Loading...
HomeMy WebLinkAboutEVERGREEN PARK, 2ND FILING - 3RD REPLAT OF SUBDIVISION - 24-96 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETr Akk Revisions Routing Aeet-v,,.t:;,x 1. FILE: PROJECT PLANNER ENGINEERING: PAVEMENT ZONING BUILDING INSPECTION MAPPING / DRAFTING ADVANCE PLANNING R.O.W. PLANNING WATER CONSERVATION m POST OFFICE PUBLIC SERVICE STATE HIGHWAY DEPARTMENT DITCH COMPANY ......::::::� ............� 4v--ctCp Project: Planner: Traffic Operations:�� Engineer: gcv'V-uA.-17 �n�ow�.� sae : Dc ". , l q f'7 Date: 11 -AUNs 19c%-7 Items Requested Site land Plat Utility Drainage Rpt I Other Items Required Redlined Items Being Returned Site land Plat I Utility Drainage Rpt Other Items Being Returned Engineering���� Stormwater Water/Wastewater Traffic Operations Trans. Planning Transfort Natural Resources Park Planning Totals ? IT Other: Note: All redlined items should be returned with the resubmittal/ revisions. I I