Loading...
HomeMy WebLinkAboutEVERGREEN PARK REPLAT (NO. 1), BLOCK 5, LOTS 1 & 2 - PDP/FDP - 24-96A - CORRESPONDENCE - (6)If you have any questions regarding these comments, please do not hesitate to call me at 221-6750. Best egards, Leanne A. Harter xc: Mark McCullum Stormwater Utility Ron Gonzales/Poudre Fire Authority file/Project Planner Commur Planning and Environmental c --vices Current Planning City of Fort Collins Brian Shear Shear Engineering Corporation 4836 South College Avenue, Suite 12 Fort Collins, Colorado 80525 RE: Lots 1-2, Block 5, Replat of Evergreen Park Dear Brian: August 11, 1998 Representatives from the Engineering Department, Poudre Fire Authority and Current Planning Department met last Friday to discuss the above -referenced project. There are substantial concerns related to fire access through the site, and the comments listed below reflect necessary changes to comply with Code requirements. In addition, there are comments related to off -site grading and defining the LOD line that must be addressed with the submittal of revisions. 1. A turn -around for fire vehicles will not be permitted in the detention area as proposed on the plans. Tum-arounds must be placed in a location wherein unobstructed access is allowed at all times, and the proposed location shown on the plans does not guarantee this type of access may be maintained. 2. The fire access lane on the south of the building on Lot 2 must be a minimum width of 20' and signed as a fire lane with no parking allowed. If these requirements cannot be met, the building must be fire sprinklered. 3. The curb return for this access road must be clearly signed as one-way. 4. A 13'6" clearance must be maintained along the south of the fire lane. This clearance must remain unobstructed, without the slope as shown on the plans. With the submittal of revisions, please submit a cross section of the south property line of Lot 2 that demonstrates the clearance for fire emergency vehicles and location of landscaping elements. 5. With the submittal of revisions, please provide a letter of intent from adjoining property owners wherein off -site grading will occur. 6. The Limits of Development line and 100' buffer must be shown on all plans, including the utility plans. 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020