Loading...
HomeMy WebLinkAboutATLAS ROOFING PUD - PRELIMINARY - 32-96 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYco MEMORANDUM LO o 00 cr ' LO TO: Bob Sutter, Architectural Horizons o CD City of Fort Collins o o CO FROM: Matt Delich _0A1VJ_Z71) U • DATE: November 25, 1996 o z L w SUBJECT: Trip generation for proposed office building for a J roofing business (File: 9681MEM1) w >- o N This memorandum documents the trip generation that is p CD expected at a proposed office building for a roofing W o contractor. The site is located south of Mulberry Street and a ►� west of Taft Hill Road in Fort Collins. City staff requested = o' a trip generation analysis. The proposal is to convert an W z existing 3600 square foot former service station to this C7 i office use. As part of this project, the owner desires to build a four vehicle garage on the site to store business N vehicles, primarily pick-up trucks, overnight. The number of employees that may come to this site on a daily basis would be eight; however,.some would leave to go to a job site. No building materials will be stored at this site. Trip Generation, 5th Edition, ITE was used to calculate the trip generation. Single tenant office building (code 715) was used in this calculation. Two variables were used to calculate the trip generation. Using the area of the building as the variable, the following daily and peak hour traffic was calculated: W r m C'- ( ��l L �J Daily - 41 trip �• ends ` i ci�_ati Ivc- Morning Peak Hour - 6 trip ends . w Co 0 Afternoon Peak Hour - 6 trip ends z0 () Z Using the number of employees as the variable, the following .I W / daily and peak hour traffic was calculated: Oz a Daily - 28 trip ends Morning Peak Hour - 4 trip ends o Afternoon Peak Hour - 4 trip ends a y It is concluded that the number of daily trip ends generated by this use will be less than 50 and the peak hour W trip ends will be.less than 10.. The impact of this traffic _ on the nearby street will be insignificant. a Q ~ 2