Loading...
HomeMy WebLinkAboutEVERGREEN PARK REPLAT (NO. 1), BLOCK 5, LOTS 1 & 2 - PDP/FDP - 24-96A - CORRESPONDENCE - REVISIONS (4)July 6, 1998 Page 3 Project No: 1466-14-96 Site Cross Sections * The lot numbers have been corrected. * The 100-year HWL and freeboard are now shown on the channel sections on sheet 5. * The existing 16' drainage and utility easement has been labeled on the cross sections. * An additional 9' drainage easement has been added on the south side of the existing 16' easement. This has also been labeled on the cross sections. Detail Sheet * Riprap details are provided * A detail of the outlet structure is provided. This concludes our response to your review comments concerning the final utility plans for Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park. If you have further questions or comments, or if you require additional information, feel free to contact us at 226-5334. Sincerely, Mark Oberschmidt, Shear Engineering Corporation LPK / meo Reviewed by, Lar P. Ketcham, P.E. Shear Engineering Corporation cc: Dave Phillips; Premier Custom Homes Leanne Harter-, City of Fort Collins Planning Ward Stanford, City of Fort Collins Engineering Tom Dugan; Pinecrest Planning and Design No Text Section.3.4:1 of the City's Land Use Code requires a natural area buffer zone from 100 to 300. feet from any natural area. On'June 26t' a site visit with Rob Wilkerson of the Natural Resources Department took place to'determine the limits of:the natural area .to the East of the site. It was determined at that time that the natural area limits would be somewhere ' between the high water. . mark•of the pond and the existing tree line. We have show both of these on the landscape plan and labeled the distances from the improvements (the driveway and buildings) to the natural area. From the actual development, we are a minimum of 100-feet from driveway to an area between.the high water mark and the existing trees and '140 feet to the nearest, building. This buffer area has been planted, with native grasses; trees and shrubs with species as recommended by'.the Natural Resources Department. This natural area buffer zone will require some disturbance during construction because as the site and landscape plans show, a detention pond and emergency vehicle. : - turnaround are, required on this portion of the .site. Based upon surrounding site conditions (existing development in the area) Rob did not believe this to be a concern if the disturbed area in, . the buffer zone was reseeded and planted after construction with native grasses, trees and shrubs. 5. Current Planning Department b) Please remove the utilitytitle plan `approva1 block... -This title block has been removed from the landscape plan. d) Is there any site lighting? -A note has been added to the plan which states the all site lighting shall be located on the buildings. . Please number sheets.. ; -The Landscape Plan is Sheet 2 of 3 and has been'labefed. g) , Please provide, info on fence.. -.The fence design and material is shown on the building elevations: 'h) Please show a detail of the trash collection area.:. the trash collection areas will be fenced with'the same fence design as the buildings and additional screening has been added to both trash collection areas. i) Please see the attached redlined plans for additional comments. - -The plans have been revised based upon the rediined print as follows: , - title block is removed -sheet has been numbered the turf mixes have been revised - Ponderosa pine have been changed,to Austrian pine`and Pinion ; -' A site visit was conducted with Natural Resources to evaluate the buffer, zone. - Additional` screening has been added to the trash collection areas. Fencing has been labeled and a'detail is shown on the building elevations: , - the pedestrian crossing has been added to the plan. - the normal water surface elevation has been added to the plan. -6. Stormwater Utility 2) The landscape plan- shows trees. within the" regional drainage 'channel: These .trees should be removed from the new drainage.easement for the channel.. - The,trees have be relocated so -that they are not within the drainage easement. Hopefully this !addresses all 'of Staff's comments related to the Landscape Plan. I have also enclosed the following -revised prints for your review as well as the staff s original "Red -Lined'? Landscape Plan:: - Eight (8) copies of the Landscape Plan Should you have any questions or require additional information, please give me a call. 1p� - - - rNIc REST r July, 3, 1998 Ms. Leanne Harter, City Planner