HomeMy WebLinkAboutATLAS ROOFING PUD - FINAL - 32-96A - CORRESPONDENCE -PROJECT
COMMENT SHEET
_Giy of Fort Collins
Current Plannim
DATE:
PROJECT: A-rLAS �?mF,r�L-7
PLANNER: i' i;E Lvowxtq
ENGINEER: 544SK, WAm4oFF
DEPT: Stormwater Utility
o. b .
All comments must be received by:
HNo Problems
Problems or Concerns (see below or attached)
1. A drainage report is needed for this proposed development. Please include
documentation of existing and proposed drainage going offsite. Also, request a variance
for detention requirements.
RESPONSE:
2. Please submit erosion control calculations.
RESPONSE:
3. The unit cost for reseeding used in the submitted erosion control cost estimate is
incorrect. The correct unit cost is $636 per acre for under five acres and $531 per acre for
over five acres.
Please see redlined plans for additional comments.
Date: Signature:
PLEASE SEND COPIES OF MARKED REVISION ❑ PLAT 6, MICE Ll
❑ STTE . TSr,
UTII..TTY
0 LANDSCAPE
PROJECT
City of Fort Collins COMMENT SHEET
DATE: May 14, 1997 DEPT: Water & Wastewater
PROJECT: #32-96A Atlas Roofing P.U.D.- Final (LDGS)
PLANNER: Mike Ludwig
All comments must be received no later than the staff review meeting:
Wednesday, May 21, 1997
Utilities shown on landscape plan do not correspond to those shown on utility plan.
Sizes of all existing and proposed utilities must be indicated on the plans.
—4f-a-waterservice is-to=be4nstalled in the garage, then a separatesanitary�eyxer_seryicq-wWbe---
--Required:.
Curb stops must be place in utility easements or R.O.W.'s and with in a landscaped area.
See utility and landscape plans for other comments.
Date: S 211�) -7 Signature:_
r
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
X PLAT _SITE
X UTILITY X REDLINE UTILITY
_DRAINAGE REPORT _OTHER
X LANDSCAPE
City of Fort Collins
5�
•
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: April 22, 1997 DEPT: Engineering
PROJECT: #32-96A Atlas Roofing P.U.D. - Final (LDGS)
PLANNER: Mike Ludwig
All comments must be received at the staff review meeting:
Wednesday, May 21, 1997
Site / Landscape Plan
1. The curb stops and meter pits are shown differently than they are on the utility plans.
Utility Plans
2. Sheets numbered 3, 4 and the plat (assume sheet 2) were received, but sheet 1 (cover sheet)
was not. A cover sheet with the general notes is needed.
3. Show the easements on the utility plans
4. Label the where the existing curb cut is to be replaced with curb, gutter and walk.
5. Label the chain link fence and light pole as being removed.
6. Label the trash enclosure
7. Provide curb, gutter and sidewalk detail, driveway detail, and additions to sidewalk detail.
Date:
CHECK HERE 1F YOU WM TO REMVE COPIES OF REVISIONS
. Vw _ Sk _ Drainage Rep _ Oda
� Utility — Rdtfline Utk X Iands�pe
This completes the review comments at this time. Additional comments may be
forthcoming as the various departments and reviewing agencies continue to review this
request.
As you are aware, the City is implementing a new development review process. Plan
revisions may now be submitted at any time. Planning and Zoning Board dates will
be assigned by City Staff when all issues have been addressed. Please contact me
for the number of folded revisions required for each document prior to the submittal
of plan revisions.
Please contact me at 221-6206 if you have any questions or concerns related to these
comments. I would like to schedule a meeting with you as soon as possible, if necessary,
to discuss these comments.
Sincerely,
Michael Ludwig
Project Planner
xc: Sheri Wamhoff
Stormwater Utility
file/Project Planner
•
�J The proposed symbols on the landscape schedule are very similar and are
difficult to distinguish from one another. Please revise accordingly.
Please clarify that the size caliper of the trees on the landscape schedule
are in inches. It appears that they are in feet.
100, The Tam Juniper must be 5 gallon in size, not 3 gallon.
Building Elevations
A condition of the Planning and Zoning Board's Preliminary PUD approval
was that the wood fence be framed, not a standard picket fence. Please
provide a detail of the wood fence on the Elevation sheet.
