HomeMy WebLinkAboutRAMADA LIMITED SUITES PUD - PRELIMINARY/FINAL - 16-96 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYCenter For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
Intersection Performance Summary
F1owRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ------ ------------------ ---------------
EB L 9 304 > > >
376 9.9 B 9.9
EB R 4 811 > > >
NB L 4 1029 3.5 A 0.0
Intersection Delay = 0.4
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
458
Potential Capacity: (pcph)
811
Movement Capacity: (pcph)
811
Prob. of Queue -free State:
1.00
--------------------------------------------------------
Step 2: LT from Major Street SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
465
Potential Capacity: (pcph)
1029
Movement Capacity: (pcph)
1029
Prob. of Queue -free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -free State:
0.99
--------------------------------------------------------
Step 3: TH from Minor Street WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
930
Potential Capacity: (pcph)
355
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
353
Prob. of Queue -free State:
1.00
--------------------------------------------------------
Step 4: LT from Minor Street WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
930
Potential Capacity: (pcph)
306
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
--------------------------------------------------------
304
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
File Name ................
Streets: (N-S) MASON
Major Street Direction....
Length of Time Analyzed...
Analyst ...................
Date of Analysis..........
Other Information.,........
NS
60 (min)
EGC
5/12/96
ST AM
(E-W) DRIVE
Two-way Stop -controlled Intersection
------------------------------------ ------------------------------
----------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes
01 0 0 0 0
Stop/Yield
Volumes
PHF
Grade
MCI M
SU/RV's ($)
CV's M
PCE's
0>
1 0
N
4
467
.95
.95
0
0
0
0
0
0
0
1.1
1.1
0 J.
0
N
452
13
.95
.95
0
0
0
0
0
0
0
1.1
---------------
1.1
S
0
4
.95
.95
.95
0
0
0
0
0
0
0
0
0
0
1.1
---------------
1.1
1.1
Adjustment Factors
----------------
0
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
Intersection Performance Summary
F1owRate
MoveCap SharedCap
Avg.Total
Delay
Movement
v(pcph)
Cm(pcph) Csh(pcph)
------
Delay
------------
LOS By App
---------------
--------
EB L
------
8
------
605 >
>
>
705
5.2
B 5.2
EB R
4
1055 >
>
>
NB L
4
1319
2.7
A 0.0
Intersection Delay =
0.5
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
233
Potential Capacity: (pcph)
1055
Movement Capacity: (pcph)
1055
Prob. of Queue -free State:
1.00
--------------------------------------------------------
Step 2: LT from Major Street SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
239
Potential Capacity: (pcph)
1319
Movement Capacity: (pcph)
1319
Prob. of Queue -free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -free State:
1.00
--------------------------------------------------------
Step 3: TH from Minor Street WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
417
Potential Capacity: (pcph)
659
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
657
Prob. of Queue -free State:
1.00
--------------------------------------------------------
Step 4: LT from Minor Street WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
417
Potential Capacity: (pcph)
607
Major LT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
--------------------------------------------------------
605
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
File Name ............
Streets: (N-S) MASON
Major Street Direction....
Length of Time Analyzed...
Analyst... .. ..........
Date of -Analysis..........
Other Information.........
(E-W) DRIVE
NS
60 (min)
EGC
5/12/96
ST PM
Two-way Stop -controlled Intersection
------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI M
SU/RVIs M
CV's M
PCEIs
------------
0>
1 0
N
4
180
.95
.95
0
0
0
0
0
0
0
1.1
1.1
0 l<
0
N,
227
12I
.95
.95
0
0
0
0
0
0
0
1.1
1.1
��t�4
7
0
4
.95
.95
.95
0
0
0
0
0
0
0
0
0
0
1.1
----------------
1.1
1.1
Adjustment Factors
0
0
0
----------------
0
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
Intersection Performance Summary
F1owRate
MoveCap SharedCap
Avg.Total
Delay
Movement
v(pcph)
Cm(pcph) Csh(pcph)
Delay
------------
LOS By App
---------------
--------
WB L
------
65
------ ------
266
17.9
C
9.3
WB R
136
823
5.2
B
SB L
ill
1018
4.0
A 0.8
Intersection Delay =
1.7
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph)
446
Potential Capacity:
(pcph)
823
Movement Capacity:
(pcph)
823
Prob. of Queue -free
State:
0.83
--------------------------------------------------------
Step 2: LT from Major Street
SB NB
--------------------------------------------------------
Conflicting Flows:
(vph)
475
Potential Capacity:
(pcph)
1018
Movement Capacity:
(pcph)
1018
Prob. of Queue -free
State:
0.89
--------------------------------------------------------
Step 4: LT from Minor
Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph)
950
Potential Capacity:
(pcph)
298
Major LT, Minor TH
Impedance Factor:
0.89
Adjusted Impedance
Factor:
0.89
Capacity Adjustment
Factor
due to Impeding Movements
0.89
Movement Capacity:
---------------------------------------------------------
(pcph)
266
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
*,r«******«**,t*w*w,rr,t****,tw**,t,t*««w**««**,r,t,r**,t*****w,t****•«,t****
FileName ................
