HomeMy WebLinkAboutTURNER SUBDIVISION (REPLAT) - MINOR SUBDIVISION - 12-96 - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTSSouth Fort Collins
Sanitation District
MEMO
TO: Mr. Mitch Hass, City of Fort Collins Planner
FROM: Mr. Terry W. Farrill, Systems Engineer
DATE: April 29, 1996
RE: Turner Subdivision
The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed
the above mentioned project and have no objections provided all District requirements are satisfied. There
is an existing domestic water service and sanitary sewer service to each lot, the domestic water service stub
and the sanitary sewer stub that will not be connected are to be abandoned at the main in accordance with
District standards and requirements.
Please do not hesitate to contact me at 226-3104, ext. 14, if you have any questions or require additional
information.
xc: Mr. Michael D. DiTullio, Manager
Mr. Bruce Pino, Operations Supervisor