I. INTRODUCTION
This transportation impact study addresses the capacity,
geometric, and control requirements at and near Good Samaritan
Village, located west of the College/Trilby intersection in Fort
Collins, Colorado. A scoping meeting was held in May, 1997. This
transportation study addresses the overall development plan (ODP)
issues at full development of the site in the long range future
(year 2015), as well as, the short range analysis depicting a year
2000 condition. The short range analysis will likely meet the
Transportation Impact Analysis for the project development plan
(PDP) submittal requirements.
During the course of the analysis, numerous contacts were made
with the project planning/engineering consultant (Landmark
Engineering) and the management of the existing facility. This
study generally conforms to the format set forth in the Fort
Collins Transportation Impact Study Guidelines. The study involved
the following steps:
- Evaluate the existing conditions;
- Estimate the trip generation by the proposed/assumed
developments;
- Determine the trip distribution of site generated traffic;
- Evaluate level of service for all transportation modes;
- Determine the geometrics at key intersections;
- Determine the impacts of site generated traffic at key
intersections.
Information used in this report was obtained from the City of
Fort Collins, the planning and engineering consultants, the
developers, research sources (ITE, TRB, etc.), and field
reconnaissance. The following traffic studies were reviewed and
considered in preparing this study:
- "Shenandoah Site Access Study," October 1996;
- "Ridgewood Hills Site Access Study," May 1994;
- "Hugh M. Woods Traffic Study," November 1994;
- "Stanton Creek Transportation Impact Study," June 1997.
II. EXISTING CONDITIONS
The location of Good Samaritan Village is shown in Figure 1.
It is important that a thorough understanding of the existing
conditions be presented.
1
LIST OF FIGURES
Figure
Page
1.
Site Location ........................................
2
2.
Recent Peak Hour Traffic .............................
4
3.
Site Plan ............................................
7
4.
Trip Distribution ....................................
10
5.
Short Range Background Peak Hour Traffic .............
it
6.
Long Range Background Peak Hour Traffic ..............
12
7.
Short Range Site Traffic .............................
13
8.
Long Range Site Traffic ..............................
14
9.
Existing Total Traffic ...............................
15
10.
Short Range Total Traffic ............................
16
11.
Long
Range
Total
Traffic
............................. 18
12.
Long
Range
Daily
Traffic
............................. 19
13.
Short
Range
Geometry .................................
26
14.
Long
Range
Geometry ..................................
27
APPENDIX
A Recent Traffic Counts
B Current Peak Hour Operation
C Description of Level of Service
D Short Range Background Traffic Operation
E Long Range Background Traffic Operation
F Existing Total Traffic Operation
G Short Range Total Traffic Operation
H Long Range Total Traffic Operation
I Pedestrian and Bicycle Level of Service
TABLE OF CONTENTS
Page
I. Introduction .......................................... 1
II. Existing Conditions .................................. 1
LandUse ............................................. 3
Roads................................................ 3
Existing Motor Vehicle Traffic ....................... 3
Existing Motor Vehicle Operation ..................... 3
Pedestrian Facilities ................................ 6
Bicycle Facilities ................................... 6
Transit Facilities ................................... 6
III. Proposed Development ................................. 6
TripGeneration ...................................... 8
Trip Distribution .................................... 8
Background Traffic ................................... 8
Trip Assignment ........... 8
SignalWarrants ...................................... 17
OperationsAnalysis .................................. 17
GeometricAnalysis ................................... 23
Pedestrian Level of Service .......................... 23
Bicycle Level of Service ............................. 28
Transit Level of Service ............................. 28
IV. Neighborhood Issues .................................. 28
V. Conclusions .......................................... 29
LIST OF TABLES
Table
Page
1. Existing Peak Hour Operation ......................... 6
2. Trip Generation ...................................... 9
3. Short Range Background Peak Hour Operation ........... 20
4. Long Range Background Peak Hour Operation ............ 21
5'. Existing Plus Site Peak Hour Operation ............... 22
6. Short Range Total Peak Hour Operation ................ 24
7. Long Range Total Peak Hour Operation ................. 25
GOOD SAMARITAN VILLAGE
OVERALL DEVELOPMENT PLAN
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
AUGUST 1997
Prepared for:
Landmark Engineering Ltd.
3521 West Eisenhower Boulevard
Loveland, CO 80537
Prepared by:
MATTHEW J. DELICH, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034