Loading...
HomeMy WebLinkAboutMULBERRY LEMAY CROSSINGS, LOT ONE, FILING ONE - FINAL PUD - 36-96D - CORRESPONDENCE - BUILDING EXTERIOR (3)Ted Shepard RE: Fort Collins Wal-Mart Page 11 From: Christopher Culp <CJC@hei-kc.com> To: 'Ted Shepard' <TSHEPARD@ci.fort-collins.co.us> Date: Mon, Apr 17, 2000 3:59 PM Subject: RE: Fort Collins Wal-Mart Good afternoon, Ted -- Regarding the screening requirements: Randy and I have discussed your requirements, and we should have no problem meeting them with the screening already planned. We typically specify RTUs (about 4' high) on the stores in Colorado (as opposed to a desiccant wheel unit and air handler that has a 9' high box), so the screen walls that are planned should hide the rooftop equipment without any trouble. Randy and I did make it to the Mellow Yellow - I think we scared the workers a little bit. I know Randy was a little nervous. (Ask Randy about his "personalized" package of hemp wired papers we found.) My oboe's octave keys are much cleaner now, and the gurgle in the upper register is gone. Unfortunately, we didn't have time to hit the brewery. Thanks again for taking time to meet with us last week. We want to make the design review phase as smooth and simple as possible. Please do not hesitate to call or e-mail any time if you have questions about our design. Best regards, Chris Christopher J. Culp, P.E Mechanical/Project Engineer mailto:cjc@hei-kc.com Henderson Engineers, Inc. Direct Dial (913) 307-5412 11627 W. 79th Street Operator (913) 492-3377 Lenexa, KS 66214 Fax (913) 492-3428 Visit our web page at http://www.hei-kc.com > -----Original Message ----- > From: Ted Shepard [SMTP:TSHEPARD@ci.fort-collins.co.us] > Sent: Monday, April 17, 2000 4:07 PM > To: christopherc@hei-kc.com > Subject: Fort Collins Wal-Mart > Hello Chris: > I trust you found the Mellow Yellow for your rolling papers and that you > had time to stop by one of our excellent micro -breweries. > Regarding the Wal-Mart, it occurred to me after you left that I forgot to > ask about any roof -top mechanical equipment. All roof -top equipment needs > to be screened with screen walls as required on the P.U.D. > This may factor into some of the construction drawings due to the need for > roof penetration systems. I would hate to have you come back after the > building is up and then install the necessary screens. > Hopefully this won't be a problem. Thanks, Ted.