Loading...
HomeMy WebLinkAboutEVERGREEN PARK REPLAT (NO. 1), BLOCK 5, LOTS 1 & 2 - PDP/FDP - 24-96A - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTAPPENDIX V Stuffer Envelope Grading, Drainage and Erosion Control Plan Easement dedication exhibit for Lots 1 and 2, Block 5 No Text easterly to Pond 5 (conceptual). The detention volume required for the basin, in order to meet the prescribed release rate, was estimated to be 6.4 acre-feet. Basin 5A. The basin was assumed to be completely developed for commercial use with an estimated imperviousness of 90 percent. On -site detention is required for this basin. The allowable release from this basin is 5 cfs, or 0.40 cfs/acre. The designated release point for Basin SA is Pond 5; this pond will release flows to Dry Creek. The detention volume required for the basin, in order to meet the prescribed release rate, was estimated to be 2.3 acre-feet. Basin 5B. The basin was assumed to be completely developed for commercial use with an estimated imperviousness of 90 percent. On -site detention is required for this basin. The allowable release from this basin is 11 cfs, or 0.36 cfs/acre. The designated release point for Basin 5B is Dry Creek at the southeast corner of the basin. The detention volume required for the basin, in order to meet the prescribed release rate, was estimated to be 5.6 acre-feet. Basin 6. The basin was assumed to be primarily developed for commercial use (79 percent), with 8 percent devoted to medium density residential housing. The remaining 13 percent was assumed to be open space associated with existing wetland, which is functioning as a detention pond (Pond 6). It is noted that 13 percent is probably a conservatively low estimate of the wetland area within this basin. The resulting average imperviousness is 75 percent. On -site detention is not required for this basin; however the integrity of the downstream storm drainage system requires that "Pond 6" continue to operate as a detention pond. In fact, this Master Plan specifies that Pond 6 act as a regional detention pond, receiving on -site detention releases from Basins 7A, 7B and 9. Assuming that the pond will receive releases from these three basins as well as runoff from Basin 6, the existing pond and outlet will limit the developed condition 100-year release to 13.8 cfs. The detention volume required for the basin, based on the current release rate of 13.8 cfs, was estimated to be 15.5 acre-feet. It is imperative that this pond release rate be maintained due to the capacity of downstream conveyance and detention facilities. The designated release point for Basin 6 is the upstream end of the Blue Spruce Drive roadside channel/culvert system which conveys flow to the Evergreen West Pond. Basin 7A. The basin was assumed to be fully developed with medium and low density residential housing at 32 and 68 percent, respectively. Consequently, the estimated imperviousness is 42 percent. On -site detention is required for this basin, with releases routed through Pond 6 for additional attenuation of the flood peak. The allowable release from this basin is 12 cfs, or 0.51 cfs/acre. The designated release point for Basin 7A is a conceptual drainage channel/ pipe system through Basin 7B which will convey flows to Pond 6. The detention volume required for the basin, in order to meet the prescribed release rate, was estimated to be 3.7 acre-feet. Basin 7B. The basin was assumed to be fully developed with a combination of commercial, and low and medium residential housing. The resulting imperviousness was 20 MAR-21-97 FRI 13:02 1 . UV/ VV Basin 1F. The basin is part of Greenbriar Village PUD, Second and Fourth Filings. Consequently, the basin was assumed to be fully developed with medium residential land use. An imperviousness of 40 percent was assumed. Runoff will concentrate along the west side of Redwood Street near the end of Fox Glove Court; it will then eyed under Redwood Street in a proposed pipe system designed to carryyflbe ows- Therefore, on -site detention is not required for this basin, as all storm proposed Greenbriar tivetiand nd. runoff will conveyed under Redwood Street to the p op Basin 1G. The basin is part of the Greenbriar Village PUD, Third Filing, therefore, it was assumed to be 40 percent impervious. Runoff from the basin will be conveyed directly (undetained) to the outfall pipe for the Greenbriar Wetland Pond, thereby being routed directly to the Redwood Pond. The Greenbriar Wetlandond not has resultbein co adverse n configured to over -detain such that undetained runoff from Basin IG will impact to the Redwood Pond. Consequently, on -site detention is not required for this basin. Bassin 2. The basin was assumed to be developed with commercial, and both high and ing to 5, 35 and 60 percent levels, respectively; the result low density residential hous being an average imperviousness of about 50 percent. On -site detention is not required for this basin; storm rwt ff %W be conveyed to the existing Redwood Pond. Oufl flows discharges from this pond will enter the proposed outlet channel which will carry easterly to Lemay Avenue while picldng up runoff from Basin OB and outflows from the Evergreen Fast Pond near the east end of the channel. Basin 3A. The basin was assumed to be completely developed for commercial use with an estimated imperviousness of 90 percent. On -site detention is not required for this basin; storm mnoy will be transported to the existing inlet channel far the Evergreen West Pond. Basin B. The basin was assumed to be developed for 37 percent com�nerc 1 set of the ance 63 percent residential housing at levels representing respectively. The reessult is a developed basin for high, medium and low densities; respec ' y imperviousness of 63 percent. On site detention is not be required for this basin; storm Outflow from this pond rwio will a tr will enter the existing outlet channel which will transport flow southerly to Pond 5 (conceptual). Basin 4D. By definition, the basin is currently fully developed for commercial Due e; the amount of impervious area for the basin was determined to be 97 percent.easible. 