Loading...
HomeMy WebLinkAboutATLAS ROOFING PUD - PRELIMINARY - 32-96 - SUBMITTAL DOCUMENTS - ROUND 2 -PROJECT COMMENT SHEET City of Fort Collins Current DATE: February 24, 1997 DEPARTMENT: W&WW PROJECT: #37-96 Atlas Roofing PUD - Preliminary PLANNER: Mike Ludwig ❑ No Problems ® Problems or Concerns (see below or attached) *Provide required landscape separations. •Provide separate water and sewer services for each building. f •Curb stops must be located in utility easements. •Indicate sizes of services, meters and curbstops . •Provide typical water and sewer details. •See landscape and utility plans for more comments. Date: 3I Signature: PLEASE HAVE APPLICANT RESUBMIT THE FOLLOWING CHECKED ITEMS. ❑ 'PLAT ❑ SITE El LANDSCAPE ® UTILITY PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: February 6, 1997 DEPT: PROJECT: REVISIONS #32-96 Atlas Roofing - Preliminary PLANNER: Mike Ludwig All comments must be received by: II j �(�� I, wit( K)Ccg 4 S�� �V �1�qcl'l 'I la`h. �`' Date: Signature CHECK IF YOU WISH TO RECEIVE ❑ PLAT COPIES OF REVISIONS ❑ SITE ❑ LANDSCAPE ❑ UTILITY PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: February 6, 1997 DEPT: Stormwater Utility PROJECT: REVISIONS #32-96 Atlas Roofing - Preliminary PLANNER: Mike Ludwig All comments must be received by: The following comments should be addressed at final submittal. 1. Please provide the necessary erosion control protection for this site. An erosion control escrow should be calculated with a required minimum amount of $1000. A construction sequence schedule and required erosion control notes should also be provided with the erosion control plans. RESPONSE: 2. Please show the easement for the irrigation ditch along the south property boundary. Is the ditch still operating? Please contact the owner of the irrigation ditch regarding the proposed development. Signature from the owner of the ditch may be required. RESPONSE: 3. Please delineate all relevant on and off -site sub -basins on the drainage plans, and show the respective points of concentration. RESPONSE: Date: 5 — ;7 - ,q7 Signature CHECK IF YOU WISH TO RECEIVE ❑ PLAT Ce .. - �/e 4, COPIES OF REVISIONS ❑ SITE 1)1,Kc ❑ LANDSCAPE ❑ , UTILITY 7:57 PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: February 6, 1997 DEPT: Engineering PROJECT: REVISIONS #32-96 Atlas Roofing - Preliminary PLANNER: Mike Ludwig All comments must be received by: Atlas Roofing Pud - Preliminary review March 3, 1997 Plat - 1. The additional Row (A half Row of 57.5 feet to meet current standards) will not be required at this time. Any future development on this site will require the dedication of the Row to current standards. Although we are not requiring it at this time you are welcome to dedicate it if you like. 2. Need to show the ditch easement and any other easements that may be needed. The ditch company will need to sign off on the plat. Utility Plans - 3. The site plan shows it but the utility plan does not show where the curb and gutter is to be replaced and new walk put in. This needs to be indicated on the plans. 4. Indicate the driveway width and it's location in relation to the property line. 5. Label the sidewalk width from the street up to the building. Signatur Date: 3 i 2 e_, CHECK IF. YOU WISH TO RECEIVE PLAT COPIES OF REVISIONS SITE ❑ LANDSCAPE UTILITY