City of. Fort Collins Current Planning Department 281 North College Avenue P.O: Box 580 Fort. Collins, Colorado 80522-0580 RE: Lots 1-2, Block'5,-Replat of Evergreen Park Landscape Plan Resubmittal Dear Leanne: Based upon the Staff comments in your letter of February 5; 1998, please note the following revisions have been . made to the, Landscape Plan: A. Zoning Department Comments" a) Please include some foundation shrubbery on the north side..: additional plantings and a shrub bed have been, added to the plan on the north side of the, building.; b) regarding the `fenced storage" area at the south sideofLot,2.... full screening is required: The plan has been revised to show landscape screening with trees -and shrubs on the south. property line and the building elevations show the fence detail as -a "solid 6' high fence which also, providesadditional screening from the storage areas. 2. Engineering a)' Detach and widen sidewalk to... ; -•The sidewalk issues have been addressed by Shear Engineering and the revised plan shows the ., current sidewalk configurations. 3 Advanced Planning a)' Alternate to ponderosa pine... " - All ponderosa pine have been deleted from the plan and Austrian pine and Pinion have been added. . 4:. Natural -Resources a) Show the high water line for the regional pond - The high water line (the 100 year'flood limits) and the normal water surface elevation as well a& • , the existing tree line Have been show on the landscape plan. b) 'Show the limits of development line on the 'site and •landscape plans. - - The limits of development has been shown on the landscape plan. c) Are, there any existing trees that will be impacted by the proposed development? - No existing trees will be impacted by the proposed development. d) Will an access easement to the pond be required? - An access easement will be required and is shown on the Landscape Plan. e) The. buffer between the development and regional pond will need to include native trees and shrubs. P1atHHi"g fr Desi. LLC 4225 Westshore Way FoFt Collins, CO.80525 (970) 226-1655 .- (970) 226.1635 fax July 6, 1998 Page 2 Project No: 1466-14-96 Engineering department. Personnel from the Engineering department indicated to us that the limits of the road patch would extend along the entire frontage of both lots if the services were placed as you have redlined. We have placed the services in the drive to minimize the amount of road patching that is required. Detail Sheet * A cleanout detail for traffic area has been provided. * A Sewer Joint Encasement detail has been provided. This concludes our response to your review comments concerning the final utility plans for Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park. If you have further questions or comments, or if you require additional information, feel free to contact us at 226-5334. Sincerely, La P. Ketcham, P.E. Shear Engineering Corporation LPK / 1pk cc: Dave Phillips; Premier Custom Homes Leanne Harter; City of Fort Collins Planning Ward Stanford, City of Fort Collins Engineering Tom Dugan; Pinecrest Planning and Design July 6, 1998 Project No: 1466-14-96 Roger Buffington City of Fort Collins Water and Wastewater Utility 700 Wood Street Ft. Collins, Colorado 80521 Re: Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park; Ft. Collins, Colorado Dear Roger, This letter serves as the response to your review comments concerning the final utility plans for Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park. We have addressed the utility plan review comments on the attached redlines. Plan Redlines Master Improvements Plan * The water and fire services for Lot I have been revised so that the thrust block on the 4" fire service does not interfere with the water service. * The sewer services are no longer connected to waterline. This has been done on all appropriate sheets. * Stationing has been provided for the sewer services. * A lowering detail has been provided on the master utility Plan for the fire and water services. * Construction note No. 4, which refers to the verification of the horizontal and vertical location of the sanitary sewer crossing by the 4" fire line has not been revised. We feel the plans and the new lowering detail provided, adequately prepare the contractor for the crossings. To pothole the utilities at this time is an unwarranted step, the specific information to be gained will simply refine the elevations of the lowering. The resulting construction activities, traffic control, pavement patch, etc. will inconvenience the people traveling through the area. We request not