10 the fulty-developed condition of to pond 5 (conceptual)- 4,. on -site detention is not f Storm runoff will be conveyed Basln4U. The basin was assumed to�Ent On siteydetention f re or commercial th basin an estimated imperviousness of The allowable release from this basin is 17 c or .47 cfs/acre The desisnated release s .,,,;�► fnr rtnsin 4U is the storm sewer and street along Conifer Street which convey flows 19 Table 5.3. Summary of Hydraulic Analysis and Design Information for the Existing Conveyance Facilities Which Require Modu►cations or .,.,a a.o r^nvav9nnP Rarilitiec which Have Been Desiened but Not Constructed. 11111JlVYGIIIGIIIJ, ullu lllV �v..•v�•. •.v.. ...�------- ------- --- .- Description:Wtdtii Bottom (R) or ' Stde Slopa Invert Slope Mannrrtg's 100-Xea ptscharge' F►ow 0606, Flow Velocity Commeiits EleMerif Number. v) (R/R) W.... est Area Basins 7A and 7B Outlet 36" RCP. n/a 0.0040 0.013 28 - - Pipe full capacity = 42 cfs PI Pipe to Pond 6 P2 Evergreen West Pond 30 ft 4 0,0025 0.060 (Nod 252) 1.5 1.5 Freeboard provided = 1.0 ft. Inlet Channel Evergreen West Pond 7 ft 4 0.0019 0.060 24 1.6 1.1 Freeboard provided = 2.5 ft (min.) P3 Outlet Channel P4 Conifer Street Channel 7 ft 4 0.0025 0.035 (Node20132) 3.2 3.2 Freeboard provided = 3.8 ft ;: Noitheast Area ..... PS PVE-B Perimeter 0 ft 4 0.0068 0.060 16 1.5 1.7 Freeboard provided = 0.5 ft (min.) Channel, East Reach (A) P6 PVE-B Perimeter 25 ft 4 0.0043 0.035 445 2.8 4.6 Freeboard provided = 0.7 ft (min.) Channel, East Reach (B) P7 PVE-B Perimeter 0 ft 4 0.0080 0.060 8 1.2 1.5 Freeboard provided = 0.8 R (min.) Channel, West Reach P8 PVW-B Perimeter 0 ft 4 0.0070 0.060 17 1.6 1.7 Freeboard provided = 0.8 ft (min.) Channel, East Reach East Pipe Crossing of tripple 42" n/a 0.0067 0.013 445 - - Available driving head 2 9.5 ft (see Appendix F.2) I arimer and Weld Canal RCPs P10 West Pipe Crossing of single 42" n/a 0.0063 O.o13 111 -- _ Available driving h = 12.8 ft (see Appendix F.2) Iead arimer and Weld Canal RCP :Southeast:Aiea . P11 Greenbriar Wetland Pond 15" RCP n/a 0.0033 0.013 4 -- - Pipe full capacity = 4 cfs Outlet Pipe P12 Redwood Pond Outlet 5 ft 4 0.0025 0.060 17 1.4 1.2 Freeboard provided = 1.6 ft (min.) Channel P13 Evergreen East Pond 3 ft 1 0.0025 0.016 49 2.0 5.1 Freeboard provided = 1.1 ft Outlet Channel (concrete) P14 Greenbriar Outfall 12 ft 4 0.0020 0.060 64 (Node 269) 2.2 1.4 Freeboard provided = 0.3 ft Channel, North Reach P15 Greenbriar Outfall 16 ft 4 0.0020 0.060 77 (Node 270) 2.1 1.5 Freeboard provided = 0.4 ft Channel, South Reach ' Refer to Appendix F for explanation of design discharges. FBI FINAL REPORT GREENBRIAR-EVERGREEN BASIN MASTER DRAINAGE PLAN PREPARED. FOR: City of Fort Collins Stormwater Utility 235 Mathews Fort Collins, CO 80524 PREPARED BY: Lidstone & Anderson, Inc. 736 Whalers Way, Suite F 200 Fort Collins, CO 80525 (LA Project No. COTST05.4) May 1, 1996 Appendix IV Greenbriar-Evergreen Basin Master Drainage Plan; Lidstone & Anderson, Inc.; Project No COTST05.4; dated May, 1996 SECTION 3. HYDROLOGY STANDARDS 3.1 General Design Storms All drainage systems have to take into consideration two separate and distinct drainage problems. The storm, depending on land use The runoff l storm which occurs at frular intervals, o this type of storm ssconlside considered the" "nuisance flow". based on 'the two to he second is the major storm which is usually based on an infrequent storm, such as the 100-year storm. In some instances the major storm routing will not be the same as the initial storm. In this case, a complete set of drainage plans shall be submitted for each storm system. 3.1.1 Initial Storm Provisions As stated before, the initial storm shall be based on the two to ten-year storm. The objectives of such drainage system planning are to minimize inconvenience, to protect against recur- ring minor damage and to reduce maintenance costs in order to create an orderly drainage system at a reasonable cost for the urban resident. The initial storm drainage system may in- clude such lacilities as curb and gutter, storm sewer and open drainageways, and detention facilities. 3.1.2 Major Storm Provisions The major storm shall be considered the 100-year storm. The objectives of the major storm planning are to eliminate substantial property damage or loss of life. Major drainage systems may include storm sewers, open drainageways, and detention facilities. The correlation between the initial and major storm system shall be analyzed to insure a well coordinated drainage system. 3.1.3 Storm Frequency The initial and major storm design frequencies shall not be less than those found in the fol- lowing table: Table 3-1 DESIGN STORM FREQUENCIES Design Storm Return Period Initial Storm Major Storm Land Use or Zoning t Residential: (RE, RL, RLP, RP, ML, RM, RMP, ................ Par 100-year ................ 2-y _ RLM, MM. RH) ......................... .. Business: .............10 -year 100 year (BG, BL, BP. HB, C. IL, IP, lG) ............... 10-year 100-ye?r ................ 100-year Public Budding Areas ................................. ..... 2-year ......................................... 100-year Parks, Greenbelts, etc ............... — Open Channels & Drainageways............................................. ................................. 100-year Detention Facilities ............................................. See Table 3-2 !or zoning delinitions. 3.1.4 Rainfall Intensities sed in the computation of runoff shall be obtained from the The rainfall intensities to be u Rainfall Intensity Duration Curves for the City of Fort Collins, included in these specifications as Figure 3.1. 