HomeMy WebLinkAboutRAMADA LIMITED SUITES PUD, PHASE 1 - FINAL - 16-96B - CORRESPONDENCE -3. Provide complete name (s) of the Entity (s) who is the Owner. Include type of organization
( Examples are as follows: Development Innovations, Inc. A Delaware corporation; or. ABC
Partners, a Nebraska general partnership; or John Z. Doe, an individual), if different from the
Developer.
4.
S.
Name
Title
Provide complete name (s) & title (s) of the individual (s) who will sign the Development
Agreement for the Owner given in item 1. The individuals must be officers for the Owner
Entity. Include the name and title of the person who will sign as an Attest for corporations.
Name
Attest:
Title
Explain any relationships between the Developer and the Owner for this development. In
addition explain any transfers of property ownership that will take place before the development
construction begins. This information is needed to clarify responsibilities for development.
Community Planning and Environmental Services
Current P' ung
Project:
Attention:
INFORMATION FOR DEVELOPMENT AGREEMENTS
The following information is needed to prepare a Development Agreement. Please fill in the blanks
with names and titles exactly as they should legally appear and return this form to the Development
Review Center. This form is for information purposes only. It requires no signatures. If you have any
questions please call at # 221-6750. This information should
match that shown on the plat.
Development Name
Contact Person:
Address: Phone:
I. Provide complete name (s) of the Entity (s) who is the Developer. Include type of organization
( Examples are as follows:, Development Innovations, Inc. A Delaware corporation; or ABC
Partners, a Nebraska general partnership; or John Z. Doe, an individual).
2. Provide complete name(s) and title(s) of the individual (s) who will sign the Development
Agreement for the Developer given in item 1. The individuals must be officers for the
development Entity or the individual (s). Also include the name and title of the person who will
sign as an Attest for corporations.
Name
Attest:
Title
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750
FAX (970) 221-6378 • TDD (970) 224-6002
Y-
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: July 23, 1996 DEPT: Engineering -Ping
PROJECT: # 16-96 Ramada Limited Suites - Preliminary &
Final (Re -submittal)
PLANNER: Mike Ludwig
All comments must be received by: August 2, 1996
t t-iC-tl1�1 �'-iNC� Pjtf7r. 6el. M
MTA-t--H Ei�
Date: 8 /(Z, 40� Signatures
CHECK IF YOU WISH TO RECEIVE ❑ PLAT
COPIES OF REVISIONS ❑ SITE
❑ LANDSCAPE
❑ UTILITY
PROJECT
COMMENT SHEET
Current Planning
DATE: July 23, 1996 DEPT: Stormwater
PROJECT: # 16-96 Ramada Limited Suites - Preliminary &
Final (Re -submittal)
PLANNER: Mike Ludwig
All comments must be received by: August 2, 1996
1. Please calculate the S.I.D. fee for this proposed development, and include a statement
along with documentation in the drainage report. The fee must be paid prior to receiving
building permits.
2. Please revise the detention pond outlet design. 1 larger orifice should be placed at the
most downstream pipe, instead of orifices for each inlet. This single orifice would not
clog as much as the several small orifices.
3. The finished floor for the proposed commercial buildings on lots 3 & 4 must have 1' of
freeboard above the high water line of the detention ponds.
4. Please revise the erosion control escrow as silt fence should be estimated at $2/ft.
5.. Please provide drainage easements by separte document for all of the detention ponds
prior to mylar submittal.
Please refer to the redlined plans and report for additional review comments.
j�_ Signature
CHECK IF YOU WISH TO RECEIVE
COPIES OF REVISIONS
❑ PLAT
❑ -SITE
❑ LANDSCAPE
0 UTILITY
C'C: kelrTe l*44ta
A/,4e Z.'4wig
;�Pworr,-Zw,
&e7e //./
Sincerely,
Michael Ludwig
Project Planner
xc: Kerrie Ashbeck
Stormwater Utility
file/Project Planner
Appendix Section 3107. Parking and access aisles shall comply with ANSI
A117.1-1992 with slopes no greater than 1:50 in any direction.
e. The proposed buildings shall be designed to comply with the Fort Collins
Nonresidential Energy Code (ASHRAE 90.1 with local amendments).
7. TCl of Fort Collins requests that the applicant submit a Plat for review.
8. The Poudre Fire Authority states that the building must be equipped with a fire
sprinkler system and a fire alarm system.
9. Comments from the Stormwater Utility are attached.
10. Comments from the Engineering Department are attached.
11. The Current Planning Department offers the following comments:
a. The Planning and Zoning Board will only be considering a Preliminary PUD ,
application for Phases 1 and 2 on August 26. Please revise all plans
accordingly for the September P8Z to reflect only the Ramada Limited Suites
PUD, Phase 1, Final.
