improvements reflect three independent yet
related actions. These actions are described below.
1. Widening of the College/Drake intersection to
provide dual left turn lanes and exclusive right
turn lanes in both directions on College Avenue.
This is expected to minimize the number of vehicles.
cutting through the Sinclair site, since the
northbound right turns will have an exclusive lane.
On Drake Road, a raised median and a bike lane will
be installed in the immediate area of the
intersection. The median will extend through the
study area on the east leg of Drake Road.
2. In conjunction with the planned improvements, the
number and location of access points will be
modified along College Avenue, Drake Road and
Thunderbird Drive. Along College Avenue, two
driveways are proposed between Thunderbird
and Drake. One to serve the Sinclair site and the
motel. The other is to the south serving the motel
and the Moot House restaurant. The north leg of the
Thunderbird/Frontage Road intersection will also be
closed. The two Sinclair site drives and the drive
serving the retail/office development to the east
of the Sinclair will be consolidated. This will
result in a shared driveway along Drake Road. The
office/commercial area to the east of the Sinclair will
continue to retain an access to Drake Road at their east
property line. All driveways to College Avenue and Drake
Road will be limited to right -in and right -out movements.
3. The existing Sinclair station will be demolished and
replaced with a gas/convenience store. Eight
fueling stations and a 3000 square foot convenience
store are planned.
All of the above activity is expected to occur concurrently. It
is expected to be completed later in 1996 or early 1997.
SITE TRAFFIC
Site generated traffic was estimated using the Institute of
Transportation Engineers (ITE) publication Trip Generation, Fifth
Edition and the 1995 Update to this publication. Resultant site
traffic volumes are presented on Table 2. As shown, the proposed
co
w
LO
O
Co
0
Q
0
0
U
0
z
a
w
J
w
0
w
a
w
J
0
N
N
N
W
a
V
J
W
0
mi
■
r■
r
MEMORANDUM
v
CM
O
`n
TO: Tom
Richards, Sinclair Oil Corporation
City
of Fort Collins
6
r
FROM: Matt
Delich -9e
rn
DATE: June
21, 1996
SUBJECT: Expansion of Sinclair Station and access
consolidation in the southeast corner of
College/Drake intersection (File: 9633MEM1)
O
N
0)
co
This technical memorandum evaluates the traffic impacts
0 of a new Sinclair Station/Convenience Store in the southeast
corner of the College/Drake intersection. The existing
w Sinclair Station will be replaced with an expanded gas/C-Store
Z facility. The expansion is expected to occur in conjunction
a with the city's planned widening at the College/Drake
intersection. An access consolidation program is also
planned. This will result in fewer overall access points,
shared driveways, and some restricted turning movements.
Current and future conditions are described and evaluated in
the following sections.
EXISTING CONDITIONS
Current operating conditions were assessed using the
morning and afternoon peak hour traffic volumes collected as
part of this study. This information is presented on Figure
1. The geometry at the College/Drake intersection is also
shown in Figure 1. The intersection is signalized.
z. Historically, it has been reported that vehicles bypass the
wsignal by cutting through the Sinclair site from northbound
z College Avenue to eastbound Drake Road.
a
W Intersection operations were also evaluated at all
Z driveways from Thunderbird Drive to Drake Road along College
aAvenue and from College Avenue to the driveway serving the
local commercial development east of the Sinclair site along
°a Drake Road. Current peak hour levels of service are shown on
Z Table 1. Calculation forms are provided in Appendix A.
19
Acceptable operations are currently being experienced at all
locations except the College/Drake intersection which
Ca
Ca operates at level of service(LOS) F during the afternoon peak
a: hour. Rather than assigning a specific number of right turns
U. which would occur during the perpendicular left -turn phase,
F- the evaluation assumed that a right -turn arrow existed for the
exclusive right -turn lanes. This technique would allow right -
turns -on -red only. during a safe phase of the signal cycle.
This approach seemed conservative and appropriate. At all