3.1.5 Runoff Computations with the criteria Storm Runoff computations for both the initial and All unoffor storm calculations lmadle in the design of set forth in Section 3.2 "Analysis Methodology." both initial and major drainage systems shall be in with the storm have atyped narrative form of a Drainage Report. Reports submitted for approval should have a typ with computations and maps in a legible form. 3-1 MAY 1984 DESIGN CRITERIA No Text R-M-P Medium Density Planned Residential District — designation for medium density areas planned as a unit (PUD) to provide a variation in use and building placements with a minimum lot area of 6,000 square feet. R-L-M Low Density Multiple Family District — areas containing low density multiple family uniith a minimum ot area of ts or any other use in the R-L District one -family or two-family dwellings lingswlmultiple-family0 and 9 000 square feet for0 square feet for dwellings. M-L Low Density Mobile Home District — designation for areas for mobile home parks containing independent mobile homes not exceeding 6 units per acre. M-M Medium Density Mobile Home District — designation for areas of mobile home parks containing independent mobile homes not exceeding 12 units per acre. B-G General Business District — district designation for downtown business areas, including a variety of permitted uses, with minimum lot areas equal to 1 /2 of the total floor area of the building. B-P Planned Business District — designates areas planned as unit developments to provide business services while protecting the surrounding residential areas with minumum lot areas the same as R-M. H B Highway nses witBusiness District h am'in mum lot area equalto 1/2 ofthe totalfloorta etautomobile-orientated of the building. B-L Limited. Business District — designates areas for neighborhood convenience centers, including a variety of community uses with minimum lot areas equal to two times the total floor area of the building. C Commercial District —designates areas of commercial, service and storage areas. I-L Limited Industrial District —designates areas of light industrial uses with a minimum area of lot equal to two times the total floor area of the building not to be less than 20,000 square feet. I-P Industrial Park District —designates light industrial park areas containing controlled industrial uses with minimum lot areas equal to two times the total floor area of the building not to be less than 20,000 square feet. I-G General Industrial District — designates areas of major industrial development. T Transition District —designates areas which are in a transitional stage with regard to ultimate development. For current and more explicit definitions of land uses and zoning classifications, refer to the Code of the City of Fort Collins, Chapters 99 and 118. Table 3-3 RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS Runoff Coefficient Character of Surface Streets, Parking Lots, Drives: 0.95 Asphalt................................................................................................ 0.95 Concrete............................................................................................. 050 Gravel................................................................................................. Roofs .................................... .......................................... 0.95 Lawns, Sandy Soil: 0.10 Flat<2% ............................................................................................. 0.15 Average2 to 7%.................................................................................. 0.20 Steep>7%.......................................................................................... Lawns, Heavy Soil: 0.20 Flat<2%............................................................................................. 0.25 Average 2 to 7%.................................................................................. 0.35 Steep>7%......... :......................................... ....................................... MAY 1984 3-4 DESIGN CRITERIA 3.1.7 Time of Concentration In order to use the Rainfall Intensity Duration Curve, the time of concentration must be known. This can be determined either by the following equation or the "Overland Time of Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report (See Figure 3-2). TC =1.87 (1.1 — CC,) D "Z S3 Where Tc = Time of Concentration, minutes S = Slope of Basin, % C = Rational Method Runoff Coefficient D = Length of Basin, feet Cl = Frequency Adjustment Factor Time of concentration calculations should reflect channel and storm sewer velocities as well as overland flow times. 3.1.8 Adjustment for Infrequent Storms The preceding variables are based on the initial storm, that is, the two to ten year storms. For storms with higher intensities an adjustment of the runoff coefficient is required because of the lessening amount of infiltration, depression retention, and other losses that have a proportionally smaller effect on storm runoff. These frequency adjustment factors are found in Table 3-4. Table 3-4 RATIONAL METHOD FREQUENCY ADJUSTMENT FACTORS Storm Return Period Frequency Factor (years) C, 2 to 10 1.00 11 to25 1.10 26 to 50 1.20 51 to 100 1.25 Note: The product of C times C, shalt not exceed 1.00 3.2 Analysis Methodology The methods presented in this section will be instituted for use in the determination and/or verification of runoff at specific design points in the drainage system. These methods are (1), the Rational Method and (2) the Colorado Urban Hydrograph Procedure (CUHP). Other computer methods. such as SWMM, STORM, and HEC-1 are allowable if results are not radically different than these two. Where applicable, drainage systems proposed for construction should provide the minimum protection as determined by the methodology so mentioned above. 3.2.1 Rational Method For drainage basins of 200 acres or less, the runoff may be calculated by the Rational Method, which is essentially the following equation: Q = C1CIA Where O = Flow Quantity, cfs A =Total Area of Basin, acres C1= Storm Frequency Adjustment Factor (See Section 3.1.8) C = Runoff Coefficient (See Section 3.1.6) 1 = Rainfall Intensity, inches per hour (See Section 3.1.4) 3.2.2 Colorado Urban Hydrograph Procedure For basins larger than 200 acres, the design storm runoff should be analyzed by deriving synthetic unit hydrographs. It is recommended that the Colorado Urban Hydrograph Procedure be used for such ana!ysis. This procedure is detailed in the Urban Storm Drainage Criteria Manual, Volume 1, Section 4. MAY 1984 3-5 DESIGN CRITERIA APPENDIX III Backup Diagrams and Exhibits Table 3-3; Rational Method Runoff Coefficients for Composite Analysis Table 3-4; Rational Method Frequency Adjustment Factors Figure 3-2; Estimate of Average Flow Velocity for Use with the Rational Formula Figure 3-1; City of Ft. Collins Rainfall Intensity Duration Curve March 24, 1997 Project No: 1466-14-96 Re: EROSION CONTROL SECURITY DEPOSIT REQUIREMENTS: Lots 1 & 2, Block 2, Replat (No. 1) of Evergreen Park; Fort Collins, Colorado A. An erosion control security deposit is required in accordance with City of Fort Collins policy (Chapter 7, Section C: SECURITY; page 7.23 of the City of Fort Collins Development Manual). In no instance shall the amount of the security be less than $1000.00. 