HomeMy WebLinkAboutEVERGREEN PARK REPLAT (NO. 1), BLOCK 5, LOTS 1 & 2 - PDP/FDP - 24-96A - CORRESPONDENCE - CITY STAFFO
GROUP
ARCHITECTURE
November 23, 1998
Basil Hamdan
City of Fort Collins Stormwater Utility
P.O. Box 580
Ft. Collins, Colorado 80522
Re: Lots 1 & 2, Block, 5, Replat (No. 1) of Evergreen Park; Fort Collins, Colorado
Dear Basil,
Representing Bayberry Development, I have reviewed the utility plans for the above
referenced project which were prepared by Shear Engineering Corporation. The
plans propose a storm sewer outfall requiring construction on the property just east
of this project. This property is owned by Bayberry Development. The evergreen
West regional detention pond is located on this property . The pond is a part of the
Amended Greenbriar-Evergreen Basin Master Drainage Plan; Lidstone &
Anderson, Inc.; Project No COTST05.4; dated September 6, 1994.
After discussions with you, I understand that you have talked to Lidstone and
Anderson and have established that there will be insignificant increase- in the
regional detention pond water level due to contribution from this project.
therefore approve the construction of the storm sewer outfall according to the plans
by Shear Engineering. There is currently a drainage easement defined for the
pond. No additional easements are required. Mr. Shear has indicated that we will
be contacted during installation of the storm sewer so we may have the opportunity
to view and provide input concerning .the final look and treatment of the finished
product.
If you I ave-ary�questions, please call at 493-4105.
S
d Zdene , Partner; Bayberry Development
cc: Shear Engineering
2120 South College
Fort Collins, CO 80525
970.493-2393