2. The sprinkling requirement of the two duplexes noted will be dropped from the site plan.
3. Done.
4. The private Drive will be signed as required.
H. U. S. West:
See Jim Sell Documents and response.
2. Done.
Discussions have been held with US West to re -allow the cantilevered decks along the south
property line. Documentation from other users of the easement there allowing US West to have
access over the easement is in the process of acquisition by TST. With that documentation in
hand US West will allow the decks to cantilever two feet into the easement.
1. Police:
Address locations will be located for ease of visibility.
J. Mapping and Drafting:
See Comments and Documents submitted by TST under separate cover.
Please let me know if there are any other needs for information or if you have further questions.
Cordially,
Robert Sutter
Principal
RAS/rs
cc: LandSource LLC
Enc
Mr. Mitch Haas
October 9, 1996
Page Two
B. Fencing Details are submitted by Jim Sell Design under separate Cover.
IV. --- COMMENTS FROM OTHER REVIEWING AGENCIES ---
A Engineering:
See submittals and written responses under separate cover from TST Consulting Engineers.
B. Parks:
1. Park Fees are acknowledged.
2. Done.
3. Discussions with the City have been initiated concerning easements required and proper
documentation and agreements will be provided accordingly.
C. Zoning:
1. Done.
2. Done.
3. Done.
D. Building Inspection:
Comments received from Building Inspection are acknowledged.
E. Cablevision:
See Comments and Documents from TST under separate cover.
F. Light and Power:
See Comments and Documents from TST under separate Cover.
G. Poudre Fire Authority:
1. Fire Hydrants have been shown on the Utility Plans Submitted by TST under separate cover.
P. O. Box 271217
Fort Collins, Colorado 80527
October 9, 1996
Mr. Mitch Haas, Project Planner
Current Planning
Community Planning and Environmental Services
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522-058C
RE: Response to Staff Comments On the Greens at Collindale PUD, Final (#8-96A) Dated 09/20/96
Dear Mitch:
For ease of reference and review the format of this letter shall follow the same format of the referenced
letter in subject line above. This letter will address the Staff comments presented in that subject letter.
I. --- SITE PLAN COMMENTS --
A. Plan Comments:
1. All of the setback issues raised have been addressed on the revised plan. There was no conflict
at Lot 25 so there were no modifications made there.
2. Note # 8 has been modified and proposed street lighting has been shown on the revised plan.
3. Done.
4. Done.
5. Done.
6. Done.
II. --- LANDSCAPE PLAN COMMENTS ---
All issues relating to Landscape Plans have been resolved on plans submitted by Jim Sell Design.
They have also submitted a written response under separate letter head addressing Staff
Comments in this paragraph.
ELEVATION COMMENTS --
A. Final Elevations have not been modified from earlier submittal and are resubmitted.
AHGHI I tU I UHAL HOHIZL)N5 24w5 Homngw000 unve, Ft. conins, uu. ttw525