1. According to current City of Fort Collins policy, the erosion control security deposit is figured based on the larger amount of 1.5 times the estimated cost of installing the approved erosion control measures or 1.5 times the cost to re -vegetate the anticipated area to be disturbed by construction activity. a. The cost to install the proposed erosion control measures is approximately $ 1,875.00 Refer to the cost estimate attached in Appendix I. 1.5 times the cost to install the erosion control measures is $ 2,812.50 b. Based on current data provided by the City of Fort Collins Stormwater Utility, and based on an actual anticipated net affected area which will be disturbed by construction activity (approximately 2.12 acres), we estimate that the cost to re - vegetate the disturbed area will be $ 1,126.21 ($ 531.00 per acre x 2.12 acres). 1.5 times the cost to re -vegetate the disturbed area is $ 1,689.31. The $ 531.00 per acre for re -seeding sites of less than 5 acres was quoted to us by the City of Fort Collins Stormwater Utility staff. CONCLUSION: The erosion control security deposit amount required for Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park will be $2,812.50 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1 March 24, 1997 Project No: 1466-14-96 Basil Hamdan City of Fort Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80522 Re: Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park; Fort Collins, Colorado Dear Basil, Attached is the erosion control security deposit estimate for Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park. ESTIMATE 1: 600 LF of Silt Fence @ $ 3.00 per LF 1 - Gravel Inlet Filter ® $ 75.00 each TOTAL ESTIMATED COST: ESTIMATE 2: re -vegetate the disturbed area of 2.12 acres at $ 531.00 per acre TOTAL ESTIMATED COST: $ 1,800.00 $ 75.00 $ 1,875.00 x 1.50 $ 2,812.50 $ 1,126.21 $ 1,126.21 x 1.50 $ 1,689.31 In no instance shall the amount of the security be less than $ 1,000.00. Therefore, the total required erosion control security deposit for Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park will be $ 2,812.50 ' - can at 226-5334. Shear Engineering Corporation BW S / meo cc: Premier Custom Homes Dave Stringer, City of Fort Collins 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1 APPENDIX II Erosion Control Calculations Erosion Control Sequencing schedule Erosion Control security deposit estimates SHEAR ENGINEERING CORPORATION PAGE e OUTLET STRUCTURE FOR LOT 1 & 2 EVERGREEN PARK PROJECT: LOT 1 & 2 EVERGREEN PARK DATE: 03/24/97 PROJECT NO 1466-14-96 BY MEG PROJECT LOCATION :FORT COLLINS PILE: PREMOUT INPUT FOR OUTLET STRUCTURE LOWER ORIFICE DIAM. (ft) = 0.33 WHIR TYPE BROADCRESTED DETERMINE ORIFICE SIZE LOWER ORIFICE INV. (ft) = 70.34 WEIR LENGTH (ft) = 4.00 FOR MINOR STORM LOWER ORIFICE CORP. (Cl) = 0.65 WEIR INVERT (ft) = 71.75 Q= CA(2gH)^O.5 UPPER ORIFICE DIAM.(ft) = NA WHIR COHF. (CW) = 2.60 A = Q/(C(2gH)^0.5 UPPER ORIFICE INV. (ft) = NA TOP OF BERM (ft) = 72.02 H (ft) = 1.35 UPPER ORIFICE COBF. (Cu) = NA INIT. DELTA (ft) = 0.66 C = 0.65 100 YR. RELEASE RATE (cfs)= 0.49 DELTA HEAD (ft) = 0.50 Q (cfe)= 0.49 CHANNEL WIDTH (ft) = 4.00 100 YR WSBL REQUIRED (£t)- 71.69 A (sf) = 0.08 CHANNEL DEPTH (ft) = 0.50 OVER FLOW YES R (ft) = 0.160 PIPE SLOPE (t) = 0.005 WHIR TYPE BROADCRESTED D (ft) = 0.321 MANNINGS n = 0.016 WEIR LENGTH (ft) = 100.00 USE 0.33' DIAMETER (4") WHIR INVERT (ft) = 72.02 WHIR COHF. (Cwo) = 2.60 *rrrrr+x r+rrrrrrt rr+rrrrr *OUTPUT* ***rr**r ***rrrrr trtr+r+rx r+rrrr+* CHANNEL AREA (SF) 2.00 WETTED PERIMETER = 5.00 FEET HYD. RAD (FT) = 0.400 FEET R^2/3 = 0.5427 OUTLET CHANNEL CAPACITY = 0.71 CPS LOWER ORIFICE AREA (A) = 0.0855 SQUARE PERT UPPER ORIFICE AREA (A) = 0.0000 SQUARE FEET rrtrtrrxrrtrrrrrrrxrr+rr*+rrrrr+rtrrrrrxrtrr+rrtxrtrrrrtrtrr+rrrxtrrrrrrrrrrtr+rxxtrtrrtrr+rrrr**rrtrrrrr****rrrrr***r LOWER ORIFICE UPPER ORIFICE PRIMARY WHIR OVERFLOW SPILLWAY rrrrr*rt **rrrrr **rrrrr rrrr rrr xr+rrr+ •rrr+trt +rrrttr r+r:rrr rr+rrrr rr+rrrr HEAD HEAD HEAD SUB HEAD ' BLEV. OVER LOWER OVER UPPER OVER WHIR TOTAL OVER WHIR TOTAL ELEV. LOWER ORIFICE UPPER ORIFICE WHIR FLOW PLOW WEIR FLOW FLOW ORIFICE FLOW ORIFICE FLOW ft ft cfe ft cfe ft cfe cfe ft cfe cfs ft 70.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.34 71.00 0.49 0.31 0.00 0.00 0.00 0.00 0.31 0.00 0.00 0.31 71.00 71.50 0.99 0.45 0.00 0.00 0.00 0.00 0.4S 0.00 0.00 0.45 71.50 72.00 1.49 0.55 0.00 0.00 0.25 1.30 1.85 0.00 0.00 1.85 72.00 72.02 1.51 0.55 0.00 0.00 0.27 1.46 2.01 0.00 0.00 2.01 72.02 72.10 1.59 0.56 0.00 0.00 0.35 2.15 2.72 0.08 5.88 8.60 72.10 71.69 1.18 0.49 0.00 0.00 0.00 0.00 0.49 0.00 0.00 0.49 71.69 71.75 1.24 0.50 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50 71.75 71.69 1.18 0.49 0.00 0.00 0.00 0.00 0.49 0.00 0.00 0.49 71.69 r xrtrrrrr *rrrrr*r rrrrrrrr rrr+rrrr rrrrrtrrr rrrtxrrr rrxtrtrrr rxrrtr+rx rrrrrrrtr rrr*rtrrr +rrrrrrr *rrrrr** ORIFICE EQUATION: CA(2gH)'1/2 WEIR PLOW EQTN. : CWLH^3/2 NOTE: HEAD OVER ORIFICE = HEAD OVER CENTER OF ORIFICE APPROXIMATE W.S.EL. FOR Qrel = 0.49 CPS = 71.69 OK FREEBOARD = 0.33 REQUEST VARIANCE CONCLUDE: OUTLET STRUCTURE IS ADEQUATE SHEAR ENGINEERING CORPORATION PAGE 7 AVERAGE END AREA METHOD FOR WEST DETENTION POND VOLUMES PROJECT :LOTS 1 & 2 EVERGREEN PARK DATE: 03/24/97 PROJ. NO:1466-14-96 LOCATION:BLUE SPRUCE DRIVE BY MBO NOTES FILE: PRSMAVG CONSTANT: 65 = 1 SQ IN. FIRST EVEN CONTOUR 71 FEET INVERT 70.34 FEET TOP BLEV 72 FEET INCREMENT 1 FOOT SCALE: 1• = 30 FEET t trtrtrrrr •f rrrttr trtttttt rtrtxrtttrtr rf rfrr+f r+fr+t+t xtrxxxxrt xrxfrrrr rf rrf rfr STAGE BLHV PLANI- AREA AREA VOLUME CUM. CUM. CUM. METER (Al) (A2) (V1) VOLUME VOLUME VOLUME ft ft READING sq in sq ft cf cf cy ac-ft +:rtrrrfr rrrf rrr+ xfrtrtf rff rrf rrf rf rf+fr+f+ +rt+r+tt trtxftxtr •r•rrrrf rrffr•rr 0.00 70.34 0 0.00 0 0 0 0 0.00 0.66 71.00 158 2.43 2188 722 722 27 0.02 1.66 72.00 1146.5 17.67 15902 9045 9767 362 0.22 --------------------------------------------------------------------------------- FORMULAH:A1= (PLANIMETBR READING)/CONSTANT A2= (Al) *SCALE SQUARED VOLUME REQUIRED WITH 1/2 ROW = 7006 CP