HomeMy WebLinkAboutATLAS ROOFING PUD - FINAL - 32-96A - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSXTt.AI;� RooF►NG PUD , FIUL #32—°I(oA
Activity A: ALL DEVELOPMENT CRITERIA
ALL CRITERIA
APPLICAELE CRITERIA C,INLY
'
C=1T_.=.ION
Is ::ie cr..enon
accitracle7
lwiu the often
be s2tisrIM7
'
If no, please exc;zin
f. = 'S
3 .
Yes INo
A1.
COMMUNI i Y-%^IIDE CRITERIA
1.1
Solar Cnen,ation
I I I
1.2
Comorehensive Plan
I I I I I
1.3
Wildlife Habitat
I 114 I I
1.=
Mineral Depcsit
I l l I I
1.5
1.c
=cclecic_lly Sensitive Areas
Lands cf Aericultural Irnoer,=nce
I reserved I I
I reSer.ed I
1.7
_)ercv Ccr=erv=ticn
I I I
1.a
Air Qualiiv
1 .0
Ware, Cuali1v
10
�Z='.vice anc w_se=_
I I I I I
1 11
\Na?nrf on eNa.i n
✓I
L12
Residential Density I
I I✓ I I
NE.IGHEGRHOOD CCIIFATIEILI 71 CRIT-RI =1
venicular. Pec_s,ran. Eike i ransocr-,ion
I I I I I
2
=uiictr.c P!=c=^ent and Orient=_ticn
1 ! I I
2.3
Natural �:'==tur=5
1 Vol
V=nicul_r Circui=ticn anc Parking
I I I I
I
...
2'
�m=ryercy .-,cocas _
I I
I✓ t 1
Pecesman Circuiaticn
I I I I
2.
�r-lt=o,ur
I I I I 1
CUIIoInO-,-rl anc Mews
I I I
2.
ng
I I✓ I 1 1
2.1C
�olarACo_sS
2.11
His,oric Rescurzas
I I✓I I I
2.12
S=tcacks
I ✓ I
2.13
L ancscace
I I I I I
2.1=
Sicns
I I I I
2.1 S
Site Lighting
2.1 e
Noise and Vibration
I I
I
I
2.17
G12re or Heat
2.18
Hazardous Materials
I I
1
A 3.
ENGINEERING CRITERIA
3.1
Utility Capacity
3.2
Design Standards
I✓I I
✓1
I
3.3
Water Hazards
I I I
3.4
Geclocic Haz_rds
I I
✓T I I
Land Development Guidance System for Planned Unit Developments
the City of P9
or: Collins, Colorado, Revised . `l 194 �
�U
SI
-61-
EAST ELEv-Exat'g. aldg.
SOUTH ELEy. - Oarage
NORTH ELEv. - Csaage
IBM
SOUTH ELEy.-Exst'g. slag. TRASH ENCL.
(North Elevation Sim.) Side Front
i
F
WEST ELEv.-Exst'g. aldq.
EAST SIDE ELEV. - 5arage
(West Side Elevation Sim)
FENCE SECTION
(Trash Encl. Sim.)
m
LEGEND of COLOR
� a
W Ji
Z'.
•�
stPsm. AI�tlN0
W 0lW4 Pr
�
4p0t�6�R0e
O LL
�dt 9.L
J
e1pH1Mpl9FM416pyiL �P �IFI
.�
1.1 u i
1@ YNY P1L��ld NYVINtl[�CIPAAI�IO®.tlt �VDW
'�i
aro.owmow.c*w.cwu.o�rol+o�<e+aurc. ne
J_
��V^.SCAPE PLAN. —_
W
LANDSCAPE SCHEDULE
SYMBOL
NAME
gl3
WANTITY
RE7MAIaCg
(50T wmu
uD1lY L T
] Mr cei
(4LDI,Y. itl.CtlRwL
.Emw,
IPINb NYReI
9 R.
3.
��t'
E,tbMi YIOC6 iC fL
IEYOrEI]
YW&04id WRRNLMI
rGRei♦[iY6 MamMnNm]
I]r1 M. G4
?
JGPYEIe RC'IWGCIVO
lNiab RG IOMb
'v: Iie. LY
a
WMYtY,LPLE
]wn C4
]
�
ldGpR Rafera3CFb1
iglLbxJWRIR
544
3]
YI!