Streets: (N-S) MASON (E-W) BOARDWALK
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst.. EGC
Date of Analysis.......... 5/12/96
Other Information......... 1996 ST AM
Two-way Stop -controlled Intersection
-------------------------------------- -----------------------------
-------------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---
0 ' n 1
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MCI M
SU/RVIs M
CVIs M
PCEIs
------------
0 l<
0
N
416
59
.95
.95
0
0
0
0
0
0
0
1.1
--------------
1.1
1
1 0
N
96
409
.95
.95
0
0
0
0
0
0
0
1.1
1.1
0
0
----------------
0
Adjustment Factors
56
118
.95
.95
0
0
0
0
0
0
0
1.1
----------------
1.1
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------.------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
Intersection Performance Summary
F1owRate
MoveCap SharedCap
Avg.Total
Delay
Movement
v(pcph)
Cm(pcph) Csh(pcph)
Delay
------------
LOS By App
---------------
--------
WB L
------
65
------ ------
558
7.3
B
4.8
WB R
136
1122
3.7
A
SB L
61
1396
2.7
A 0.5
Intersection Delay =
1.6
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1:'RT from'Minor Street WB. EB
Conflicting Flows:
(vph)
180
Potential Capacity:
(pcph)
1122
Movement Capacity:
(pcph)
1122
Prob. of Queue -free
State:
0.88
--------------------------------------------------------
Step 2: LT from Major Street
SB NB
--------------------------------------------------------
Conflicting Flows:
(vph)
187
Potential Capacity:
(pcph)
1396
Movement Capacity:
(pcph)
1396
Prob. of Queue -free
State:
0.96
--------------------------------------------------------
Step 4: LT from Minor Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph)
446
Potential Capacity:
(pcph)
584
Major LT, Minor TH
Impedance Factor:
0.96
Adjusted Impedance
Factor:
0.96
Capacity Adjustment
Factor
due to Impeding Movements
0.96
Movement Capacity:
--------------------------------------------------------
(pcph)
558
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
File Name ................
Streets: (N-S) MASON
Major Street Direction....
Length of Time Analyzed...
Analyst... .. ..........
Date of Analysis..........
Other Information.........
NS
60 (min)
EGC
5/12/96
1996 ST
(E-W) BOARDWALK
PM
Two-way Stop -controlled Intersection
------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's M
CV's M
PCE's
------------
0 1<
0
N
172
15
.95
.95
0
0
0
0
0
0
0
1.1
1.1
1
1 0
N
52
215
.95
.95
0
0
0
0
0
0
0
1.1
----------------
1.1
0
0
0
----------------
0
Adjustment Factors
1 0 1
56
118
.95
.95
0
0
0
0
0
0
0
1.1
•---------------
1.1
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
«***,t,t**,t**,t**«,tw**,t,r*****,t,t,t**rt,t,t**********,tr,t,t*****,r*+t***•,r***
Intersection Performance Summary
F1owRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ------ ------------------ -------------
WB L 45 281 15.3 C
7.7
WB R 133 840 5.1 B
SB L 108 1043 3.9 A 0.7
Intersection Delay = 1.4
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
428
Potential Capacity:
(pcph)
840
Movement Capacity:
(pcph)
840
Prob. of Queue -free
State:
0.84
--------------------------------------------------------
Step 2: LT from Major Street
SB NB
--------------------------------------------------------
Conflicting Flows:
(vph)
453
Potential Capacity:
(pcph)
1043
Movement Capacity:
(pcph)
1043
Prob. of Queue -free
State:
0.90
--------------------------------------------------------
Step 4: LT from Minor
Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph)
914
Potential Capacity:
(pcph)
313
Major LT, Minor TH
Impedance Factor:
0.90
Adjusted Impedance
Factor:
0.90
Capacity Adjustment
Factor
due to Impeding Movements
0.90
Movement Capacity:
--------------------------------------------------------
(pcph)
281
0
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
***,r«*w**,t*,r***«******,r**,r*«****,r***•,r,rw**,r****wr,r*******,r,r,r««,r•
File Name
Streets: (N-S) MASON (E-W) BOARDWALK
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst... ........... EGC
