HomeMy WebLinkAboutGOOD SAMARITAN VILLAGE - PDP - 27-96B - CORRESPONDENCE - (11)d. Engineering must also be provided a copy of the documentation of the off -site
stormwater easement.
4. Current Planning:
a. The project has tentatively been scheduled for the May 20, 1999 Planning and
Zoning Board hearing provided you can satisfy staffs concerns and supply PMT's
and renderings to us by Tuesday May 41n
If you have any questions about these or any other issues related to this project please feel
free to call me at 221-6750.
ours truly,
V"
Troy ones
City Planner
cc: Tim Blandford
2
Commi iy Planning and Environmental rvices
Current Planning
City of Fort Collins
STAFF REVIEW COMMENTS
Kim Lambrecht
Landmark Engineering
3521 W. Eisenhower Blvd.
Loveland, CO 80537
April 28, 1999
Staff reviewed the Submittal of the Good Samaritan Village PDP and offers the following
comments.
COMMENTS:
1. Transportation Planning:
a. 5 foot sidewalks on the interior of the site are OK.
b. You still need to provide bicycle parking in front of the existing building.
c. You need to provide striped pedestrian crosswalks at the 3 locations where the
western private drive has parking lot driveway access points. The first being the
parking lot access on the south side of the existing building, the second being the
first parking lot entrance on the parking lot west of the existing long term care
facility, and the third being the driveway access to the maintenance and service
building.
d. Whatever you work out with Tim Blandford on the design of the Trilby
island/median pedestrian safe area will satisfy transportation's concerns for the
crosswalk.
2. Stormwater:
a. You have satisfied all their concerns that are required to be addressed prior to the
P&Z hearing, however you will need to follow up on a few issues for final
compliance.
3. Engineering Department:
a. All on site easements (including stormwater ponds) must be dedicated on the plat.
b. Stanley Dunn from Landmark and Tim Blandford are going to meet on Friday
4/30 to discuss the requirements for Trilby Rd. cross sections and the Trilby
median/island.
c. The variance request has been approved by Cam McNair, the City Engineer.