11YIMIECeOLIP JINIPPM61
C
N
Z
GENERAL LAND9GAPE NOTES
ZONES
L,E]nauaArsxaLL
P. RRICA]sII¢,OAvmy
ARIAa
REMARKS
-g—Y_.M..—D.••G•_—L_
neuRoaeeDxsusx-SmLs.„siCewRL
m¢aNsTE,CLANIFICATtON
rr
.
.ualsLAauvaw
RcWN
esm..r
u
V
N
J I
DErEL(RER wu F!¢IwE n.er ne Lernec.Pe P..ua eaE cocwMaro wn r; PLew d osEa amaisuq so,wr ,� nasocen
w vRaMort Wor ea romiRx:novae.Im rdEmr wn raaswanE Reiµleild ao P+Miwlw�aIyoec.rE
LL
U
ELnT9 nN
ELP'IE1rro RM
J
],
4l RAVt,1erERLL dYLL.GE MlLLC1®dYZ Wl4 eeN Mef.FWL,14r6 KANCM'JE.
yl
LL
3
eu M1dM etoe. wetro rn,ewux BUD+N d ne P.eV ewa: esa rm�co wiu e r urta a Put rmLe sNarwe
LL
♦
EW'+4 9NKl GE ♦' . u (rY'E 1,6L EIXJY u.'� R65iY: fDf£ 6N41.Y4 fE'C3] M M1/3 Wn tl' S1EEL ECW" PW e.9r4LED
l'
�E
a
er..msmmu. e.ER...m
Z
e
LLL�mwm a tar.�.�YR.PC
o
u
♦.
PaE ♦Ennr eE amraean Eaa+nm cwleesrea verse[ m^'lets w+s.aw <s Ne+en d nw M1M .la ..aMrec •vsmv w
A Cm
'wT
4
rm,oVEod nc rLVLIc Ra aWar
'
LxascaeE IRRGe]IDN s»r¢l io ce rw.ne m , a=PRo o rom cou.nw Pmwe ro IssuxcE s a eu1LDnG .ER+Ir.
s
..¢• sEParwnd vwrars spe recess ao a w�.v sePoiaeE rcre naa+»i mE n♦snnram Ps*I u uurea s.wl*u+
TID
sews seR✓2n . ue LM!
3
4:. Jf]E9'A,K J,IInEs 9WL: CE LC<>rED 9m.R IC MiµLAKN CR LLGNYe ELE'dr!
fee
14]
F
1D
ALL 4MS9CLPK }JLL � M]µLW GR'.Fllf® Wn YI AIE:MCAIXE LEr1ER 6 C.E91r EECreC]L W 1�i]rQ OCM] LF 0)f 0 rK
� S
vel.WrKN 6 TE LNOILMN" YQ] MiaLLeil[ti b WKJ.iEJ d Mq RM Po'JIt 1C M wrlMCm CF a LER1.KiT O KMa'C,
o'
�
� F'
It
IL .JAL 1 uEA9 PIPeCIEp Or CG biR1C]KM YWl mE EliLrED mt 4[IPOMG wfM MnrEnIKB EaNL m i�IGlE DI9RACEO
q
. Exwr W r¢,EFI fJir OlPe'C0.11M mepum flgDgp'
LMN Zone
g NEW f2BAY
ATL4 R®®P11,11i s ::IZI
525 soitr :asr HILL ROAD
LAND u5E 5RE.LCDOLN:
AreaMuS., me.
PePkirrg
ermomo eEulY
.caeee.e I
dltnrae'r'Y aFe ./
rax erylm 5
}p}µ IyO.I !rY II,IS pb'd b LLq/
®JI �rilllg
dIYlY9 W� MII Nab Erv1 ]5 r'wl
PMCW IJpS! ]0n
Mp.IVeg.6<i el dlWln]P»Yw.
LDDe^.YE r.3pi.r len
TCTA 9 U3H N 110%
Allowed or,lce.rsb.lew...e EKlpue .wbw elv wVYl s.wy.
