HomeMy WebLinkAboutEVERGREEN PARK REPLAT (NO. 1), BLOCK 5, LOTS 1 & 2 - PDP/FDP - 24-96A - SUBMITTAL DOCUMENTS - ROUND 4 - ROUTING SHEETProject: 94,
Planner: 4l),-7e 114l Traffic Operations:
Engineer: 1%p1,;e cC4/ice
Date: -203 9�
Items Requested
site nd Plat Utility Drainage Rpt Other Items Required
Engineering
Redlined Items Being Returned
Site land Plat Utility Drainage Rpt Other Items Being Returned
stormwater
Water/Wastewate
iralic Operations
Trans. Planning
Transfort
Natural Resources
Park Planning
Totals
of
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.