Loading...
HomeMy WebLinkAboutGOOD SAMARITAN VILLAGE - FDP - 27-96C - CORRESPONDENCE -to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City Street repair standards.' (See redlines for any additional comments) Development Review Comments — Page 2 DATE: March 14, 2001 REVISION COMMENT SHEET DEPT: ENGINEERING PROJECT: #27-96C Good Samaritan PDP PLANNER: Troy Jones ENGINEER: Marc Virata All comments must be received by: April 4, 2001 ❑ No Problems 0 Problems or Concerns (see below or attached) Plat Comments: 1. Please replace the plat language with the newer language emailed in electronic format. 2. The building envelopes should not encroach within easements. Please redefine the building envelopes to be outside of any easements. Site Plan Comments: 1. (Repeat comment) The site plan still indicates that curb and gutter on Constellation Drive adjacent to this site is to remain. Please correct. (Repeat comment) Coordinate the ped refuge design with the utility plan (see Utility il:ty Plan Ceflunent 43* Utility Plan Comments 1. The General Notes have since been revised. An electronic version of this was emailed to the engineer. 2. Constellation Drive design needs to be relooked at. A uniform street cut should be designed in order to not compromise pavement integrity. The cut should result in a consistent cross slope from the centerline of Constellation Drive and may necessitate removal to the centerline of the roadway. Note that the removal and replacement to the centerline may actually be easier and cheaper from a construction standpoint rather than the proposed jagged sawcut design. 3. Indicate on the Trilby Road plan and profile that new vertical curb and gutter is to be installed. 4. In general on the street plan and profile streets and intersection details, please ensure that STA's match between plan and profile view, ensure that the spot elevation on the plan and profile sheet matches the intersection details sheet, and indicate on the plan and profile sheets where STA's also are PCR's. 5. As opposed to referencing the General Notes, please provide a note next to each instance where an asphalt patch is shown indicating the following: "Limits of street repair are approximate. Final limits Date: April 12, 2001 Signature: PLEASE SEND COPIES OF MARKED REVISION El Plat 21 Site 21 Utility El Landscape ❑ Drainage Report 0 NO COMMENTS -SUBMIT MYLARS APR-12-2001 06:29 • FCLWD/SFCSD P.01 FORT COLLINs•LOVfLAND WAm. DI nwr \ SOUTH FORT COLL[NS SANITATION D1STi2ICT April 12, 2001 Mr. Troy Jones, Planner City of Fort Collins P.O. Box 580 Fort Collins, CO 80525 RE: Fort Collins Good Samaritan Village Dear Mr. Jones, The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned project and is prepared to sign the construction drawings. The owner/developer is responsible for all costs associated with this project and to comply with District requirements and all previous comments. The District has been contacted regarding changes to the drawings, such as single water and sanitary sewer taps to each structure rather than two as currently shown. The District would prefer that any changes at this point be submitted for review and approval prior to sign -off on the construction drawings. Please do not hesitate to contact me at 226-3104, ext. 14, if you have any questions or require additional information. Respectfully, �� Mr. Terry W. Farrill Systems Engineer xc: W. Michael D. DiTullio, District Manager r andmark Engineering Ms. Sherry Friesen, OcmASamtardm Village 5150 Snead Drive, Fort Collins, CO $0525 Phone (970) 226-3104 Fax (970) 226-0186 TOTAL P.01 Ferril from the Fort Collins - Loveland Water District to sign the mylars before you bring them in for City staff signatures. If you have any questions about these or any other issues related to this project please feel free to call me at 221-6750. Y urs truly, � JI Tr y)ones City Planner 2 Commr, y Planning and Environmental _rvices Current Planning City of Fort Collins STAFF REVIEW COMMENTS Kim Lambrecht Landmark Engineering 3521 W. Eisenhower Blvd. Loveland, CO 80537 April 12, 2001 Staff reviewed the Submittal of the Good Samaritan Village PDP and offers the following comments. COMMENTS: 1. Stormwater, Transportation Planning, Traffic Operations, Fort Collins - Loveland Water District: a. These departments have no problems, and are ready for mylars. 2. Fort Collins - Loveland Water District, Engineering: a. Please seethe attached comment sheets from these departments and agencies. 3. Current Planning: a. Section 2.2.11 of the Land Use Code requires that an applicant submit revisions based on this letter within 90 days or the project application becomes null and void. Your response to the City's concerns is due by July 11, 2001. A 30 day extension to this deadline is available. All requests for an extension should be directed to the Current Planning Director. If remaining issues are those that do not require plan revisions, a status report verifying continuing efforts toward resolving the issues is required within the same timeline. b. As soon as you have resolved the Water District and Engineering Department comments, we are ready for mylars. At that time, please submit mylars and one paper copy of the 6 page planning set (site plan, landscape plan, and elevations), the plat, and the utility plan set. You should get Terry 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020