Loading...
HomeMy WebLinkAboutEDUCATION / LIFESTYLE TRAINING CENTER - R-C SITE PLAN REVIEW - 31-96 - CORRESPONDENCE - STORMWATER-RELATED DOCUMENTS (3)From: Basil Hamdan To: FC7.FACILITIES.SWHITE Date: 1 /7/97 10:23am Subject: ELTC Project Storm Water Drainage -Reply Steve, I talked to Mike Ludwig this morning, he was asking me if all storm drainage issues were satisfied so that he could record the site and landscape plan on the ELTC building improvements. I received youe e-mail message from yesterday stating that you were going to install the pan out to Linden Street. Based on our communication last week, in order to shorten the turn -around time we had mutually agreed that you would send me a letter stating that the pan will be built with a positive fall from your site to Linden Street, since there were no elevations called out on the site plan, we also wanted at least a verbal commitment that all grading was to take place on your site with no off -site grading since the construction limits were close to the property line. Mike indicated that he will hold off recording the site and landscape plans until that is completed, so if you could please send me that letter by email, it would be greatly appreciated since I did not want to delay that project. A signed copy of the letter can follow in inter -departmental mail later, but this way we could get something going as soon as possible. Thanks for your help, Basil Harridan Civil Engineer II Water Utilities CC: FC1.CPES.MLUDWIG, GSCHLUETER