U"s
9Y"1B0L8 LEGEND
—E— etl1(W I E.7:—
LE3A6 DESCQIP,'ON.
r N.me. rwn rwns.9 u. en iw xYw �c ire u w,rrg wN K» a nm wdwN YII aNm wrg falwm..Ynw wwp: .
e.Ewlg n .pole: w en Iw e, ww K Iw m+m p.r.. pp.. aDp M e.n Mmm r� mm w Y.wn w.» er ww rve I/..,e M ww eewl
U., a' nt]66A]s 11gILE ll1»t 3000 fp,111rQY2 MpN i]e]C WVJ. B3PA rygr 111ENZ NaN 6b M'. UYS. r, u@Ylo, 0.
Een b5" INet b w ppw e/ E,Qlrwuf EMQrt w 6n 30D r� Y»s,. Gry er bn UIIY f<beW � Nmpn b mi cM ^Ig,4m dI W n Ycm�
m w.ybr xw.n. xoploY. P%� ro sev] wue dwry e, ISNe. h/'9 p' w m,wNm41w o<w new d�vrow p'oc^v.
-o�.
. - P•m. raw <r.<s IsorEr, . Pln /e. w G E <.nr..p,
GENERAL NOTES: ✓IOIN,I—
I ew ENkq laluq PYn w el ts» me
pYw.b. elrvWMW4wf /A rnwp�ml
]. 91[E. M b pc^V�l MM G1y of Ivl fully 51g
GW, wYw e.pclr<+nww Y g.,.p
�. cp.N«Iw�I..w».up �o e.;NNw Yu o/Im
e yl grtb. e/ E.Viv YIY p/ Nb p /E iu0w
!AD /ew pr w ems. •wdeN w++T �gwy
4�b'b^renwwr+»�a
5 Cv.wnlw WVUY.III mnwwawrcww•
r n w I pDIIC ro i�rb p»roYu
nIVUY» �wn. wll w.b.p wnYr
i. Ewlg wM ew n tiv,w n tert ul. Me YI v
Pop4.w OI muUg wb aY b w •i+i NII w n-
pYwp Nr an. g.PV. /.eY n evoyw.M
Clty Olsvb.
1. Ylpw/hp e6arp row.prbw�wlFq+b+n
Y m m rwq a �.++w sera r�
e All ireN WEwll, me b lMYKbliW We
IYVNYM I MIIbwMv<OpnbY MN
w MN OIMa ysme NYNg w gyrew &M
Psebg.
4 pW Mdr wllbpv.u.Y�WwdbvvM,na
wll m FVlse WN Iblr4n,Vle
•
VICINITY MAP
#32-96A Atlas Roofing PUD "
Final (LDGS)
1"= 600'
IN
i,n
oil
■A0
0
rmmmm
in
•
Atlas Roofing PUD, Final, #32-96A
August 7, 1997 P&Z Meeting
Page 6
5. Transportation:
The existing transportation system is capable of handling the proposed vehicular traffic
volumes. All surrounding intersections will continue to operate at acceptable levels of
service.
FINDINGS OF FACT/CONCLUSION:
The Atlas Roofing PUD, Final, #32-96A is in substantial compliance with the Atlas
Roofing PUD, Preliminary #32-96 that was approved with two conditions and a
variance on February 24, 1997.
2. The Atlas Roofing PUD, Final, #32-96A satisfies the Planning and Zoning Board's
first condition of Preliminary PUD approval by providing additional landscaping on
the east side of the proposed metal garage building. Furthermore, the applicant is
providing additional landscaping on the north side of the proposed metal garage
building.
3. The Atlas Roofing PUD, Final, #32-96A satisfies the Planning and Zoning Board's
second condition of Preliminary PUD approval by providing a new 6 foot high wood
framed fence (rather than a standard picket fence) on the east side of the new
garage building from the north property line to the driveway; and from the south side
of the existing building to the south property line.
4. A variance to Criteria 2 of the Business Service Uses Point Chart on February 24,
1997 on the basis that granting of the variance would neither be detrimental to the
public good nor impair the intent and purposes of this section; and that the plan
submitted is equal to or better than a plan which achieves 50% of the maximum
applicable points.
5. The Atlas Roofing PUD, Final, #32-96A satisfies all applicable All -Development
Criteria of the L.D.G.S.
6. The Atlas Roofing PUD, Final, #32-96A complies with the Interim Design Standards
and Guidelines for All Commercial Development.
