HomeMy WebLinkAboutPARKWAY TOWNHOMES PUD - PRELIMINARY/FINAL - 9-96 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTChecksheet Parkway Townhomes Preliminary and Final PUD
The following check sheet is to be used in the preparation of a complete submittal of a Final PUD Plan:
X 1. Application (1 copy).
X 2. Filing fee ($2,808.00 + $1,088.00 (plat) _ $3,896.00)
(Per Staff, this to be submitted at a later date)
X 3. Site plan (25 folded copies).
X 4. Landscape plan (16 folded copies).
X 5. Final subdivision plat (21 folded copies).
X 6. Utility plans (10 unfolded copies).
X 7. Final drainage report and plans and grading plans (4 copies).
X 8. Other documentation as determined by special circumstance.
Land Use Breakdown (2 copies).
4.16
Checksheet Parkway Townhomes Preliminary and Final PUD
The following check sheet is to be used in the preparation of a complete submittal of a Preliminary PUD
Plan:
X Application (1 copy). OX
NA 2. Filing fee I......
(Per staff, this to be submitted at a later date)
X Legal description of property (2 copies on 8'h" X 11" sheet).
X A,• A current)ist of n mNstai
ddresses of all owners of record of real property within 500
500 feet. l 4$ 50) ✓
The APO LLabels were previously submitted.
X Planning objectives (25 copies).
X -'� Completed point charts (3 copies).
NA 7. a beet ( �apies)./Ut o�-ram
X ✓g. Architectural elevations (5 folded copies).
X a/�9. Site plan (25 folded copies).
X V...-10. Landscape plan (16 folded copies).
X 11. Utility plans (10 unfolded copies).,
NA 12. Street cross sections (5 unfolded copies).
X 13. Physiographic data (2 copies).
(Per staff, to be submitted at a later date)
X 14. Preliminary drainage report and plans and grading plans (4 unfolded copies).-
-X 15. Preliminary subdivision plat (21 folded copies).--t k
NA 16. Traffic impact analysis (4 copies).
NA 17. Hazardous materials impact analysis (4 copies).
X LA. Other documentation as determined by special circumstance.
Land use breakdown (2 copies).
4.12