to be required to pothole the utilities prior to construction. * The sewer line will be encased in concrete where it crosses over the water and fire services. A Sewer Joint Encasement detail has been added to the detail sheet. * We are not relocating the sewer services out of the drive. Easements will be provided for these services. A copy of the easement exhibit and dedication language is attached for your convenience The sewer services were located in the drive after discussions with the 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226.5334 FAX (970) 282-031 1 0RRTrop goor June 18, 1998 Basil Hamdan City of Fort Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80522 Re: Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park; Fort Collins, Colorado Dear Basil, Representing Bayberry Development, I have reviewed the utility plans for the above referenced project which were prepared by Shear Engineering Corporation. The plans propose a storm sewer outfall requiring construction on the property just east of this project. This property is owned by Bayberry Development. The Evergreen West regional detention pond is located on this property. The pond is a part of the Amended Greenbriar-Evergreen Basin Master Drainage Plan; Lidstone & Anderson, Inc.; Project No COTST05.4; dated September 6, 1994. After discussions with you, I understand that you have talked to Lidstone and Anderson and have established that there will be insignificant increase in the regional detention pond water level due to contribution from this project. I therefore approve the construction of the storm sewer outfall according to the plans by Shear Engineering. There is currently a drainage easement defined for the pond. No additional easements are required. Mr. Shear has indicated that we will be contacted during installation of the storm sewer so we may have the opportunity to view and provide input concerning the final look and treatment of the finished product. If you have any questions, please call at 493-4105. Sincerely, Ed Zdenek, Partner; Bayberry Development cc: Shear Engineering Corporation Premier Custom Builders July 6, 1998 Page 2 Project No: 1466-14-96 7. A floodplain exhibit is now included with the report and the floodplain is delineated on the Drainage and Erosion Control Plan. A portion of the site is situated in the floodplain. The developer will apply for a floodplain use permit. 8. The release rate from the detention pond has been reduced to compensate for the undetained runoff from the western portion of the site. 9. Peak flows have been calculated for all the design points. Report Redlines * A table summarizing the areas and runoff coefficients on site sub -basins is now included in the report. * A copy of the Coachlight Plaza P.U.D. Plat which shows the 38' easement on the north side of the channel is included for your convenience. * The release rate from the detention pond has been clarified in the report.. * We have provided haybales in the regraded channel. * Other erosion control measures are now called out on the plans. * The erosion control calculations are provided along with an updated construction sequence. There is no need to discuss the calculations in the body of the report. _ Plan Redlines Plat * Easements will be provided by separate document. Grading Plan * Additional spot elevations are now provided. * Finished Floor Elevations are now provided. Drainage and Erosion Control Plan * Additional peak flows have been calculated and summarized. * The 100-year floodplain is delineated. * The erosion control construction sequence is now added to the plan. July 6, 1998 Project No: 1466-14-96 Basil Hamdan City of Ft. Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80524 Re: Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park-, Ft. Collins, Colorado Dear Basil, This letter serves as the,response to your review comments concerning the final utility plans for Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park. We have addressed the written comments and the redlines from Matt Fater dated February 3, 1998 as follows; Written Comments An additional 9 feet of drainage easement has been added along the north property line of Lot 1 in order that the channel be located entirely within an easement. 