7. The Atlas Roofing PUD, Final, #32-96A is compatible with surrounding land uses.
RECOMMENDATION:
Staff recommends approval of the Atlas Roofing PUD, Final, #32-96A.
Atlas Roofing PUD, Final, #32-96A
August 7, 1997 P&Z Meeting
Page 5
Examples of compliance with these Interim Standards and Guidelines are the provision
of a direct pedestrian connection to the office showroom from the public sidewalk that does
not cross any parking or drives.
This request for Final PUD is in compliance with the Interim Standards and Guidelines for
All Commercial Development.
3. Neighborhood Compatibility:
The property is the former site of a gas station and has been vacant for nearly 10 years.
Surrounding land uses include existing commercial uses to the north (car -wash and gas
station); an existing mobile home park to the west (Skyline Mobile Home Park); existing
single-family residential to the south; and an arterial street to the east (Taft Hill Road). The
applicant's request to renovate the existing 360 square foot building for an office/showroom
and to construct a 960 square foot garage for vehicle storage is considered a very low
intensity land use. Roofing materials are delivered directly from the commercial supplier
to the job site. Therefore, material storage on this site will be minimal and no outside
storage will be visible from surrounding properties or the public right-of-way. This request
is an appropriate re -use of the site.
By approving the Preliminary PUD, the Planning and Zoning Board determined that the
request was compatible with the surrounding neighborhood. This Final PUD is in
substantial compliance with the approved Preliminary PUD. Therefore, Staff recommends
that this request for Final PUD is compatible with the surrounding neighborhood.
4. Desian:
The proposed layout consists of an existing 360 square foot building (former gas station)
that will be renovated for use as a small office and showroom and a new 960 square foot
garage for vehicles. One of the two existing curb cuts on Taft Hill Road will be eliminated.
All existing paving on -site, except for the existing building's perimeter, will be removed.
New paving for a driveway and a 9 space parking lot will be constructed. Evergreen shrubs
will be planted in front of the existing building and deciduous trees will be planted along the
north, south and west property lines. Street trees will be planted along the future right-of-
way line of Taft Hill Road. An existing 6 foot high wood fence will remain along the west
and south property lines. A new 6 foot high wood framed fence (rather than a standard
picket fence) will be constructed on the east side of the new garage building from the north
property line to the driveway; and from the south side of the existing building to the south
property line.
Atlas Roofing PUD, Final, #32-96A
August 7, 1997 P&Z Meeting
Page 4
1. Additional landscaping be provided on the east side of the proposed metal
garage building.
2. A wood framed fence (rather than a standard picket fence) be provided on
the east side of the new garage building from the north property line to the
driveway; and from the south side of the existing building to the south
property line.
The applicant has added two Japanese Flowering Crab trees on the east side of the
proposed metal garage building to the Landscape Plan. In addition, the applicant proposes
a Japanese Flowering Crab tree and seven Tamarix Juniper shrubs on the north side of
the proposed metal garage building.
The applicant will provide a wood framed fence (rather than a standard picket fence) on
the east side of the new garage building from the north property line to the driveway; and
from the south side of the existing building to the south property line. A detail of the fence
is provided on the Elevation Sheet of the plan set (Sheet 3 of 3).
The two conditions of Preliminary PUD approval are satisfied.
B. Variance Granted at Preliminary PUD:
On February 24, 1997, the Planning and Zoning Board granted a variance to Criteria 2 of
the Business Service Uses Point Chart on February 24, 1997 on the basis that granting of
the variance would neither be detrimental to the public good nor impair the intent and
purposes of this section; and that the plan submitted was equal to or better than a plan
which achieved 50% of the maximum applicable points.
C. All -Development Criteria:
This Final PUD request satisfies all applicable All -Development Criteria.
D. Interim Standards and Guidelines for All Commercial Development
Any applications for commercial development (use -by -right or PUD) submitted after March
1, 1996 and prior to the adoption of the CityPlan Land Use Code are subject to the Interim
Standards and Guidelines for All Commercial Development. The purpose of these
standards and guidelines is to serve as interim requirements for commercial land
development in Fort Collins, consistent with the growing awareness of ways to make Fort
Collins more livable for all residents by the way our physical surroundings are arranged
(including such things as streets, buildings, outdoor spaces, and neighborhoods).