WATER SURFACE ELEVATION REQUIRED = 71.69 FEET FINISHED FLOOR ELEVATION = 72.76 FEET LOT 2 FINISHED FLOOR ELEVATION = 73.35 PBBT LOT 1 SEPARATION PROVIDED = 1.07 FEET REQUEST VARIANCE BECAUSE < 1.5 PBBT MAXIMUM WATER DEPTH = 1.35 FEET REQUEST VARIANCE BECAUSE > 1.0 FOOT FREEBOARD PROVIDED = 0.31 FEET REQUEST VARIANCE BECAUSE < 1.0 FOOT CONCLUDB:SET PRIMARY WHIR HEIGHT AT 71.76 POND WILL BE ADEQUATE SHEAR ENGINEERING CORPORATION PAGE 6 DETENTION VOLUME REQUIRED FOR DETENTION POND OF LOT 1 & 2 EVERGREEN PARK PROJECT: LOT 1 & 2 EVERGREEN PARK DATE: 03/24/97 PROJ.NO. 1466-14-96 BY MEO FILE: PREMCUHP NOTE: 1/2 ROW INCLUDED IN AREA CUMULATIVE RUNOFF METHOD FOR SIZING DETENTION PONDS DESIGN STORM: 100 YEAR RUNOFF COEFFICIENT 0.89 RELEASE RATE: 0.49 CPS AREA: 1.05 ACRES RELEASE RATE IS BASED ON 0.47 CPS PER ACRE OF CONTRIBUTING AREA INITIAL TIME: 5 MINUTES TIME INCREMENT: 5 MINUTES CONTRIBUTING AREA ONSITE SUBBASIN = Aw AREA = 0.92 ACRES ROW AREA = 0.13 ACRES INFLOW INFLOW RELEASE STORAGE STORAGE TIME TIME INTENSITY RATE VOLUME VOLUME VOLUME VOLUME min Dec iph cfs cf cf cf ac-ft rt+ttxxrrxtl ttl txxttl ttttt+trttttYtf t+tt+txtfi ttt4rfffif tf tfi tfitttrftttit x. 5 300 9.30 8.69 2607.3 148.1• 2459.2 0.06 10 600 7.14 6.67 4003.4 296.1 3707.3 0.09 15 900 6.06 5.66 5096.8 444.2 4652.6 0.11 20 1200 5.21 4.87 5842.5 592.2 5250.3 0.12 25 1500 4.63 4.33 6490.1 740.3 5749.9 0.13 30 1800 4.20 3.92 7064.8 888.3 6176.5 0.14 35 2100 3.81 3.56 7476.9 1036.4 6440.6 0.15 40 2400 3.60 3.36 8074.1 1184.4 6869.7 0.16 45 2700 3.28 3.07 8275.9 1332.5 6943.5 0.16 50 3000 3.02 2.82 8466.6 1480.5 6986.1 0.16 55 3300 2.80 2.62 8634.8 1628.6 7006.2 0.16 *** 60 3600 2.60 2.43 8746.9 1776.6 6970.3 0.16 65 3900 2.43 2.27 6856.3 1924.7 6931.6 0.16 70 4200 2.30 2.15 9027.3 2072.7 6954.6 0.16 75 4500 2.17 2.03 9125.4 2220.8 6904.6 0.16 80 4800 2.07 1.93 9285.2 2368.8 6916.4 0.16 85 5100 1.96 1.83 9341.3 2516.9 6824.4 0.16 90 5400 1.87 1.75 9436.6 2664.9 6771.7 0.16 95 5700 1.77 1.65 9428.2 2813.0 6615.2 0.15 100 6000 1.70 1.59 9531.9 2961.0 6570.9 0.15 105 6300 1.63 1.52 9596.4 3109.1 6487.3 0.15 110 6600 1.57 1.47 9683.3 3257.1 6426.2 0.15 115 6900 1.50 1.40 9672.1 3405.2 6266.9 0.14 120 7200 1.44 1.35 9688.9 3553.2 6135.7 0.14 trrrtttt+xrtrttr+xrxfifrrttrrtttrr+r+rfixxrx+xtffrtfftrtrrxtf tff tf ttf rx+rf DETENTION VOLUME REQUIRED = 7006.23 cf = 0.16 ac-ft NOTE: RELEASE RATE BASED ON AREA OF 1.05 ACRES & 0.47 CPS/ACRE. SHEAR ENGINEERING CORPORATION DEVELOPED PLOW TO CONCENTRATION POINT 2 FROM SUBBASIN As & ROWNORTH PROJECT: LOT 1 & 2 EVERGREEN PARK DATE 03/24/97 LOCATION:FORT COLLINS PROS. NO.1466-14-96 PILE: PREMRAT BY MHO AREA (A)= 1.290 ACRES RUNOFF COBF. (C) PAGE S 2 YEAR 10 YEAR 100 YEAR C = 0.65 0.65 0.81 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti)' LENGTH =? FEET SLOPE _? % 2 YEAR 10 YEAR 100 YEAR C _? ? ? Ti (min)= 0.00 0.00 0.00 TRAVEL TIME (Tt)=L/(60*V) PLOW TYPE L (ft) _? S (%) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (&) _? ? • V (fps) _? Tt(min)= 0.00 L (ft) _? S ($) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (%) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (%) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S 00 _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (%) _? ? V (fps) _? Tt(min)= 0.00 NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 0.00 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 0.00 0.00 0.00 USE Tc = 30 10 10 assumed verify at final INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 2.54 4.45 7.14 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfe) 2 YEAR 10 YEAR 100 YEAR Q = 2.13 3.72 7.47 CONCLUDE: RELEASE UNDETAINED INTO EVERGREEN WEST POND SHEAR ENGINEERING CORPORATION DEVELOPED FLOW TO CONCENTRATION POINT 1 FROM SUBBASIN Aw & ROWSOUTH PROJECT: LOT 1 & 2 EVERGREEN PARK DATE 03/24/97 LOCATION:FORT COLLINS PROJ. NO.1466-14-96 FILE: PREMRAT BY MHO AREA (A)= 1.050 ACRES RUNOFF COEF. (C) PAGE 4 2 YEAR 10 YEAR 100 YEAR C = 0.71 0.71 0.89 SSE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (TO OVERLAND TRAVEL TIME (Ti) LENGTH =? FEET SLOPE _? k 2 YEAR 10 YEAR 100 YEAR C =? ? ? Ti (min)= 0.00 0.00 0.00 TRAVEL TIME (Tt)=L/(60*V) FLOW TYPE L (ft) _? S (k) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (k) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (k) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (k) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (k) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (k) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (k) _? ? V (fps) _? Tt(min)= 0.00 NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 0.00 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 0.00 0.00 0.00 USE Tc = 10 10 10 assumed verify at final INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 2.54 4.45 7.14 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (C£s) 2 YEAR 10 YEAR 100 YEAR Q = 1.91 3.34 6.69 CONCLUDE:DETAIN IN PARKING LOT RELEASE RATE = 0.47 cfs/acre* ACREAGE = 0.49 CPS 0 SHEAR ENGINEERING CORPORATION HISTORIC PAGE 3 PLOW TO CONCENTRATION POINT 2 PROM SUBBASIN Aw & As PROJECT: LOT 1 & 2 EVERGREEN PARK DATE 03/24/97 LOCATION:FORT COLLINS PROJ. NO.1466-14-96 PILE: PREMRAT BY MRO AREA (A)= 2.120 ACRES RUNOFF CORP. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 LAWN CLAY SOIL, FLAT TIME OF CONCENTRATION (TO OVERLAND TRAVEL TIME (Ti) LENGTH = 400 FEET SLOPE = 1.00 $ 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 33.66 33.66 31.79 TRAVEL TIME (Tt)=L/(60*V) FLOW TYPE L (ft) _? S ($) _? ? L (ft) _? S (%) _? ? L (ft) _? S ($) _? ? L (ft) _? S ($) _? ? L (ft) _? S ($) _? ? L (ft) _? S ($) _? ? L (ft) _? S ($) _? ? NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 33.66 33.66 31.79 USE Tc = 33.5 33.5 32 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 1.47 2.60 4.20 NOTE: INTENSITIES TAKEN PROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 0.62 1.10 2.23 V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 V (fps) _. Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00. V (fps) _? Tt(min)= 0.00 TOTAL TRAVEL TIME (min) = 0.00 CONCLUDE: HISTORIC FLOW TO EVERGREEN WEST DETENTION POND DEVELOPMENT WILL REDUCE CONTRIBUTING AREA TO POND TO MATCH MASTER PLAN BASIN DELINEATION AS BEST AS POSSIBLE SHEAR ENGINEERING CORPORATION SUBBASIN BREAKDOWN PAGE 2 PROJECT: LOT 1 & 2 EVERGREEN PARK DATE 03/24/97 LOCATION:FORT COLLINS BY MEO PROD. NO.1466-14-96 TOTAL SITE AREA = 2.12 ACRES Ae = 1.20 ACRES- SITE ONLY TOTAL BASIN AREA = 2.34 ACRES Aw = 0.92 ACRES- SITE ONLY SUB BASINS Aw Ae ROW ROWNORTH ROWSOUTH BASIN ASPHALT 0.39 0.53 0.15 0.06 0.09 0.92 CONCRETE 0.02 0.02 0.03 0.01 0.02 0.04 GRAVEL 0.00 0.03 0.00 0.00 0.00 0.03 ROOFS 0.20 0.14 0.00 0.00 0.00 0.34 LAWNS,SANDY SOIL FLAT < 2% 0.00 0.00 0.00 0.00 0.00 0.00 AVERAGE 2 TO 7% 0.00 0.00 0.00 0.00 0.00 0.00 STEEP > 7% 0.00 0.00 0.00 0.00 0.00 0.00 LAWNS, HEAVY SOIL: FLAT < 2% 0.31 0.48 0.04 0.02 0.02 0.79 AVERAGE 2 TO 7% 0.00 0.00 0.00 0.00 0.00 0.00 STEEP > 7% 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL 0.92 1.20 0.22 0.09 0.13 2.12 RUNOFF COEFFICIENT SUB BASINS Aw Ae ROW ROWNORTH ROWSOUTH BASIN C2-CID 0.70 0.64 0.81 0.78 0.83 0.66 C100 = 1.25*C2 0.87 0.80 1.00 0.98 1.00 0.83 DESIGN POINT AREA C2 C100 1 1.05 0.71 0.89 2 1.29 0.65 0.81 PLOW SUMMARY FOR LOT & 2 EVERGREEN PARK PAGE 1 0 DESIGN CONTRIBUTING AREA C2 C10 C100 Tc Tc I2 ISO I100 Q2 Q10 Q100 DESIGN POINT SUB 2,10 100 BASINS) ac. min. min iph iph iph cfe cfe cfe w rtrtwwrtt+xrtwwrrrxx+xrtwwrtwrrtwrrr+♦rxxxrtrtwrrrrrr+xwwrrrr+ttxxrtwrtrt+r+++xrxrwxwxrtxxxrtwxxtxxxrtxrrtiwrrwrrw DEVELOPED SITE 1 Aw & ROWSOUTH 1.05 0.71 0.71 0.89 10.00 10.00 2.54 4.45 7.14 1.91 3.34, 6.69 DETAIN 2 Ae & ROWNORTH 1.29 0.65 0.65 0.81 10.00 0.00 2.54 4.45 7.14 2.13 3.72 7.47 UNDET HISTORIC SITE 2 Aw & Ae 2.12 0.20. 0.20 0.25 33.50 32.00 1.47 2.60 4.20 0.62 1.10 2.23 HISTORIC APPENDIX I Storm Drainage Calculations PAGE 8 Final Drainage and Erosion Control Report Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park VI. VARIANCE REQUEST: A. Variance from City of Fort Collins requirements (Continued) 2. The constraints on the grading caused by the site topography and the ADA requirements do not allow us to provide the required freeboard. 3. The detention requirements within the Evergreen - Greenbriar basin and the topography of the site do not allow us to meet the separation or maximum depth requirements. VII. CONCLUSIONS: A. Compliance with Standards 1. All drainage analysis has been performed according to the requirements of the City of Fort Collins Storm Drainage Criteria Manual and the City of Fort Collins policy. 2. All Erosion Control design complies with the City of Fort Collins Erosion Control Reference Manual and generally accepted practices. B. Drainage Concept 1. The drainage design for Lots 1 and 2, Block 5, Replat (No: 1) of Evergreen Park is in accordance with the City of Fort Collins requirements, except as noted in the variance requests, and the recommendations of the Amended Greenbriar/Evergreen Master Drainage Plan. 2. There will be no adverse downstream effects due to the development of the site. VIM REFERENCES: 1. Fort Collins Storm Drainage Criteria Manual 2. Urban Drainage and Flood Control District Drainage Criteria Manual 3 Greenbriar-Evergreen Park Master Drainage Plan; Engineering Professionals 4. Final Utility plans for MAJOR STORM DRAINAGEWAY FOR EVERGREEN PARK; Engineering Professionals; EPI Project No: 97-1; plans dated March, 1981 5. The Amended Greenbriar-Evergreen Basin Master Drainage Plan; Lidstone & Anderson, Inc.; Project No COTST05.4; dated May, 1996 PAGE 7 Final Drainage and Erosion Control Report Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park V. EROSION CONTROL: A. General Concept 1. Erosion control measures will be as identified on the Drainage and Erosion Control Plan. 2. An erosion control security deposit is required in accordance with City of Fort Collins policy (Chapter 7, Section C : SECURITY; page 7.23 of the City of Fort Collins Development Manual). In no instance shall the amount of the security be less than $ 1000.00. 3. According to current City of Fort Collins policy, the erosion control security deposit is figured based on the larger amount of 1.5 times the estimated cost of installing the approved erosion control measures or 1.5 times the cost to re -vegetate the anticipated area to be disturbed by construction activity. 4. Refer to the security deposit document located in Appendix Il of this report. B. Specific Details 1. Temporary erosion control measure to be installed on the site during construction include: a. Silt fence along the south and east property lines b. Gravel inlet filter at the outlet device on the west side of the site. VI. VARIANCE REQUEST: A. Variance from City of Fort Collins requirements 1. With this report, the developer is formally requesting the following variances from: a. the requirement that one (1') foot of freeboard be provided in the detention pond, b. the requirement that a foot and a half (1.5') of vertical separation between the 100- year water surface elevation and the proposed finished floor of the buildings be provided. We are requesting that the minimum separation be reduced to one (1.0) foot. c. the requirement that the maximum depth of water in a parking lot be less than one (1') foot. We are requesting that the maximum depth be increased to one and a half (1.5') feet. PAGE 6 Final Drainage and Erosion Control Report Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park IV. DRAINAGE FACILM DESIGN: B. Specific Details (continued) 3 The detention pond in the western portion of the site is sized using the Cumulative Runoff method. a. The runoff coefficient utilized with the Cumulative Runoff method for sizing the detention pond is 0.89. b. The release rate from the western detention pond is 0.50 cfs. This is based on the 0.47 cfs/acre recommended by the amended Greenbriar-Evergreen Master Drainage Plan. 4 The area used to determine the release rate from the western pond consists of the 1/2 R.O.W. of Blue Spruce Drive and sub -basin Aw. The total area equals 1.05 acres. (Refer to page 6 in the calculations). a. The required detention pond storage volume according to the Cumulative Runoff method, utilizing a runoff coefficient of 0.89 is 7006 cubic feet. Refer to page 6, Appendix I for the detention pond volume calculations. b. The actual volume provided in the detention pond is 9767 cubic feet. Refer to page 7, Appendix I for the Stage -Storage calculations. The required 100-year W.S.EI based on the stage storage curve is 71.69 feet. c. The finished floor elevation for the building on lot 