2. All trees to be planted along the north side of Lot 1 will be planted above the estimated high-water mark for the 100-year design flow of 80 cfs. Refer to sheet 5 of the plan set for the estimated high water elevations. Linework has been added to the Landscape Plan to show the 100-year water surface elevation based on the amended Greenbriar-Evergreen Basin Master Drainage Plan by Lidstone and Anderson. The information is provided to ensure no new landscaping is placed in the area of the channel or the easement 3. Basin delineations have been clarified. The Master Plan basin delineation is now shown on the Grading Plan. The on site sub -basins are delineated on the Drainage and Erosion Control Plan. This was done so that the Master Plan basins are not confused with the on site sub -basins. 4. The owner of the Evergreen West Regional Pond is Bayberry Development. They have been contacted concerning the storm sewer outfall. A draft of a letter has been sent to them for their review and approval. You may remember that we did this for lots 5 and 6 Block 5, Replat (No. 1) of Evergreen Park. A copy of this letter is attached for your convenience. 5. A profile of the outfall from the detention pond to the Evergreen West Pond is now included in the plan set on sheet 5. 6. A revised erosion control sequence is now included on the Drainage and Erosion Control Plan. 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1 w �, \9� N90'00'00"E 270.00' — N 4• gym sIER. N d' STA: 0+69 � _ 29.73' _If �4•vDIP FlRE LJNFF 10 �� ; I � ; 11 110 I ! w o . i o I I I{ i ! 1 `n Nic 0. .r , . :.Id • • Q♦ 6. WALE( f 13 e.. ,. d. _ • � . _. ..,. : 7. .. BIKE °'-TIT $ RACK �:_. 30'(TYP) TYP. N W 40' N ��7 t 2 3 4 5 UNIT UNIT i i UNIT UNIT UNIT I �I I W � U j � TYP. g { �„ 40' (TYP. ALL UNITS) FENCED STORAGE N 1.8 STOP R1-1 s I - — - — �— — — — —o-- W `��� N90'00'00"E 270_00' i 5.50' ! DO NOT ENTER R5-1 I � WIC �I i RIGHT TURN EXHIBIT R : 21' Pm SCALE 1": 20' e July 6, 1998 Page 3 Project No: 1466-14-96 h) The trash collection areas will be fenced with the same fence design as the buildings and additional screening has been.added to both trash collection areas. i) The pedestrian crossing near the west side of the buildings has been striped as indicated on the redline set. j) The signature block for the Planning and Zoning Board on the Project Development Plan has been revised as we discussed on the phone. The Attorney's Certification has not been added as indicated in a message from Sheri Wamhoff in Engineering. As we understand, the Attorney's Certification is not typical to a Project Development Plan. k) The requested information has been provided on the Project Development Plan. Please refer to General Note numbers 1 and 2 for discussion of planned uses and parking requirement calculations. The maximum allowable parking has been exceeded by approximately 5%. l) The various redlines have been addressed as requested. This concludes our response to your review comments concerning the final utility plans for Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park If you have further questions or comments, or if you require additional information, feel free to contact us at 226-5334. Sincerely, Lar P. Ketcham, P.E. Shear Engineering Corporation LPK / 1pk cc: Dave Phillips; Premier Custom Homes Tom Dugan; Pinecrest Planning and Design e July 6, 1998 Page 2 Project No: 1466-14-96 c) A detail of passenger vehicle (21' turning radius) is attached to this response letter. The gates have been widened to 16' width. It is not anticipated that a significant amount of vehicle parking inside the fenced enclosure or the building will take place. It is anticipated the fenced area will be frequently be used for storage of materials and supplies, and the garage door will simply facilitate the moving of materials inside the building. 4. Advanced Planning Department Comments: a) The Landscape Plan has been revised to replace the Ponderosa Pines. 5. Natural Resources Department Comments: a) The 100-yr water surface line is shown in both the landscaping plan and the Site Cross - Sections. The reference elevations are listed in the Drainage and Erosion Control Plan. b) The Building Envelope and the Limits of Development Line have been added to the Project Development Plan and the Landscape Plan. A field meeting took place 6\26\98, with Tom Dugan of Pinecrest Planning and design and Rob Wilkinson of the Natural Resources Department. c) Existing trees are shown on the Landscaping Plan. No existing trees will be impacted. d) The proposed detention pond is within a new drainage, access, and utility easement. The outfall will require permission of the Regional Detention Pond owner. A letter has been written to the owner of the pond, a copy is attached for your convenience. e) A buffer is provided near the buildings to screen the development for the surrounding area. In order to improve maintenance of the ponds, and thus ensure the ponds function as designed; planting trees near the ponds has been kept to a minimum. The Storm Water Department prefers trees to be out of ponds and drainage channels. Approximately 110' is provided from the back of curb on the access drive to the edge of existing trees surrounding the regional pond. Grid matrix paving blocks are proposed to minimize the appearance of development in this 110' buffer to the existing trees. 