Date of Analysis.......... ,5�/12/96
Other Information......... ST AM
Two-way Stop -controlled Intersection
------------------ -------------------------------------------------
------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
No. Lanes
Stop/Yield
Volumes
PHF
Grade
MC's M
SU/RV's M
CV's M
PCE's
------------
0 l<
0
N
402
51
.95
.95
0
0
0
0
0
0
0
1.1
---------------
1.1
1
1 0
N
93
393
.95
.95
0
0
0
0
0
0
0
1.1
----------------
1.1
0
0
0
----------------
0
Adjustment Factors
1 0 1
39
115
.95
.95
0
0
0
0
0
10
0
1.1
----------------
1.1
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------=-----
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
Intersection Performance Summary
FlowRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ------ ------------------ ---------------
WB L 19 576 6.5 B
4.6
WB R 25 1136 3.2 A
SB L 58 1415 2.7 A 0.5
Intersection Delay = 0.7
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph) •
170
Potential Capacity:
(pcph)
1136
Movement Capacity:
(pcph)
1136
Prob. of Queue -free
State:
0.98
--------------------------------------------------------
Step 2: LT from Major Street
SB NB
--------------------------------------------------------
Conflicting Flows:
(vph)
175
Potential Capacity:
(pcph)
1415
Movement Capacity:
(pcph)
1415
Prob. of Queue -free
State:
0.96
--------------------------------------------------------
Step 4: LT from Minor Street
WB EB
--------------------------------------------------------
Conflicting Flows:
(vph)
425
Potential Capacity:
(pcph)
601
Major LT, Minor TH
Impedance Factor:
0.96
Adjusted Impedance
Factor:
0.96
Capacity Adjustment
Factor
due to Impeding Movements
0.96
Movement Capacity:
--------------------------------------------------------
(pcph)
576
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
File Name ................
Streets: (N-S) MASON
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst.. • EGC
.
Date of Analysis......... 5 12/96
Other Information........1996 ST
(E-W) BOARDWALK
PM
Two-way Stop -controlled Intersection
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 0 0 1 0 1
Stop/Yield
Volumes
PHF
Grade
MCI M
SU/RV's M
CV's M
PCE's
------------
0 1<
0
N
165
10
.95
.95
0
0
0
0
0
0
0
1.1
1.1
1
1 0
N
50
205
.95
.95
0
0
0
0
0
0.
0
1.1
----------------
1.1
0
---------------
0
Adjustment Factors
16
22
.95
.95
0
0
0
0
0
0
0
1.1
----------------
1.1
vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
Conclusions
Based upon the above documented investigations, analyses, and findings, the following
can be concluded:
• Acceptable roadway operations currently exist in the area of the site.
• The proposed hotel development will generate an estimated 27 morning peak
hour trips, 29 afternoon peak hour trips, and 334 trips per day.
• In the short-term, site generated traffic is not expected to cause a noticeable
impact on roadway operations.
• With the hotel fully developed and with the existing roadway geometry,
intersection operations are expected to replicate current conditions .
• No adverse impacts are expected with the proposed hotel.
In summary, the hotel development can be efficiently and easily serviced by the existing
street system. Furthermore, since operating levels -of -service are expected to remain
stable whether or not the hotel is constructed, the hotel is not expected to adversely
impact the adjacent street system. Given these findings, no roadway improvements are
recommended in conjunction with this development.
I trust this letter report will meet your current needs. Please feel free to call me should
you have any questions or need additional information.
Sincerely,
4Eue G. Coppola, P. .
0
N
N
oi�
NIA �I0
�� o0
M
N N
NI j N
.— 00
R
W�_ 0/23
0/118
8/24
AC 9/56
1 1
"I co L
r, � �
N N OR
Driveway
7n
4/4
4/4
v v
olo
LEGEND: AM Site/Total
PM Site/Total
1
N
Boardwalk
Figure 3
SHORT-TERM
PEAK HOUR TRAFFIC
As shown above, the hotel is expected to generate 27 morning peak hour trips, 29
afternoon peak hour trips, and 334 trips per day.
