From: Christopher Culp <CJC@hei-kc.com>
To: 'Ted Shepard' <TSHEPARD@ci.fort-collins.co.us>
Date: Mon, Apr 17, 2000 3:59 PM
Subject: RE: Fort Collins Wal-Mart
Good afternoon, Ted --
Regarding the screening requirements: Randy and I have discussed your
requirements, and we should have no problem meeting them with the screening
already planned. We typically specify RTUs (about 4' high) on the stores in
Colorado (as opposed to a desiccant wheel unit and air handler that has a 9'
high box), so the screen walls that are planned should hide the rooftop
equipment without any trouble.
Randy and I did make it to the Mellow Yellow - I think we scared the workers
a little bit. I know Randy was a little nervous. (Ask Randy about his
"personalized" package of hemp wired papers we found.) My oboe's octave
keys are much cleaner now, and the gurgle in the upper register is gone.
Unfortunately, we didn't have time to hit the brewery.
Thanks again for taking time to meet with us last week. We want to make the
design review phase as smooth and simple as possible. Please do not
hesitate to call or e-mail any time if you have questions about our design.
Best regards,
Chris
Christopher J. Culp, P.E
Mechanical/Project Engineer mailto:cjc@hei-kc.com
Henderson Engineers, Inc. Direct Dial (913) 307-5412
11627 W. 79th Street Operator (913) 492-3377
Lenexa, KS 66214 Fax (913) 492-3428
Visit our web page at http://www.hei-kc.com
> -----Original Message -----
> From: Ted Shepard [SMTP:TSHEPARD@ci.fort-collins.co.us]
> Sent: Monday, April 17, 2000 4:07 PM
> To: christopherc@hei-kc.com
> Subject: Fort Collins Wal-Mart
> Hello Chris:
> I trust you found the Mellow Yellow for your rolling papers and that you
> had time to stop by one of our excellent micro -breweries.
> Regarding the Wal-Mart, it occurred to me after you left that I forgot to
> ask about any roof -top mechanical equipment. All roof -top equipment needs
> to be screened with screen walls as required on the P.U.D.
> This may factor into some of the construction drawings due to the need for
> roof penetration systems. I would hate to have you come back after the
> building is up and then install the necessary screens.
> Hopefully this won't be a problem. Thanks, Ted.