HomeMy WebLinkAboutATLAS ROOFING PUD - PRELIMINARY - 32-96 - CORRESPONDENCE - REVISIONSM Michael Ludwig February 5, 1997 Page 3 I. Done. M. Phase Two considerations have been removed from the submittal. n. Done. o. Done. P. Done. q. Done. r. Done. S. Done. t. Done. U. Done. V. Done. W. Done. This note refers to work accomplished only on the site and will not require off -site easements. X. Done. Requirements for an on -site landscape irrigation system have been added to the project. Y. Phase two elements have been removed from the submittal. Z. Dimensions have been added to the elevations as well as additional notes calling out materials. Colors will be addressed with the submittal of colored elevations later aa. Done. bb. Done. cc. A Variance to Point Chart E has been submitted for consideration. dd. See cc. Above. ee. See cc. Above. ff. Done. Please let me know if you require any further information. I believe that we have complied with all of the City comments as they have been discussed with Staff Members. Au Principal CC Ed Schneider Michael Ludwig February 5, 1997 Page two h. Done i. Done as discussed. 5. Comments from the Building Inspection Department are acknowledged and wil be reflected in the improvements made to the property. 6. Comments recieved from Advance Planning Department have been incorporated into the plans as we have discussed. 7. Water and Wastewater Utility. a. Done. b. Done. C. Done. d. Done. 8. Comments form the Mapping Department have been incorporated. A Platt has been prepared and submitted with this re -submittal package. The increased ROW along Taft Hill Road has been shown on the Platt. This additional ROW reflects a loss of more than one fourth of the area of the project. We are not sure that the owner is not entitled to compensation for this additional dedication. 9. Comments from Engineering Department have been incorporated into the engineering documents submitted with this package as appropriate. 10, Comments form Stormwater Utility have been incorporated into the engineering documents submitted with this package as appropriate. 11, Current Planning Department. a. Done. b. Done. C. Done. d. Done. e. Done. f. Done. g. Done. h. Done. i. Done. j. Done. k. Done. P. O. Box 271217 Fort Collins, Colamdo 50527-1217 February 5, 1997 Mr. Michael Ludwig, Project Planner Current Planning Community Planning and Environmental Services City of Fort Collins P. O. Box 580 Fort Collins, Colorado 80522-0580 RE: Atlas Roofing PUD; Response to Staff Comments for. Dear Mike; This letter is written in response to staff review comments of the Atlas Roofing PUD, Preliminary Submittal expressed in your letter dated December 20. 1996 to me. To make your review easier I have used the same format as your letter to me in preparing this response. 1. Development charges from Light and Power Utility are acknowledged. 2. Comments from Public Service Company are acknowledged and have been incorporated into the plans as appropriate. 3. Natural Resources Department. a. Discussions with Susie Gordon of Natural Resources and Rich Grossman of Larimer County Health indicate that no comment will be required on the plan as ther is no intention to restrict excavation on the property. Comments from City and County were intended to be precautionary and are acknowledged. b. Note # 5 has been modified as we have discussed. 4. Zoning Department. a. Done. b. Done. C. Done. d. Agreed e. Acknowledged f. Done. g. Done. II 0 Mr. Michael Ludwig City of Fort Collins Planning Department PO Box 580 Fort Collins, CO 80525 Re: Atlas Roofing P. U.D. Project No. 10-868-000 Dear Mike: February 5, 1997 We have reviewed the City's comments and changes concerning the Atlas Roofing P.U.D. We have made the required changes and added a preliminary plat document to our original submittal package. Please note the stormwater utility comments request an easement be shown for the existing irrigation lateral across this parcel. Our title search describes this only as an easement for irrigation purposes, with no specific description. Please direct us as to how the city would like this reflected on our plans. We hope you will find everything in order. If you or any of the other review departments have any questions about this design, please don't hesitate to call. Sincerely, TST, INC. CONSULTING ENGINEERS Donald L. Patchett DLP/nr cc: Ed Schnieder TST, INC. Consulting Engineers 748 Whalers Way — Building D Fort Collins, CO 90525 (970)226-0557 Metro Denver (303) 595-9103 Fax (970) 226-0204 102 Inverness Terrace East Suite 105 Englewood, CO 80112 (303) 792-0557 Fax (303) 792-9489