Loading...
HomeMy WebLinkAboutEVERGREEN PARK REPLAT (NO. 1), BLOCK 5, LOTS 1 & 2 - PDP/FDP - 24-96A - SUBMITTAL DOCUMENTS - ROUND 4 - ROUTING SHEETProject: 94, Planner: 4l),-7e 114l Traffic Operations: Engineer: 1%p1,;e cC4/ice Date: -203 9� Items Requested site nd Plat Utility Drainage Rpt Other Items Required Engineering Redlined Items Being Returned Site land Plat Utility Drainage Rpt Other Items Being Returned stormwater Water/Wastewate iralic Operations Trans. Planning Transfort Natural Resources Park Planning Totals of Other: Note: All redlined items should be returned with the resubmittal/ revisions.