1 is set at an elevation of 73.35 feet. d. The finished floor elevation for the building on lot 2 is set at an elevation of 72.76 feet. e. The estimated 100-Year Water Surface Elevation (W.S.EI.) in the pond is 71.76 feet. Refer to page 8, Appendix I for the hydraulic analysis of the outlet structure. f. The freeboard provided is 0.26 feet. g. The separation provided between the estimated 100-Year W.S.EI. and the finished floor elevation of the building on lot 1 is 1.59 feet. h. The separation provided between the estimated 100-Year W.S.EI. and the finished floor elevation of the building on lot 2 is 1.0 feet. 5. The outlet structure will consist of a headwall with a 15" pipe and an orifice plate with a 4" diameter hole at the upstream invert. A 4' wide curbed channel and a sidewalk culvert will also be installed to convey the stormwater to Blue Spruce Drive. Refer to page 8, Appendix I for the hydraulic analysis of the outlet structure. PAGE 5 Final Drainage and Erosion Control Report Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park IV. DRAINAGE FACILITY DESIGN: A. General Concept 1. The stormwater from the site will be directed to the east and west by creating a high point approximately 260 feet east of the west property line. 2. Detention pond release from the western portion of the property (sub -basin Aw) will occur near the southwest corner of Lot 2. a. The outlet will consist of curbed channel and sidewalk culvert to the flowline of the existing Blue Spruce Drive curb and gutter. b. A restriction device will reduce flows to Blue Spruce Drive and create a detention pond in the parking area. c. Flows are conveyed south in the Blue Spruce Drive flowline to Conifer Street. B. Specific Details 1 A preliminary channel design was done for the channel on the north side of the site by Lidstone and Anderson in the amended Greenbriar-Evergreen Master Drainage Plan. The preliminary channel geometry, design flow and capacity are summarized below. a. Bottom width b. Marmings n C. Slope d. Side slopes e. Design Flow f. Depth g. Top width h. Flow depth i. Freeboard j. Flow capacity = 30.0 feet = 0.060 = 0.0025 ft/ft = 4:1 (Run: Rise) = 80.0 cfs = 2.5 feet = 50.0 feet = 1.52 feet = 0.98 feet = 195.0 cfs 2 Channel cross sections done with this project indicate that the channel does not conform to the original design by EPI or the design by Lidstone and Anderson done with the Amended Greenbriar-Evergreen Master Drainage Plan. PAGE 4 Final Drainage and Erosion Control Report Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park M. DRAINAGE AND EROSION CONTROL DESIGN CRITERIA: B. Development Criteria Reference and Constraints 1. Previous studies which were considered include: a. Greenbriar-Evergreen Park Master Drainage Plan; Engineering Professionals b. The Amended Greenbriar-Evergreen Basin Master Drainage Plan; Lidstone & Anderson, Inc.; Project No COTST05.4; dated May, 1996. 2. Blue Spruce Drive is developed and paved. 3. New American Disabilities Act (ADA) requirements affect the final parking lot grading design. Maximum allowable design grades for handicap parking, and access from the public right-of-way effect the drive and parking lot final grading which typically affects detention volumes. C. Hydrological Criteria 1. The Rational method (Q = CIA) was used to determine the pre -developed and post development peak flows for the 10 and 100-year storm events (commercial requirements). 2. The Cumulative Runoff Method was used to determine the required detention volume for the portion of the property that will be located in basin 4U after development of the site. a. The 100-Year storm was used as the design storm. 3. The release rate from the onsite detention pond located in the western portion of the site is based on the requirements of the Amended Greenbriar-Evergreen Basin Master Drainage Plan (0.47 cfs/acre). a. The area used to size the pond consists of that portion of the site and 1/2 ROW of Blue Spruce Drive which are located in Basin 4U as delineated on this Drainage and Erosion Control plan 4. Stormwater from Basin 3B is released undetained to the Evergreen West regional detention pond in accordance with the recommendations of the Amended Greenbriar- Evergreen Basin Master Drainage Plan. D. Hydraulic Criteria 1. Orifice and weir equations and coefficients suggested by the City of Fort Collins Storm Drainage Criteria Manual were used. PAGE 3 Final Drainage and Erosion Control Report Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park II. DRAINAGE BASINS AND SUB -BASINS: B. Sub -Basin Description (continued) 5. Existing site grades indicate that historic flows are conveyed east and north towards the Evergreen West detention pond and outfall channel which are located within Basin 3B of the preliminary amended Greenbriar-Evergreen Master Drainage Plan. 6. We met with the City of Fort Collins Stormwater Utility to discuss the master plan basin delineation and the actual basin delineation. The grading of the site will create a new basin delineation between basin 4U and 3B. This new delineation will not affect the overall areas of the basins as shown on amended Greenbriar-Evergreen Master Drainage Plan. 7. There is an existing drainage channel along the north property line of Lot 1, Block 5 which conveys storm water from the storm sewer under Blue Spruce Drive to the Evergreen West Pond. a. The channel is located along the common property line of Lot 1, Block 5 of Evergreen Park and Coachlight Plaza PUD. b. There is an existing sixteen (16') foot Utility and Drainage easement along the south side of the north property line of lot 1 as shown on the plat of Replat (No. 1) of Evergreen Park. c. There is an existing thirty (38') foot Utility and Drainage easement along the north side of the south property line of lot 1 as shown on the replat of Coachlight Plaza PUD. III. DRAINAGE AND EROSION CONTROL DESIGN CRITERIA: A. Regulations 1. All storm drainage design criteria from the City of Fort Collins Drainage Criteria Manual was followed. 