6. Current Planning Department Comments: a) Elevation views of the buildings have been provided with this submittal. b) The Utility Approval blocks have been removed from the Project Development Plan and the Landscaping Plan. c) The General Notes have been revised as requested. d) The site lighting will be attached to the buildings, and it will be properly shielded to minimize offsite glare. See General Note number 6 on the Project Development Plan. e) The cross -sections on Sheet 5 has been modified to provide the requested information f) The sheets in the submittal set have been numbered, except the various reference sheets which remain unnumbered. g) The fence will be constructed of 6' vinyl fencing as noted in the elevation views of the buildings. sr _ July 6, 1998 Project No: 1466-14-96 Leanne A. Harter City of Fort Collins Community Planning and Environmental Services P.O. Box 580 Ft. Collins, Colorado 80522 Re: Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park; Ft. Collins, Colorado Dear Leanne, This letter serves as the response to your review comments concerning the final utility plans for Lots 1 & 2, Block 5, Replat (No. 1) of Evergreen Park. We have addressed the utility plan review comments as follows; Zoning Department Comments: a) Foundation shrubbery has been added on the north side of the building on lot 1. b) Full screening of the fenced storage area will be provided by using 6' vinyl fencing. Refer to the building elevations for a graphic representation. c) The building envelope line has been added to the Project Development Plan and the Landscape Plan. The distance from the buildings to the property lines has been labeled on the Project Development Plan. 2. Engineering Department Comments: a) Addressed in separate letter. 3. Traffic Operations Department Comments: a) We have provided a turn around with a 40' radius at the rear of lot 2 for the Poudre Fire Authority. In an attempt to respond to both the Poudre Fire Authority's need to have a firm/stable driving surface, and the Natural Resource Department's requirement to minimize development in a buffer zone around the regional pond, we are proposing to use a grid matrix paving block which will allow grass to grow up within the turn around. The grass will blend in with the pond grass and landscaping. A.detail has been added to the Grading Sheet. The turn around is located within a proposed Drainage, Access and Utility Easement. This easement will be dedicated by separate document. A copy of the easement dedication language and an exhibit are attached for your convenience. The turn around provides the necessary coverage with 150' maximum distance (fire hose length) from the possible fire truck locations. b) The building on lot 2 will have overhead garage doors on the rear of the buildings. 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1 TO LETTER OF TRANSMITTAL Leanne A. Harter City of Fort Collins Planning Department RE: Lot 1 & 2 Block 5 Replat No 1) of Evergreen Park Project No. 1466-14-96 WE ARE SENDING YOU: _ Shop drawings _ Prints X Plans _ Copy of letter _ Change order _ DATE NO. _ Samples SHEAR ENGINEERING CORPORATION _ Specifications 7/6/98 4 Bluelines of Utility Plans 7/6/98 4 Redlines of Utility Plans 7/6/98 1 Redlined Drainage Report 7/6/98 2 Revised Final Drainage Report 7/6/98 1 Response Letter to Planning 7/6/98 1 Response Letter to Basil Hamdan in Stormwater 7/6/98 1 Response Letter to Roger Buffington in Water 7/6/98 1 Response Letter to Ward Stanford in Engineering 7/6/98 8 Response Letter for Landscaping (various depts.) 7/6/98 8 Landscape Plans 7/6/98 8 Project Development Plans THESE ARE TRANSMITTED as checked below: For approval _ Approved as submitted X For your use _ Approved as noted _ As requested _ Returned for corrections X For review and comment _ Resubmitcopies for approval _ Submit copies for distribution _ Return corrected prints _ FOR BIDS DUE 19 _ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO Premier Custom Builders SIGNED: Mark Obelschmidt 7/6/98 Trans -ever 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311