Future Traffic Conditions
Site traffic was assigned to the adjacent street system via the Mason Street access
drive. The assignment was made in general conformance with current directional traffic
flows. Background traffic was estimated by increasing current traffic to reflect late 1996
or 1997 conditions. Future peak hour traffic volumes at the access drive and Board-
walk Drive intersections along Mason Street are shown on Figure 3.
Capacity analyses were performed using short-term traffic volumes (site and back-
ground) and the existing roadway geometry. Resultant operating levels -of -service are
presented below.
INTERSECTION
APPROACH-
MOVEMENT
PEAK HOUR
LEVEL -OF -SERVICE
AM
PM
Mason - Boardwalk
(Stop Sign)
WB LT
B
C
WB RT
A
B
SB LT
A
A
Mason - Access
(Stop Sign)
EB LT/RT
B
B
NB LT
A
A
As shown above, acceptable operations can be expected with the hotel fully opera-
tional. Furthermore, future levels -of -service are expected to replicate current levels -of -
service without any supplemental roadway geometry.
c
0
0
m
2
cM
O
(M cM
a)
O O
N L0
M
Legend: AM /PM
0 1
Figure 2
CURRENT PEAK HOUR TRAFFIC
Under current conditions, only the Mason Street - Boardwalk Drive intersection needs to
be investigated. In the short-term, this intersection and the Mason Street driveway to
the hotel should be evaluated. Short-term was defined as the opening of the hotel.
Existing Conditions
Morning and afternoon peak hour traffic counts were taken at the Mason Street -
Boardwalk Drive intersection. This data is presented on Figure 2. Using Highway
Capacity Manual procedures, intersection operations were evaluated. Mason Street
has one lane in each travel direction with a southbound left turn lane at the Boardwalk
Drive intersection. On Boardwalk Drive, a left turn and a right turn lane are provided.
Resultant levels -of -service are stated below.
INTERSECTION
APPROACH-
MOVEMENT
PEAK HOUR
LEVEL -OF -SERVICE
AM
PM
Mason - Boardwalk
(Stop Sign)
WB LT
B
C
WB RT
A
I B
SB LT
A
I A
Site Traffic
Using Institute of Transportation Engineers (ITE) trip generation rates, site traffic
volumes were estimated. Since site traffic is a function of the number of occupied
rooms, a 70 percent occupancy rate was assumed. This rate is typically used within the
hotel industry. Resultant site traffic is presented below.
Daily
AM Pk Hr
PM Pk Hr
Rate
Trips
Rate
In
Out
Rate
In
Out
7.27
334
0.58
16
11
0.62
17
12
'
L6d
3
4
N.";
FEEFI■
■
II
I
I)
BOARDWALK DRIVE
r
LOT
f�l
Do ctive
4pulom
7111��
�nununuumnu n'
1;�11
o
I
i
y
�
I
LOT 7
IP
Ft�
I i
I I
I
I ° .
I
I
I
W I
Z
W
a
W
I
Figure 1
CONCEPT PLAN
1DAMADALMOM
EUGENE G. COPPOLA
P.O. Box 260027
Littleton, CO 80126-0027
303-792-2450
May 15, 1996
Mr. George Holter
Holter Realty
3501 S. Mason
Fort Collins, CO 80525
RE: Traffic Impacts of Proposed Ramada Suites Hotel
West Side of Mason Street at Boardwalk Drive - Ft. Collins, CO
Dear Mr. Holter:
I have evaluated the traffic impacts of the above referenced Ramada Suites project.
Key elements of the evaluation are documented in capsule form in the following
sections of this letter report.
Project Description
The hotel will cater to business travellers. It will have 66 units, all of which will be
constructed at the same time. No restaurant, lounge, or banquet facilities are planned
in conjunction with the hotel. The current development schedule indicates ground
breaking in August, 1996 and completion during December of 1996 or early in 1997.
The site will have access to Mason Street via a shared driveway with the lot to the south
which is currently undeveloped (See Figure 1).
Agency Discussions
A meeting was held with Eric Bracke concerning the elements of this study. At that
meeting, it was determined that a brief analysis would suffice given the amount of traffic
expected from the site, the area surrounding the site, and the expedited development
schedule. Mr. Bracke requested that current and short-term conditions be evaluated.