I. Done.
M. Phase Two considerations have been removed from the submittal.
n. Done.
o. Done.
P. Done.
q. Done.
r. Done.
S. Done.
t. Done.
U. Done.
V. Done.
W. Done. This note refers to work accomplished only on the site and will not require off -site
easements.
X. Done. Requirements for an on -site landscape irrigation system have been added to the project.
Y. Phase two elements have been removed from the submittal.
Z. Dimensions have been added to the elevations as well as additional notes calling out materials.
Colors will be addressed with the submittal of colored elevations later
aa. Done.
bb. Done.
cc. A Variance to Point Chart E has been submitted for consideration.
dd. See cc. Above.
ee. See cc. Above.
ff. Done.
Please let me know if you require any further information. I believe that we have complied with all of the City
comments as they have been discussed with Staff Members.
Au
Principal
CC Ed Schneider
Michael Ludwig
February 5, 1997
Page two
h. Done
i. Done as discussed.
5. Comments from the Building Inspection Department are acknowledged and wil be reflected in the
improvements made to the property.
6. Comments recieved from Advance Planning Department have been incorporated into the plans as we
have discussed.
7. Water and Wastewater Utility.
a. Done.
b. Done.
C. Done.
d. Done.
8. Comments form the Mapping Department have been incorporated. A Platt has been prepared and
submitted with this re -submittal package. The increased ROW along Taft Hill Road has been shown on
the Platt. This additional ROW reflects a loss of more than one fourth of the area of the project. We are
not sure that the owner is not entitled to compensation for this additional dedication.
9. Comments from Engineering Department have been incorporated into the engineering documents
submitted with this package as appropriate.
10, Comments form Stormwater Utility have been incorporated into the engineering documents submitted
with this package as appropriate.
11, Current Planning Department.
a. Done.
b. Done.
C. Done.
d. Done.
e. Done.
f. Done.
g. Done.
h. Done.
i. Done.
j. Done.
k. Done.
P. O. Box 271217
Fort Collins, Colamdo 50527-1217
February 5, 1997
Mr. Michael Ludwig, Project Planner
Current Planning
Community Planning and Environmental Services
City of Fort Collins
P. O. Box 580
Fort Collins, Colorado 80522-0580
RE: Atlas Roofing PUD; Response to Staff Comments for.
Dear Mike;
This letter is written in response to staff review comments of the Atlas Roofing PUD, Preliminary Submittal
expressed in your letter dated December 20. 1996 to me. To make your review easier I have used the same
format as your letter to me in preparing this response.
1. Development charges from Light and Power Utility are acknowledged.
2. Comments from Public Service Company are acknowledged and have been incorporated into the plans
as appropriate.
3. Natural Resources Department.
a. Discussions with Susie Gordon of Natural Resources and Rich Grossman of Larimer County
Health indicate that no comment will be required on the plan as ther is no intention to restrict
excavation on the property. Comments from City and County were intended to be precautionary
and are acknowledged.
b. Note # 5 has been modified as we have discussed.
4. Zoning Department.
a. Done.
b. Done.
C. Done.
d. Agreed
e. Acknowledged
f. Done.
g. Done.
II
0
Mr. Michael Ludwig
City of Fort Collins
Planning Department
PO Box 580
Fort Collins, CO 80525
Re: Atlas Roofing P. U.D.
Project No. 10-868-000
Dear Mike:
February 5, 1997
We have reviewed the City's comments and changes concerning the Atlas Roofing P.U.D. We
have made the required changes and added a preliminary plat document to our original submittal
package. Please note the stormwater utility comments request an easement be shown for the
existing irrigation lateral across this parcel. Our title search describes this only as an easement for
irrigation purposes, with no specific description. Please direct us as to how the city would like
this reflected on our plans.
We hope you will find everything in order. If you or any of the other review departments have
any questions about this design, please don't hesitate to call.
Sincerely,
TST, INC. CONSULTING ENGINEERS
Donald L. Patchett
DLP/nr
cc: Ed Schnieder
TST, INC.
Consulting Engineers
748 Whalers Way — Building D
Fort Collins, CO 90525
(970)226-0557
Metro Denver (303) 595-9103
Fax (970) 226-0204
102 Inverness Terrace East
Suite 105
Englewood, CO 80112
(303) 792-0557
Fax (303) 792-9489