2. Storm Drainage design criteria modification was considered based on data provided by City of Fort Collins Stormwater Utility personnel concerning conclusions presented with the amended Greenbriar-Evergreen Park Master Drainage Plan. 3. All erosion control design criteria from the City of Fort Collins Erosion Control Reference Manual. PAGE 2 Final Drainage and Erosion Control Report Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park II. DRAINAGE BASINS AND SUB -BASINS: B. Sub -Basin Description 1. According to the Amended Greenbriar-Evergreen Master Drainage Plan the western portion of both lots are situated within Basin 4U (undeveloped) as defined on the amended Greenbriar-Evergreen Basin Master Drainage Plan. See the Exhibit from the amended Greenbriar-Evergreen Basin Master Drainage Plan included with the Drainage and Erosion Control Plan in the stuffer envelope. Based on the existing site topography the entire site should be situated in Basin 3B. a. Page 20 of the draft of Amended Greenbriar-Evergreen Basin Master Drainage Plan states the following: BASIN 4U. The basin was assumed to be completely developed for commercial use with an estimated imperviousness of 90 percent. On -site detention would be required for this basin. The allowable release from this basin is 17 cfs, or 0.47 cfs/acre. The designated release point for Basin 4U is the storm sewer and street along Conifer Street which convey flows easterly to Pond 5 (conceptual). The detention volume required for the basin, in order to meet the prescribed release rate, was estimated to be 6.4 acre feet. 2. According to the Amended Greenbriar-Evergreen Master Drainage Plan the eastern portion of both lots are situated within Basin 3B as defined the amended Greenbriar- Evergreen Basin Master Drainage Plan. See the Exhibit from amended Greenbriar- Evergreen Park Master Drainage Plan included with the Drainage and Erosion Control Plan in the stuffier envelope. a. Page 19-20 of the draft of the Amended Greenbriar-Evergreen Basin Master Drainage Plan states the following: BASIN 3B. The basin was assumed to be developed for 37 percent commercial use, and 63 percent residential housing at levels representing 11, 49 and 3 percent of the entire basin for high, medium and low densities, respectively. The result is a developed imperviousness of 63 percent. On -site detention would not be required for this basin: storm water runoff would be transported to the existing Evergreen West Pond. Overflow from this pond would enter the existing outlet channel which would transport flow southerly to Pond 5 (conceptual). 3. All of Lot 1 is situated in Basin 3B based on the existing topography of the site and the street. There is a high point located approximately 40' north of the south property line of lot 1 and the existing site topography slopes to the east. 4. All of Lot 2 is is situated in Basin 3B based on the existing topography of the site. PAGE 1 Final Drainage and Erosion Control Report Lots 1 & 2,1 Block 5, Replat (No. 1) of Evergreen Park L GENERAL LOCATION AND DESCRIPTION: A. Location 1. Lots 1 and 2, Block 5, Replat (No. 1) of Evergreen Park is located in the Northeast One - Quarter of Section 1, 17N, R69W of the 6th P.M., Ft. Collins, (Larimer County), Colorado. These are existing platted lots. 2. More specifically, Lots 1 and 2, Block 5, Replat (No. 1) of Evergreen Park are located on the east side of Blue Spruce Drive approximately 1000 feet north of Conifer Drive in the Northeast part of Fort Collins, Colorado (See Vicinity Map). a. Blue Spruce Drive is an existing street with sewer, water, curb and gutter and street paving installed. These improvements were installed with the final utility plans for Replat (No. 1) of Evergreen Park. 3. This project will consist of two (2) warehouse style buildings and the necessary parking for the intended use. B. Description of Property 1. There is an existing foundation on the site. This foundation will be removed and two (2) buildings will be constructed. The remainder of the site is undeveloped. Existing ground cover consists primarily of native dry land grasses. 2. The site area of lot 1 is approximately 54,087 square feet (1.24 acres). 3. The site area of lot 2 is approximately 38,300 square feet (0.88 acres). 4. An existing regional detention pond (Evergreen West Pond) and outfall channel is located south and east of this property (See Drainage and Erosion Control Plan in stuffer envelope). 5. There is an existing channel along the north property line of lot 1 which conveys stormwater to the Evergreen West Pond. 6. There are no irrigation canals or systems located on or within 100' of the project site. II. DRAINAGE BASINS AND SUB -BASINS: A. Major Basin Description 1. The site is situated within the Greenbriar-Evergreen Drainage Basin as designated on the City of Fort Collins Stormwater Basin Map. The Master Drainage Plan for the Greenbriar-Evergreen Basin is currently being amended. a. The Basin fee rate for the Greenbriar-Evergreen Basin is $ 10,000 per gross acre according to the development fee section of . the City of Fort Collins Development Manual. This may be reduced if detention is provided. No Text March 24, 1997 IZCNO6R H E A A INEERING Project No: 1466-14-96 PORATION Basil Hamdan City of Ft. Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80524 Re: Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park; Ft. Collins, Colorado Dear Basil, Enclosed, please find the Final Drainage and Erosion Control Report for Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park. The hydrology data and the hydraulic analysis presented in this report complies with the requirements of the City of Fort Collins Storm Drainage Criteria Manual; dated March, 1984, and the Erosion Control Reference Manual. The report also complies with the recommendations of the Amended Greenbriar-Evergreen Basin Master Drainage Plan; Lidstone & Anderson, Inc.; Project No COTST05.4; dated May, 1996. If you have any questions or comments, please call me or Mark Oberschmidt at 226-5334. Sincerely, Brian W. Shear, P.E. Shear Engineering Corporation BWS / meo cc: Premier Custom Homes 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1 Final Drainage and Erosion Control Report for LOTS 1 & 2, BLOCK 5, REPLAT (NO. 1) OF EVERGREEN PARK Fort Collins, Colorado Prepared for: Premier Custom Builders,,Inc. 401A South Link Lane Ft. Collins, Colorado 80524 1N5 TEAL ZU MITTAL Prepared by: SHEAR ENGINEERING CORPORATION Project No: 1466-14-96 DATE: March, 1997 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1