HomeMy WebLinkAboutWEST PLUM STREET PUD - PRELIMINARY - 10-96 - CORRESPONDENCE - (3)9. The Poudre Fire Authority expressed concern with regard to the addressing of the units and
their accessibility for emergency response. The alley, in effect, becomes a fire lane for its
entire length; this is a concept PFA would be opposed to. In general, Roger of the PFA was
not sure how to address their concerns at this time. The PFA will need to be included in the
utility coordination meeting that Kerrie Ashbeck, of the Engineering Department, will set
up. For more information regarding Poudre Fire Authority's comments, please call Roger
Frasco at.221-6570.
10. A neighborhood meeting will be required prior to the submittal of any development request
involving this land. The Planning Department would make a geographical notification map
upon request to proceed with such a project. The developer would be responsible for
obtaining the names and addresses of property owners within the mailing area. The
developer pays the City fifty cents (50¢) per name for the mailing. The City would set up
the meeting and facilitate the discussion. This entire process generally takes three to four (3-
4) weeks to complete. For further information, please contact Mitch Haas of the Planning
Department at 221-6641.
4. Parkland Fees of $813 per dwelling unit will be due at the time of issuance of a building
permit. The closest neighborhood park to this site is Rogers Park, to the north. For further
information, please contact Randy Balok at 221-6364.
5. Existing utilities include a six-inch (6") water main and an eight -inch (8") sanitary sewer
main in W. Plum. These mains can be extended to the site at the developer's expense. You
would be required to provide complete looping of these lines to and from West Plum Street.
There is also an 8" water main in West Elizabeth, but no sanitary sewer. Plant Investment
Fees and Water Rights Acquisition fees are due at the issuance of building permit; for
information regarding these fees contact Mary Young at 221-6681. Water Conservation
Standards for irrigation of the common area will apply. Water and sewer extension plans
will need to be coordinated with all other utility and engineering plans. Please contact Roger
Buffington at 221-6681 with any questions regarding these comments.
6. The Engineering Department will have to hold you to public street standards on the alley;
this requires a twenty-eight (28') right-of-way, sidewalks, curbs, and gutters. You will have
to provide a four foot (4') wide sidewalk as well as a curb and gutter for the length of street
frontage along Plum Street. Street Oversizing Fees will be $584 per dwelling unit. It was
stated that you should incorporate provisions for access to the property to the south, and this
should not come off West Elizabeth Street. You will need to submit a traffic study which
will address, among other things, alignment of the curb cuts in your parking area with curb
cuts on the other side of the street. It was also stated that this proposal is difficult to
comment on at this time, as the City really does not have existing standards to review this
kind of plan. Consequently, you will need to schedule a meeting with engineering and all
the other utility departments (utility coordination meeting) to discuss the various issues
involved; this meeting should occur prior to submittal of preliminary plans. For more
information or clarification on these comments, please contact Kerrie Ashbeck at 221-6750.
Kerrie will coordinate the arrangement of the meeting.
7. The site is located in the Canal Importation Drainage Basin; the Storm Drainage Fee in this
basin is $6,181 per acre, subject to the runoff coefficient. Temporary on -site stormwater
detention will be required for any development of the site as Master Drainage Plan
improvements are not currently in existence. Flows can be released into the street system
at no greater than the two-year historic rate. If the parcel on the south is to develop, an
easement across the northern parcel will be necessary. Standard Drainage and Erosion
Control reports must be submitted; these reports must be prepared by a Colorado licensed
professional engineer. Stormwater drainage plans will need to be coordinated with all other
utility and engineering plans. For more information or clarification on these comments,
please contact Glen Schlueter at 221-6589.
8. You will have to comply with building code requirements for zero -lot line developments, or
provide the properly sized access easements between homes. You should also be careful to
make sure building, overhangs do not encroach upon setback requirements. For further
explanation of these comments, please contact Sharon Getz of Building Inspections at 221-
7640.
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: November 20, 1995
ITEM: Single family, infill subdivision on the 2600 block of West Plum
Street.
APPLICANT: Doug Viita Ken Merritt
P.O. Box 885 3521 W. Eisenhower Blvd.
Fort Collins, CO 80522 Loveland, CO 80537
LAND USE DATA: Request to subdivide a lot of approximately three (3) acres into
sixteen single family, detached -unit patio homes. The
owner/applicant proposed rear, alley access to the homes, with the
alley being dedicated as a public street. There would not be a
street/road along the fronts of these homes. The site, in its entirety,
is located between West Plum Street (to the north) and Rocky Road
(to the west) and Timber Lane (to the east); there is an existing
residence, on a two (2) acre lot to the south.
COMMENTS:
This site is located in the RL, low density residential, District; however, the project will have
to be submitted as a Planned Unit Development (PUD) subject to the requirements of the
Land Development Guidance System (LDGS).
2. The site is located in the Neighborhood Sign District, thus you will need to follow the
appropriate regulations, as found in the zoning code. You will need to provide a
handicapped parking space in the visitor parking area. You will also have to provide a bike
rack.
3. Electrical power is available in W. Plum. Normal development charges will apply. Standard
Utility easements must be provided. Light and Power will not provide street lights in the
alley.. There is concern with the width of the alley regarding the proper and needed spacing
between power lines and gas lines. Also, there is a strong possibility that there could be
conflict between the proposed trees and the existing overhead wiring; it was suggested that
fifteen (15') foot ornamental trees might work better for addressing these conflicts while still
providing buffering from the existing neighbors. Light and power extension plans will need
to be coordinated with all other utility and engineering plans. For further information, please
contact the Light and Power Utility's Engineering Department at 221-6700.
COMMUNITY PLANNING &
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT
Commu y Planning and Environmental vices
Current Planning
City of Fort Collins
November 30, 1995
Doug Viita
P.O. Box 885
Fort Collins, CO 80522
Ken Merritt
3521 W. Eisenhower Blvd.
Loveland, CO 80537
Dear Sirs:
For your information, attached is a copy of the Staffs comments concerning Single family, infill
subdivision on the 2600 block of West Plum Street presented before the Conceptual Review
Team on November 20, 1995.
The comments are offered informally by Staff to assist you in preparing the detailed components of
the project application. Modifications and additions to these comments may be made at the time of
formal review of this project.
If you should have any questions regarding these comments or the next steps in the review process,
please feel free to call me at 221-6750.
Sinc
1�
Mitchel Haas
City Planner
MH/gj d
Attachments
cc: Transportation Department
Stormwater Department
Project Planner
File