Loading...
HomeMy WebLinkAboutATLAS ROOFING PUD - FINAL - 32-96A - CORRESPONDENCE - REVISIONS (3)Michael Ludwig June 13, 1997 Page Three Z. The Paint schedule has been added to the elevation sheet as directed. Samples of colors are submitted also. 6. The bike rack is shown on the site plan. No change has been made. 7. Red line drawings are returned with this re -submittal. See the letter from TST engineering for responses. 8. Red line drawings are returned with this re -submittal. See the letter from TST engineering for responses. 9. Red line drawings are returned with this re -submittal. See the letter from TST engineering for responses. Based on our recent discussion, submittal of these responses and revised drawings and other documents should allow time for Staff review and scheduling of the Final P & Z review meeting for August 3rd of 17' at the latest. It is my belief that we have addressed all the concerns from the staff that have been brought to our attention at this time. I am aware that scheduling of other projects ahead of us may have an impact on the date of the P & Z Meeting. There should be no further comments from staff that would delay our review. Thank you for your help in addressing the issues relating to the Atlas Roofing PUD. Cordially, 01 L9 & Robert Sutter, AIA Principal CC: Ed Schneider Hugh Green Michael Ludwig June 13, 1997 Page Two e. Liquid petroleum products are allowed if they are stored on concrete slab. Any Liquid Petroleum Products stored on site will be in the garage structure and of small quantities. The storage of such products are a condition of the Agreement for the purchase of the property between Atlas Roofing and the current Owner. The terms of that agreement will not be challenged. f. The general note has been added to the site plan as directed. g. The general note has been added to the site plan as directed. h. The general note has been added to the site plan as directed. Streets have been labeled on the Vicinity Map as directed. Curb stops and meter pits have been relocated as directed. k. The symbol legend has been added to the site plan as directed. Driveways and parking have been labeled as directed. M. Zoning district designations have been modified as directed. Landscape Plan n. I believe that the plantings as originally shown represent the landscape elements at 10 Years of Growth. No changes have been made. o. Symbols on the landscape plan have been changed as directed. P. Size caliper of trees has been clarified as directed. q. Tam Junipers have been changed as directed. Building Elevations y/ Modifications were made to the fence to show a framed look prior to final submittal. A detail has been added as directed to further describe the construction of fencing elements. S. The note on the trash enclosure has been changed to call for a "gated" opening as has been directed. t. Front elevation label has been changed as directed. U. End elevation label has been changed as directed. V. North and west elevations of the existing building have been added as directed. W. The south elevation of the garage has been changed as directed. X. Side elevation labels at the proposed garage structure have been changed as directed. Y. A north elevation of the proposed garage structure has been added as directed. P. O. Box 271217 Fort Collins, Colorado 80527-1217 June 13, 1997 Michael Ludwig Project Planner Current Planning Community Planning and Environmental Services City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522-0580 RE: Response to Staff Final Review Comments for Atlas Roofing PUD. Dear Mike This letter addresses the comments forwarded to my office from various City entities through your office in you letter dated May 27, 1997. It is assumed that since two and one-half weeks have elapsed since your letter, there are no more Staff comments to be addressed as they relate to this Final Submittal of the subject PUD. For ease of review the remainder of this letter will follow the same format of your May 27 letter to me. Charges from Light and Power are acknowledged. 2. Zoning a. Seven Tammy Junipers and an additional tree have been added to the landscape plan at the north side of the Proposed Garage Structure b. Signage review is acknowledged. 3. The subdivision plat complies with the new requirements. 4. . Austrian Pines have been substituted. 5. Current Planning Site Plan a. Allowed uses have been revised as directed. b. Attorney's Certification has been removed as directed. C. The notary block has been removed as directed. d. General Note # 3 has been updated. g Phone(870)225.2704 Faz(s7o)4s&7s27 ctural Horizons 2405 Rollingwood Drive - FL Collins, CO. 80525