HomeMy WebLinkAboutEVERGREEN PARK, BLOCK 3, LOTS 13 & 14 - PDP/FDP - 24-96B - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: Zytnc6A6ZJ PfhCK a4oe,,k 3r G47—S 3 try Date: 9 — 7 — G
Planner: o S . 1ralfiic Operations: �, A
Engineer: Tim a .
f ! T - t u rs c &� A^Jf As-E "17 41a" ,
Items Requested
Site land Plat Utility Drainage Rpt Other Items Required
Engineering
Redlined Items Being Returned
Site land Plat Utility Drainage Rpt Other Items Being Returned
Stormwater
Water/Wastewater
Traffic Operations
Trans. Planning
Transfort
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
I
Revisions Routing Sheet—rto,,��,p
I
FILE: PROJECT PLANNER
,-----------_
/
ENGINEERING: PAVE ENT
=.....-..-.--
.---..----.--
BUILDING INSPECTION
...--.--.-.--
LIGHT • •, •
....-.------_
• •
....-..---.--
' •
....-..---.--
FCLWDfELCO/BOXELDERm..---.
---.._
ria.
-.
-...
-
-..
-
ADVANCEPLANNING '
-..--.----..-
•
.
.-..-.--.-R.O.W.
-
PLANNING
mmmmm
mmmmm
• CONSERVATION
......----..-
POST OFFICE
-...-.----..-
US WEST
...--.----..-
PUBLIC SERVICE
....-....-.--
-.1-..--.-..-
'
....-DITCH
-----.--
COMPANY
mmmmmm
mom=
RAILROAD: UP or •
...---.---..-
R„ • •
...-..----..-
.-..-..------
.-..--.------
.-.
OWN
..--.--
...
mom
-..-.--
ON
mom.---.._
IN
No
.-.-.--
..---.-.-.--
--.-------.--
•
------------_
Rev. 5.07-97
3�� RIVNp