Atlas Roofing PUD, Final, #32-96A
August 7, 1997 P&Z Meeting
Page 3
COMMENTS
1. Background:
The surrounding zoning and land uses are as follows:
N: LMN; existing commercial (car -wash, gas station).
S: R-L; existing single-family residential.
E: LMN; arterial street (Taft Hill Road), existing single-family residential.
W: LMN; existing mobile home park (Skyline Mobile Home Park).
This property was annexed into the City as part of the West Fort Collins Annexation on
August 10, 1967, and is zoned LMN, Low Density Mixed Use Neighborhood.
The property has never been subdivided (platted). A gas station was originally constructed
in 1968. The oldest City Building Inspection's record for this property indicates a building
permit was issued in 1971 to allow a change from manual to automated service pumps.
The most recent City Building Inspection's record for this property indicates that a building
permit was issued in 1987 for the removal of underground storage tanks. The site has
remained vacant since.
On February 24, 1997, the Planning and Zoning Board approved the Atlas Roofing PUD,
Preliminary, #32-96 with two conditions and a variance by a vote of 4-1. In accordance
with Ordinance No. 161, 1996, this Final PUD application was submitted within 6 months
of Preliminary PUD approval and is therefore subject to the requirements of the Land
Development Guidance System.
2. Land Use:
This is a request for Final PUD approval for 1,320 square feet of commercial use on 0.53
acres, located at 525 South Taft Hill Road. The applicant proposes to renovate an existing
360 square foot building (formerly a gas station) for a small office and roofing sample show
room; and to construct a new 960 square foot garage for the storage of vehicles.
This Final PUD request is in substantial compliance with the Atlas Roofing PUD,
Preliminary, #32-96.
A. Conditions of Preliminary PUD Approval:
On February 24, 1997 the Planning and Zoning Board approved the Atlas Roofing PUD,
Preliminary, #32-96 with the following conditions:
Atlas Roofing PUD, Final, #32-96A
August 7, 1997 P&Z Meeting
Page 2
picket fence) on the east side of the new garage building from the north property
line to the driveway; and from the south side of the existing building to the south
property line.
was granted a variance to Criteria 2 of the Business Service Uses Point Chart on
February 24, 1997 on the basis that granting of the variance would neither be
detrimental to the public good nor impair the intent and purposes of this section; and
that the plan submitted is equal to or better than a plan which achieves 50% of the
maximum applicable points.
• satisfies all applicable All -Development Criteria of the L.D.G.S.
• complies with the Interim Design Standards and Guidelines for All Commercial
Development.
• is compatible with surrounding land uses.
ITEM NO. _ 2_
MEETING DATE $L7j97_
iiA STAFF Mike Ludwig
Citv of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Atlas Roofing PUD, Final, #32-96A.
APPLICANT: Atlas Roofing Systems
c/o Bob Sutter
Architectural Horizons
P.O. Box 271217
Fort Collins, CO 80527-1217
OWNER: Edward Schneider
Atlas Roofing Systems
3119 Longhorn Court
Fort Collins, CO 80526
PROJECT DESCRIPTION:
This is a request for Final PUD approval for 1,320 square feet of commercial use on 0.53
acres, located at 525 South Taft Hill Road. The applicant proposes to renovate an existing
360 square foot building (formerly a gas station) for a small office and roofing sample show
room; and to construct a new 960 square foot garage for the storage of vehicles. The
property is zoned LMN, Low Density Mixed Use Neighborhood.
RECOMMENDATION: Approval of the Final PUD request.
EXECUTIVE SUMMARY:
This request for Final PUD:
• is in substantial compliance with the Atlas Roofing PUD, Preliminary #32-96 that
was approved with two conditions and a variance on February 24, 1997.
• satisfies the Planning and Zoning Board's first condition of Preliminary PUD
approval by providing additional landscaping on the east side of the proposed metal
garage building. Furthermore, the applicant is providing additional landscaping on
the north side of the proposed metal garage building.
satisfies the Planning and Zoning Board's second condition of Preliminary PUD
approval by providing a new 6 foot high wood framed fence (rather than a standard
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 28i IN. CullefieAve. PO Box 580 Fort C��Ilim, � (] 80522-0580 (970) 221-6750
PLANNING DEPARTMENT