This completes the review comments at this time. Additional comments may be
forthcoming as the various departments and reviewing agencies continue to review this
request. Please be aware of the following dates and deadlines to assure your ability to
stay on schedule for the September 23, 1996 Planning and Zoning Board hearing:
i!A!#A!**AAA!!f##A#AA**!!!###NlIAAAAA!#f!!#MAA**AA*AM#!!N##!A*AAA*!!f!i#!A#IAfAA#AA**AA*A**A**AAAAAAA
Plan revisions are due by 12:00 noon on September 4, 1996. Please contact me for
the number of folded revisions required for each document. Revisions and
supporting documentation submitted after this deadline will not be reviewed for the
July 22, 1996 Planning and Zoning Board hearing.
Pmrs, renderings, and 8 folded copies of final revisions are due by 12:00 noon on
September 16,1996.
}}}}}iififA##AAARRi}#}#NlAAAiiifiMNNRAAR}ifffHifNNfAAARR}R}}fflA#!A**AA*RAR}iNiflif}RAAMAAARR}!
Please contact me at 221-6206 if you have any questions or concerns related to these
comments. I would like to schedule a meeting with you as soon as possible, if necessary,
to discuss these comments.
h
b. The owner is responsible for provision of all conduit, ditch crossings, and
street crossings for telephone facilities within the project. The owner also
provides terminal room space (usually 8' x 4') and power for the telephone
terminal,.generally in a utility room. Contact Susan Peterson at 224-7473 for
conduit specifications for the telephone entrance cable.
C. The plat shows an 8' utility easement along Mason Street. The Site Plan
shows a 13' easement. Please clarify.
d. Any relocation of existing telephone facilities required by these plans will be
paid for by the developer.
5. The Zoning Department offers the following comments:
a. One additional handicap stall is required on Phase II or Lots 3 and 4 for a
total of 3 spaces.
b. Please add the plant species information for the PS and PV designations to
the Plant List.
6. The Building Inspections Department offers the following comments:
a. Hotel guest rooms and associated bathing and toilet facilities accessible to
the disabled shall be provided in accordance with Uniform Building Code
Section 3103(a)8 as amended by the City of Fort Collins. One of every
seven guest rooms shall comply with the American National Standards
Institute publication A117.1-1992 titled Accessible and Usable Buildings
and Facilities.
b. An automatic fire suppression system is required.
C. If a swimming pool is proposed, it is required to be accessible to the disabled
by ramp, hydraulic chair, transfer tier or other means. Hazardous materials
used to maintain the swimming pool must be used and stored in accordance
with the Fire Code. Classifications (UFC) and quantities of such materials
must be included in the building permit submittal.
d. The site shall be accessible to persons with disabilities in accordance with
Uniform Building Code Section 3103 and UBC Appendix Section 3106.
Provide a designated and marked "accessible route of travel" between all the
buildings on the site and building exits and entrances and the public way
(public sidewalk). Accessible routes shall comply with ANSI Al 17.1-1992
with running slopes no greater than 1:20 and cross slopes no steeper than
1:50. Where cross routes cross lanes for vehicle traffic they shall be
designated and marked as a cross walk. Provide parking and signs per
µJK L'v
Commi. y Planning and Environmental _rvices
Current Planning
City of Fort Collins
August 16, 1996
The Swahn Group, Inc.
c/o Eldon Ward
Cityscape Urban Design, Inc.
3555 Stanford Road, Suite 105
Fort Collins, CO 80525.
Dear Eldon,
Staff has reviewed your documents for the Ramada Limited Suites PUD, Phase 1, Final,
that were submitted on July 22, 1996, and would like to offer the following comments:
The Water and Wastewater Utility offers the following comments:
a. Please revise Plant Note #10 on the Phase One Final Landscape Plan to
state: "Keep all trees 10' clear and all shrubs 4' clear from any water,
sanitary sewer, and gas lines.
b. The Phase One Final Landscape Plan has numerous conflicts with the note
requested under comment 1 a. Please coordinate the Landscape Plan with the engineer who is preparing the Utility Plans. Attached is a red -line of
conflicting areas from the Water and Wastewater Utility. Please revise plans
accordingly and return the red -line plan with revisions.
2. Public Service Company states that a 13' wide utility easement adjacent to the west
right-of-way of South Mason Street must be provided.
3. Please contact Rob Wilkinson of the Natural Resources Department at 221-221-
6600 to discuss possible changes to the plant species which are proposed along
the north boundary of Lot 1 adjacent to the wetlands.
4. US WEST offers the following comments:
a. Review of these plans should not be construed as a commitment that
telephone facilities sufficient to serve this project are presently available. US
WEST will provide telephone service in accordance with the rates and tariffs
on file with the Colorado Public Utilities Commission.
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522-0580 - (970) 221-6750
FAX (970) 221-6378 - TDD (970) 224-6002