The trash enclosure detail references an "opening". The opening must be
gated.
�t! Please label the front elevation of the existing building as the east elevation.
Please label the end elevation of the existing building as the south elevation.
Please provide north and west elevations of the existing building.
W.1 The south elevation of the proposed garage building is incorrectly labeled as
the west elevation. Please revise.
V,%Please label the side elevation of the proposed garage building as the east
and west elevations.
V, Please provide a north elevation for the proposed garage building.
ZZ Please provide a paint schedule on the elevation sheet which provides
detailed paint colors and product names and stock numbers. Samples of
building colors should be provided with plan revisions.
,s
6r," The Transportation Planning Department requests that a bike rack be added to
the Site Plan.
7. Comments and redline plans from the Engineering Department are attached.
Please return the redline plans to Mike Ludwig with plan revisions.
8. Comments and redline plans from the Water and Wastewater Utility are attached.
Please return the redline plans to Mike Ludwig with plan revisions.
10. Comments and redline plans from the Stormwater Utility are attached. Please
return the redline plans to Mike Ludwig with plan revisions.
•
A. The Attorney's Certification is required on the Plat but not on the Site Plan.
✓c• Please delete the notary block below the Secretary of the Planning and
Zoning Board's signature block.
v/d. Please update or delete general note #3 on the Site Plan (Spring?).
General note #5 states that no liquid petroleum materials/products will be
stored outside. Are liquid petroleum materials/products allowed anywhere
on this site as it was previously contaminated?
Please add a general note to the Site Plan which states: "All rooftop or
ground mounted mechanical equipment is to be fully screened from the
public view."
✓g. Please add a general note to the Site Plan which states: "All trash dumpsters
are to be enclosed and gated. Materials and colors shall be the same or
compatible with the main office/showroom building."
X. Please add a general note to the Site Plan which states: "Bike rack shall be
permanently mounted to concrete, and shall not interfere with pedestrian
access."
Please label Laporte Avenue, W. Mulberry, W. Elizabeth, and S. Shields
Street on the Vicinity Map.
The proposed curb stops and meter pits shown on the Site Plan must be
moved west of the future R.O.W. line.
APlease add a legend to the Site Plan which includes symbols for the
handicap parking stall and bike rack.
J I. Please label the proposed driveway and parking material (concrete or
asphalt?).
�m. The zoning districts indicated on the Site Plan no longer exist. Please revise
these districts to reflect the CityPlan zoning District designations (North -
LMN, South - RL, West - LMN, East - LMN).
Landscape Plan
Section 29-526 G(4)(c)[1]c page 102 of the LDGS states: "proposed plant
materials should be indicated at 10 years of maturity and in appropriate
relation to scale." Please revise the landscape plan accordingly.
Commoty Planning and Environmentaorvices
Current Planning
City of Fort Collins
2?
May 2e, 1997
Bob Sutter
Architectural Horizons
P.O. Box 271217
Fort Collins, CO 80527-1217
Dear Bob,
Staff has reviewed your documents for the Atlas Roofing PUD, Final that were submitted
on April 22, 1997, and would like to offer the following comments:
✓1. The Light and Power Utility stated that development charges will apply for the
entire lot. The applicant should contact Light and Power at 221-6700 to determine
the amount of these charges.
2. The Zoning Department offers the following comments:
✓a. Foundation plantings are needed on the north side of the garage building.
vb. The property is located in the residential neighborhood sign district.
Therefore, the Planning and Zoning Board will review the location of the
proposed wall signage.
✓ 3. The Mapping Department reminds the applicant of the new subdivision plat
requirements which are in effect (specifically, item 2(y) on page 7 of the Final Plat
submittal requirements).
✓ 4. The Advance Planning Department requests that Austrian Pine be substituted for
Pinyon Pine on the landscape plan as additional screening of the parking lot is
needed.
5. The Current Planning Department offers the following comments:
Site Plan
✓a. Please revise the "Allowed Uses" statement on the PUD Site Plan. The B-L,
Limited Business Zone no longer exists. The allowed use should be
"office/showroom plus enclosed vehicle and material storage".
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020